<?xml version='1.0' encoding='UTF-8'?><?xml-stylesheet href="http://www.blogger.com/styles/atom.css" type="text/css"?><feed xmlns='http://www.w3.org/2005/Atom' xmlns:openSearch='http://a9.com/-/spec/opensearchrss/1.0/' xmlns:blogger='http://schemas.google.com/blogger/2008' xmlns:georss='http://www.georss.org/georss' xmlns:gd="http://schemas.google.com/g/2005" xmlns:thr='http://purl.org/syndication/thread/1.0'><id>tag:blogger.com,1999:blog-6971364236690368725</id><updated>2024-11-01T20:00:27.479+09:00</updated><category term="福島原発 チェルノブイリの10倍 チェルノブイリ"/><category term="Vancouver"/><category term="浅田真央"/><category term="安藤美姫"/><category term="0 チェルノブ　炉心溶融　メルトダウン meltdown チェルノブイリ"/><category term="東電  勝俣恒久　記者会見 生中継"/><category term="澤田哲生"/><category term="福島原発　津波14メートル　14メートル 原発"/><category term="鈴木明子"/><category term="2012 London"/><category term="2014 Sochi"/><category term="2016 Rio de Janeiro"/><category term="4/17 動画 東電 会長 勝俣会長 会見 記者会見 勝俣恒久 福島原発 記者クラブ"/><category term="Alpine Skiing"/><category term="Biathlon"/><category term="Bobsleigh"/><category term="Cross-Country"/><category term="Curling"/><category term="Figure Skating"/><category term="Freestyle Skiing"/><category term="Fukushima Daiichi Nuclear Power Station First Response"/><category term="HTV2 こうのとり:打上げ 動画"/><category term="IAEA Yukiya Amano　TEPCO Masataka Shimizu"/><category term="IAEA 天野之弥 Yukiya Amano BBC 清水正孝 Masataka Shimizu 3rd Reich"/><category term="Ice Hockey"/><category term="Joannie Rochette"/><category term="Luge"/><category term="NHK フジ 澤田哲生 福島原発 山崎淑行 山崎 山崎記者 東電 清水正孝 今井義典"/><category term="NHK 山崎"/><category term="NHK 山崎　チェルノブイリ"/><category term="NHK 山崎　山崎淑行"/><category term="NHK　科学文化部　ツイッター"/><category term="Nordic Combined"/><category term="Paralympics"/><category term="Short Track"/><category term="Skelton"/><category term="Ski Jumping"/><category term="Snowboard"/><category term="Speed Skating"/><category term="さくら 開花予想"/><category term="まだらめ　班目春樹 原子力安全委員長"/><category term="アイスホッケー"/><category term="アルペン"/><category term="エープリル・フール　産経　東電"/><category term="カーリング"/><category term="クロスカントリー"/><category term="ショートトラック"/><category term="ジャンプ"/><category term="スケルトン"/><category term="スターズオンアイス2011"/><category term="スノーボード"/><category term="スピードスケート"/><category term="ソチ　世界フィギュア　村上佳菜子　庄司理紗"/><category term="チェルノブ　炉心溶融　メルトダウン meltdown チェルノブイリ"/><category term="チェルノブイリ"/><category term="ニコ動　ニコニコ動画　癒着　手下　東電　東電の手下　配下　岩上安身"/><category term="ニコ動　癒着　手下　東電　東電の手下"/><category term="ノルディック複合"/><category term="ハイパーレスキュー　福島原発 東京消防庁"/><category term="バイアスロン"/><category term="バンクーバー"/><category term="バンクーバー閉会式"/><category term="フィギュア"/><category term="フリースタイル"/><category term="ボブスレー"/><category term="ミネラルウォーター　放射　売り切れ"/><category term="モニタリングポスト　福島原発"/><category term="リュージュ"/><category term="レベル7"/><category term="レベル7 福島原発 チェルノブイリ 保安院 メルトダウン"/><category term="ンラディン死亡 ビンラディン 死 Osama bin Laden death dead"/><category term="上原春男"/><category term="上垣内修　気象庁"/><category term="世界フィギュア ジュニア 2011"/><category term="中村幸一郎　天野之弥 清水正孝　望月晴文 IAEA"/><category term="伊藤リオン 石本 石元 公判 海老蔵"/><category term="伊藤リオン 石本　石元　初公判 海老蔵"/><category term="再臨界　大連立"/><category term="副島隆彦 福島原発　現地レポート"/><category term="動画 最新動画 安藤美姫 浅田真央 村上佳菜子 全日本フィギュア2010"/><category term="動画 浅田真央 安藤美姫 村上佳菜子 全日本フィギュア"/><category term="動画 班目 班目春樹 寺坂信昭 原子力"/><category term="動画　福島原発　爆発　メルト・ダウン"/><category term="勘坂康弘　社長  ユッケ 生食　食中毒フーズ・フォーラス　えびす"/><category term="勝俣恒久 公安 学生3名 逮捕"/><category term="勝俣恒久 東電 清水正孝"/><category term="南三陸町　大槌町　１万人"/><category term="南三陸町　１万人　安否不明"/><category term="原子力学会　倫理"/><category term="四大陸　フィギュア 浅田真央 安藤美姫"/><category term="大槌町 １万人"/><category term="天野之弥　清水正孝　先輩　後輩　NHK"/><category term="小向美奈子 セブ島"/><category term="山崎淑行　関村直人　安全デマ"/><category term="島原発 チェルノブイリの10倍 チェルノブイリ"/><category term="斉藤和義 ずっとウソ"/><category term="斉藤紀　わたり病院　NHK"/><category term="東京電力 終り"/><category term="東京電力 計画停電の予定"/><category term="東京電力　解体"/><category term="東通原発"/><category term="東通原発　パッキン"/><category term="東電 天野之弥 清水正孝 IAEA Yukiya Amano Masataka Shimizu 原子力ロビー"/><category term="東電 放射能 シミュレーション"/><category term="東電　副社長"/><category term="東電　社長　清水正孝 記者会見 動画"/><category term="枝野　メルトダウン"/><category term="枝野　安全デマ"/><category term="株価大暴落 計画停電 輪番停電"/><category term="民放"/><category term="沢尻エリカ 離婚"/><category term="浅田真央 安藤美姫 動画 最新動画"/><category term="浅田真央 安藤美姫 四大陸 動画  エキシビション"/><category term="浅田真央 安藤美姫 四大陸 動画 最新動画"/><category term="浜岡 原発 海水"/><category term="浜岡原発 停止要請 菅直人"/><category term="清水正孝 現在 近況"/><category term="清水正孝 辞任"/><category term="無人偵察機　グローバルホーク　映像　尖閣　非公開"/><category term="無能 菅 菅直人 澤田哲生 中島健 御用学者 福島原発 線量計"/><category term="班目春樹 藤家洋一 松浦祥次郎 原子力"/><category term="田原総一朗　原発　朝まで"/><category term="石原慎太郎　当確　当選　４選"/><category term="石原慎太郎　放射性ヨウ素"/><category term="福島原発 動画 メルトダウン　チェルノブイリの1"/><category term="福島原発 動画 メルトダウン　チェルノブイリの10倍 チェルノブイリ"/><category term="福島原発 最優秀報道"/><category term="福島原発　 窒素　爆発"/><category term="福島原発　NBC部隊　N部隊"/><category term="福島原発　メルトダウン"/><category term="福島原発　メルトダウン　菅"/><category term="福島原発　利権"/><category term="福島原発　動画　避難地域 神保哲生"/><category term="福島原発　勝俣恒久 東電 記者会見 録画　全録画　ニコ動　ニコニコ動画　癒着　手下　東電　東電の手下　配下　岩上安身"/><category term="福島原発　小出裕章　インタビュー"/><category term="福島原発　津波　動画"/><category term="福島原発　脱原発　財団法人"/><category term="福島原発　菅直人"/><category term="福島原発　街宣車"/><category term="福島原発　計画入院　清水正孝　勝俣恒久 東電 記者会見 録画　全録画　ニコ動　ニコニコ動画　癒着　手下　東電　東電の手下　配下　岩上安身"/><category term="福島原発　計画入院　清水正孝　勝俣恒久 東電　今井義典　無能　菅直人"/><category term="脱原発 福島みずほ"/><category term="菅 菅直人　福島原発　チェルノブイリ"/><category term="菅直人 献金 石原慎太郎 出馬"/><category term="菅直人　福島原発　浜岡原発"/><category term="西山英彦　ヅラ　プルトニウム　29億ベクレル"/><category term="言論統制 無能 菅直人 枝野 自主削除"/><category term="言論統制　自主削除　総務省　菅　枝野　流言飛語"/><category term="金妍児"/><category term="陸前高田市"/><category term="非常電源　危機"/><category term="飯館村　枝野"/><category term="３号機"/><category term="Ｍ8.8 関東大震災 阪神大震災"/><title type='text'>jp311</title><subtitle type='html'>Fukushima Meltdown</subtitle><link rel='http://schemas.google.com/g/2005#feed' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/posts/default'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default?redirect=false'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/'/><link rel='hub' href='http://pubsubhubbub.appspot.com/'/><link rel='next' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default?start-index=26&amp;max-results=25&amp;redirect=false'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><generator version='7.00' uri='http://www.blogger.com'>Blogger</generator><openSearch:totalResults>178</openSearch:totalResults><openSearch:startIndex>1</openSearch:startIndex><openSearch:itemsPerPage>25</openSearch:itemsPerPage><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-5116348670506976635</id><published>2011-06-29T19:55:00.000+09:00</published><updated>2011-06-29T19:55:44.758+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="Fukushima Daiichi Nuclear Power Station First Response"/><title type='text'>First Response in Fukushima Daiichi Nuclear Power Station</title><content type='html'>First Response at Tohoku Chihou Taiheiyou Oki Earthquake in Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
We have put all efforts on settlement of the situation as the first &lt;br /&gt;
priority regarding the severe accident of the nuclear power station caused &lt;br /&gt;
by Tohoku Chihou Taiheiyou Oki Earthquake occurred on March 11, and &lt;br /&gt;
conducted a thorough survey and review on the accident.&lt;br /&gt;
This time, we would like to inform the facts on the first response at &lt;br /&gt;
Tohoku Chihou Taiheiyou Oki Earthquake in Fukushima Daiichi Nuclear Power &lt;br /&gt;
Station, based on various information sources as of today and interviews &lt;br /&gt;
with the relevant persons. In case that we find new facts through further &lt;br /&gt;
surveys, we would like to inform on another occasion. &lt;br /&gt;
Appendix1:List of Documents on Response in Fukushima Daiichi Nuclear Power Station(PDF 8.18KB)&lt;br /&gt;
&lt;a href=&quot;http://www.tepco.co.jp/en/press/corp-com/release/betu11_e/images/110618e3.pdf&quot;&gt;http://www.tepco.co.jp/en/press/corp-com/release/betu11_e/images/110618e3.pdf&lt;/a&gt;&lt;br /&gt;
Appendix2:Fukushima Daiichi Nuclear Power Station Response after the earthquake(PDF 485KB)&lt;br /&gt;
&lt;a href=&quot;http://www.tepco.co.jp/en/press/corp-com/release/betu11_e/images/110618e15.pdf&quot;&gt;http://www.tepco.co.jp/en/press/corp-com/release/betu11_e/images/110618e15.pdf&lt;/a&gt;&lt;br /&gt;
&lt;a href=&quot;http://www.tepco.co.jp/en/press/corp-com/release/11061805-e.html&quot;&gt;http://www.tepco.co.jp/en/press/corp-com/release/11061805-e.html&lt;/a&gt;&lt;br /&gt;
Press Release (Jun 18,2011)&lt;br /&gt;
&lt;br /&gt;
Appendix1:List of Documents on Response in Fukushima Daiichi Nuclear Power Station(PDF 8.18KB)&lt;br /&gt;
&lt;a href=&quot;http://www.tepco.co.jp/en/press/corp-com/release/betu11_e/images/110618e3.pdf&quot;&gt;http://www.tepco.co.jp/en/press/corp-com/release/betu11_e/images/110618e3.pdf&lt;/a&gt;&lt;br /&gt;
Page 1 Page 1&lt;br /&gt;
List of Documents on Response in Fukushima Daiichi List of Documents on Response in Fukushima Daiichi&lt;br /&gt;
Nuclear Power Station Nuclear Power Station&lt;br /&gt;
○First Response at the Earthquake in Fukushima Daiichi Nuclear Power ○ First Response at the Earthquake in Fukushima Daiichi Nuclear Power&lt;br /&gt;
Station Station&lt;br /&gt;
○Main Timeline of Unit 1 of Fukushima Daiichi Nuclear Power Station from ○ Main Timeline of Unit 1 of Fukushima Daiichi Nuclear Power Station from&lt;br /&gt;
the Occurrence of the Earthquake to March 12 (Sat) the Occurrence of the Earthquake to March 12 (Sat)&lt;br /&gt;
・Response regarding Alternative Water Injection for Unit 1 of Fukushima ? Response regarding Alternative Water Injection for Unit 1 of Fukushima&lt;br /&gt;
Daiichi Nuclear Power Station Daiichi Nuclear Power Station&lt;br /&gt;
・Response regarding Ventilation Operation for Primary Containment ? Response regarding Ventilation Operation for Primary Containment&lt;br /&gt;
Vessel of Unit 1 of Fukushima Daiichi Nuclear Power Station Vessel of Unit 1 of Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
○Main Timeline of Unit 2 of Fukushima Daiichi Nuclear Power Station from ○ Main Timeline of Unit 2 of Fukushima Daiichi Nuclear Power Station from&lt;br /&gt;
the Occurrence of the Earthquake to March 15 (Tue) the Occurrence of the Earthquake to March 15 (Tue)&lt;br /&gt;
・Response regarding Alternative Water Injection for Unit 2 of Fukushima ? Response regarding Alternative Water Injection for Unit 2 of Fukushima&lt;br /&gt;
Daiichi Nuclear Power Station Daiichi Nuclear Power Station&lt;br /&gt;
・Response regarding Ventilation Operation for Primary Containment ? Response regarding Ventilation Operation for Primary Containment&lt;br /&gt;
Vessel of Unit 2 of Fukushima Daiichi Nuclear Power Station Vessel of Unit 2 of Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
○Main Timeline of Unit 3 of Fukushima Daiichi Nuclear Power Station from ○ Main Timeline of Unit 3 of Fukushima Daiichi Nuclear Power Station from&lt;br /&gt;
the Occurrence of the Earthquake to March 15 (Tue) the Occurrence of the Earthquake to March 15 (Tue)&lt;br /&gt;
・Response regarding Alternative Water Injection for Unit 3 of Fukushima ? Response regarding Alternative Water Injection for Unit 3 of Fukushima&lt;br /&gt;
Daiichi Nuclear Power Station Daiichi Nuclear Power Station&lt;br /&gt;
・Response regarding Ventilation Operation for Primary Containment ? Response regarding Ventilation Operation for Primary Containment&lt;br /&gt;
Page 2 Page 2&lt;br /&gt;
Vessel of Unit 3 of Fukushima Daiichi Nuclear Power Station Vessel of Unit 3 of Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
○Main Timeline of Unit 4, 5 &amp; 6 of Fukushima Daiichi Nuclear Power Station ○ Main Timeline of Unit 4, 5 &amp; 6 of Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
from the Occurrence of the Earthquake to March 15 (Tue) from the Occurrence of the Earthquake to March 15 (Tue)&lt;br /&gt;
End End&lt;br /&gt;
Original Japanese text:&lt;br /&gt;
Vessel of Unit 3 of Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
Contribute a better translation&lt;br /&gt;
http://www.tepco.co.jp/en/press/corp-com/release/betu11_e/images/110618e15.pdf&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Appendix2:Fukushima Daiichi Nuclear Power Station Response after the earthquake(PDF 485KB)&lt;br /&gt;
&lt;a href=&quot;http://www.tepco.co.jp/en/press/corp-com/release/betu11_e/images/110618e15.pdf&quot;&gt;http://www.tepco.co.jp/en/press/corp-com/release/betu11_e/images/110618e15.pdf&lt;/a&gt;&lt;br /&gt;
Page 1 Page 1&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
Response after the earthquake Response after the earthquake&lt;br /&gt;
This document is a summary of the latest information obtained through information and This document is a summary of the latest information obtained through information and&lt;br /&gt;
interviews with personnel concerned. We will continue investigation and announce interviews with personnel concerned. We will continue investigation and announce&lt;br /&gt;
when new facts and findings are obtained. when new facts and findings are obtained.&lt;br /&gt;
○Activities between occurrence of the Great East Japan Earthquake at 14:46, ○ Activities between occurrence of the Great East Japan Earthquake at 14:46,&lt;br /&gt;
March 11 to the first tsunami hit the site at 15:27 on March 11. March 11 to the first tsunami hit the site at 15:27 on March 11.&lt;br /&gt;
【 Evacuation and safety confirmation 】 Evacuation and safety confirmation []&lt;br /&gt;
・ Personnel in the administration building evacuated to the parking lot in front of the ? Personnel in the administration building evacuated to the parking lot in front of the&lt;br /&gt;
building and called over the names. Emergency response personnel stationed in the building and called over the names. Emergency response personnel stationed in the&lt;br /&gt;
Anti-Seismic Building (TSC Building) and started response. Everyone was familiar Anti-Seismic Building (TSC Building) and started response. Everyone was familiar&lt;br /&gt;
with evacuation route because emergency drill was done just a week before the with evacuation route because emergency drill was done just a week before the&lt;br /&gt;
earthquake. earthquake.&lt;br /&gt;
【 SCRAM Response 】 SCRAM Response []&lt;br /&gt;
&lt;Main Control Room of Unit 1/2&gt; &lt;Main Control Room of Unit 1/2&gt;&lt;br /&gt;
・ Operators started normal scram response after the shaking trailed off. Shift ? Operators started normal scram response after the shaking trailed off. Shift&lt;br /&gt;
Supervisor confirmed scram of the units and supervised response in between the Supervisor confirmed scram of the units and supervised response in between the&lt;br /&gt;
unit 1 and 2 control panels. Each operator was assigned to control panels and Chief unit 1 and 2 control panels. Each operator was assigned to control panels and Chief&lt;br /&gt;
Operator conducted monitoring and operation, also reported plant situation to Shift Operator conducted monitoring and operation, also reported plant situation to Shift&lt;br /&gt;
Supervisor. Supervisor.&lt;br /&gt;
・ At 14:52, operators confirmed automatic start up of the Isolation Condenser (IC) at ? At 14:52, operators confirmed automatic start up of the Isolation Condenser (IC) at&lt;br /&gt;
Unit 1. Because reactor water stayed in normal level, operators decided to use HPCI Unit 1. Because reactor water stayed in normal level, operators decided to use HPCI&lt;br /&gt;
when water level dropped and to control reactor pressure by IC. when water level dropped and to control reactor pressure by IC.&lt;br /&gt;
・ At 15:03, reactor pressure of Unit 1 dropped so fast and the reactor coolant ? At 15:03, reactor pressure of Unit 1 dropped so fast and the reactor coolant&lt;br /&gt;
temperature decreased 55 C per hour, exceeding a criteria in the Tech.Spec. Then temperature decreased 55 C per hour, exceeding a criteria in the Tech.Spec. Then&lt;br /&gt;
operators closed MO-3A and 3B, return isolation valves of IC. IC was in stand-by operators closed MO-3A and 3B, return isolation valves of IC. IC was in stand-by&lt;br /&gt;
condition with other valves in the IC remained open. Operators judged that only one condition with other valves in the IC remained open. Operators judged that only one&lt;br /&gt;
train of IC was sufficient to control the reactor pressure in 6 -- 7 MPa. They decided train of IC was sufficient to control the reactor pressure in 6 - 7 MPa. They decided&lt;br /&gt;
to use Train A and started to control the pressure by operating MO-3A. to use Train A and started to control the pressure by operating MO-3A.&lt;br /&gt;
・ As for Unit 2, RCIC was started manually but tripped because of high reactor water ? As for Unit 2, RCIC was started manually but tripped because of high reactor water&lt;br /&gt;
level. After that, RCIC was started manually again. level. After that, RCIC was started manually again.&lt;br /&gt;
&lt;Main Control Room of Unit 3/4&gt; &lt;Main Control Room of Unit 3/4&gt;&lt;br /&gt;
・ MCR became white as if laid a smoke screen by dust caused by the earthquake. ? MCR became white as if laid a smoke screen by dust caused by the earthquake.&lt;br /&gt;
Page 2 Page 2&lt;br /&gt;
After the shaking was trailed off, operators started normal scram response. Shift After the shaking was trailed off, operators started normal scram response. Shift&lt;br /&gt;
Supervisor was reported plant scrams. Emergency Diesel Generator (DG) started Supervisor was reported plant scrams. Emergency Diesel Generator (DG) started&lt;br /&gt;
up due to loss of off-site power. Emergency bus was confirmed to be charged by up due to loss of off-site power. Emergency bus was confirmed to be charged by&lt;br /&gt;
DG. DG.&lt;br /&gt;
・ At Unit 3, RCIC was manually started but tripped by high reactor water level. ? At Unit 3, RCIC was manually started but tripped by high reactor water level.&lt;br /&gt;
・ After the earthquake, safety of the operators was checked. Earthquake and Tsunami ? After the earthquake, safety of the operators was checked. Earthquake and Tsunami&lt;br /&gt;
alert were paged to the plant workers. alert were paged to the plant workers.&lt;br /&gt;
&lt;Main Control Room of Unit 5/6&gt; &lt;Main Control Room of Unit 5/6&gt;&lt;br /&gt;
・ Shift Supervisor were checking control panel at his desk and securing his safety ? Shift Supervisor were checking control panel at his desk and securing his safety&lt;br /&gt;
until the shaking trailed off. Other operators also secured their safety at the same until the shaking trailed off. Other operators also secured their safety at the same&lt;br /&gt;
time paid attention to monitoring panels. After the shaking, operators checked time paid attention to monitoring panels. After the shaking, operators checked&lt;br /&gt;
alarms. Most of the alarms was sounding at that time. alarms. Most of the alarms was sounding at that time.&lt;br /&gt;
・ Since Paging and ITV were unavailable, PHS (Personal Handy phone System: like ? Since Paging and ITV were unavailable, PHS (Personal Handy phone System: like&lt;br /&gt;
cell phone) was utilized to order evacuation for field workers. Shift operators cell phone) was utilized to order evacuation for field workers. Shift operators&lt;br /&gt;
returned to the MCR after gathered in anteroom. returned to the MCR after gathered in anteroom.&lt;br /&gt;
○ Activities after Loss of all AC Power at 15:42 on March 11 ○ Activities after Loss of all AC Power at 15:42 on March 11&lt;br /&gt;
【Situation at Main Control Room of Unit 1/2】 - Situation at Main Control Room of Unit 1 / 2]&lt;br /&gt;
・ Lighting and indicators in the MCR gradually fading due to loss of all AC power. ? Lighting and indicators in the MCR gradually fading due to loss of all AC power.&lt;br /&gt;
Sound of alarm was lost, too. In Unit 1-side of MCR, only emergency lights remained. Sound of alarm was lost, too. In Unit 1-side of MCR, only emergency lights remained.&lt;br /&gt;
In Unit 2- side, all lighting was lost and it became completely dark. By command of In Unit 2 - side, all lighting was lost and it became completely dark. By command of&lt;br /&gt;
Shift Supervisor, operators checked availability of equipment in MCR. Shift Supervisor, operators checked availability of equipment in MCR.&lt;br /&gt;
・ For Unit1, IC and HPCI were operable by DC power. However, valve status of IC ? For Unit1, IC and HPCI were operable by DC power. However, valve status of IC&lt;br /&gt;
was not indicated on the control panel. Operators judged HPCI was not operable was not indicated on the control panel. Operators judged HPCI was not operable&lt;br /&gt;
because indicators on the control panel were gradually faded. For Unit 2, operating because indicators on the control panel were gradually faded. For Unit 2, operating&lt;br /&gt;
status of RCIC became unknown. status of RCIC became unknown.&lt;br /&gt;
・ At 15:50, instrumentation power was lost and reactor water levels for Units 1 and 2 ? At 15:50, instrumentation power was lost and reactor water levels for Units 1 and 2&lt;br /&gt;
became unknown. became unknown.&lt;br /&gt;
・ Communication between MCR and the site emergency response headquarters was ? Communication between MCR and the site emergency response headquarters was&lt;br /&gt;
limited to a hot-line and fixed-line phone, it was not able to use PHS. limited to a hot-line and fixed-line phone, it was not able to use PHS.&lt;br /&gt;
【Situation at Main Control Room of Unit 3/4】 - Situation at Main Control Room of Unit 3 / 4]&lt;br /&gt;
・ Due to loss of all AC power, lighting in MCR was emergency light only. Since Unit 4 ? Due to loss of all AC power, lighting in MCR was emergency light only. Since Unit 4&lt;br /&gt;
was in refueling outage and completely defueled, parameters such as reactor water was in refueling outage and completely defueled, parameters such as reactor water&lt;br /&gt;
level was checked mainly focused at Unit 3. This was conducted with flashlights. level was checked mainly focused at Unit 3. This was conducted with flashlights.&lt;br /&gt;
・ Per operating procedure at the time of loss of AC power, unnecessary load was cut ? Per operating procedure at the time of loss of AC power, unnecessary load was cut&lt;br /&gt;
to extend battery life for RCIC and HPCI. to extend battery life for RCIC and HPCI.&lt;br /&gt;
Page 3 Page 3&lt;br /&gt;
・ At 16:03, RCIC was manually started, parameters like discharge pressure and ? At 16:03, RCIC was manually started, parameters like discharge pressure and&lt;br /&gt;
rotating speed were confirmed in MCR. Operating status was monitored and made rotating speed were confirmed in MCR. Operating status was monitored and made&lt;br /&gt;
HPCI start up ready. HPCI start up ready.&lt;br /&gt;
【Situation at Main Control Room of Unit 5/6】 - Situation at Main Control Room of Unit 5 / 6]&lt;br /&gt;
・ Two DGs at Unit 5 and two DGs at Unit 6 were stopped simultaneously by the ? Two DGs at Unit 5 and two DGs at Unit 6 were stopped simultaneously by the&lt;br /&gt;
tsunami. One remained DG at Unit 6 continued operation with adjusting frequency. tsunami. One remained DG at Unit 6 continued operation with adjusting frequency.&lt;br /&gt;
・ MCR at Unit 5 lost lighting and emergency lights put on, but these emergency lights ? MCR at Unit 5 lost lighting and emergency lights put on, but these emergency lights&lt;br /&gt;
faded gradually then MCR became dark. MCR at Unit 6 was same as normal. faded gradually then MCR became dark. MCR at Unit 6 was same as normal.&lt;br /&gt;
・ ?&lt;br /&gt;
【 Restoration of MCR Instrumentation 】 [Restoration of MCR Instrumentation]&lt;br /&gt;
・ The restoration team in the site emergency ? The restoration team in the site emergency&lt;br /&gt;
response headquarters prepared for necessary response headquarters prepared for necessary&lt;br /&gt;
documents and drawings to restore power in MCRs. documents and drawings to restore power in MCRs.&lt;br /&gt;
Also they started to gather batteries and cables Also they started to gather batteries and cables&lt;br /&gt;
at offices of contractor&#39;s office in the site. The at offices of contractor&#39;s office in the site. The&lt;br /&gt;
team carried batteries and cables which were team carried batteries and cables which were&lt;br /&gt;
collected in the site to MCR of Unit 1/2. Then collected in the site to MCR of Unit 1 / 2. Then&lt;br /&gt;
confirming drawings, they started to connect confirming drawings, they started to connect&lt;br /&gt;
the batteries to instrument panel in the MCR . At the batteries to instrument panel in the MCR. At&lt;br /&gt;
the event of “ECCS was unavailable to inject water the event of &quot;ECCS was unavailable to inject water&lt;br /&gt;
into the reactor”, a top priority was to understand into the reactor &quot;, a top priority was to understand&lt;br /&gt;
the status of water injection into the RPV. So the status of water injection into the RPV. So&lt;br /&gt;
restoration work was focused on connecting restoration work was focused on connecting&lt;br /&gt;
batteries to reactor water indicator which functions batteries to reactor water indicator which functions&lt;br /&gt;
by DC power. by DC power.&lt;br /&gt;
・ Reactor water levels were become clear for Unit 1 ? Reactor water levels were become clear for Unit 1&lt;br /&gt;
at 21:19 and for Unit 2 at 21:50. at 21:19 and for Unit 2 at 21:50.&lt;br /&gt;
・ The restoration team of the emergency response headquarters installed a small ? The restoration team of the emergency response headquarters installed a small&lt;br /&gt;
generator to restore lighting in MCR. Temporary lights were installed in MCR of Unit generator to restore lighting in MCR. Temporary lights were installed in MCR of Unit&lt;br /&gt;
1/2 at 20:49 and Unit 3/4 at 21:58. 1 / 2 at 20:49 and Unit 3 / 4 at 21:58.&lt;br /&gt;
【 Securing Power Supply, Starting Restoration Work 】 - Securing Power Supply, Starting Restoration Work]&lt;br /&gt;
＜ Securing Power Supply Vehicle ＞ &lt;Securing Power Supply Vehicle&gt;&lt;br /&gt;
・ Corporate Distribution Department ordered branch offices to secure high and low ? Corporate Distribution Department ordered branch offices to secure high and low&lt;br /&gt;
voltage power supply vehicles and confirm driving route to Fukushima Diichi NPS. voltage power supply vehicles and confirm driving route to Fukushima Diichi NPS.&lt;br /&gt;
・ Although high and low voltage power supply vehicles headed to Fukushima Daiichi, ? Although high and low voltage power supply vehicles headed to Fukushima Daiichi,&lt;br /&gt;
Temporary Batteries were used to Temporary Batteries were used to&lt;br /&gt;
supply power to instrumentation supply power to instrumentation&lt;br /&gt;
Checking indicators with flashlight Checking indicators with flashlight&lt;br /&gt;
Page 4 Page 4&lt;br /&gt;
they were not able to drive up to the site fast enough because of damages of roads they were not able to drive up to the site fast enough because of damages of roads&lt;br /&gt;
and traffic jam . It was considered to transport the power supply vehicles by and traffic jam. It was considered to transport the power supply vehicles by&lt;br /&gt;
choppers of the Self Defense Force, but it turned out that the weight of the vehicles choppers of the Self Defense Force, but it turned out that the weight of the vehicles&lt;br /&gt;
were too heavy to carry. TEPCO requested Tohoku Electric Power Company to were too heavy to carry. TEPCO requested Tohoku Electric Power Company to&lt;br /&gt;
dispatch power supply vehicles to Fukushima Daiichi NPS. dispatch power supply vehicles to Fukushima Daiichi NPS.&lt;br /&gt;
&lt;Soundness Check of Power Supply Equipment&gt; &lt;Soundness Check of Power Supply Equipment&gt;&lt;br /&gt;
・ As a result of equipment soundness check, it turned out that breakers were ? As a result of equipment soundness check, it turned out that breakers were&lt;br /&gt;
dropped and not usable in the switchyard and off-site power would not be dropped and not usable in the switchyard and off-site power would not be&lt;br /&gt;
restored soon. Also DGs were not operable and difficult to be restored soon restored soon. Also DGs were not operable and difficult to be restored soon&lt;br /&gt;
because they were submerged. It was concluded that power restoration using because they were submerged. It was concluded that power restoration using&lt;br /&gt;
power supply vehicles were necessary. power supply vehicles were necessary.&lt;br /&gt;
・ Visual inspections for inundation status and damages on exterior and insulation ? Visual inspections for inundation status and damages on exterior and insulation&lt;br /&gt;
resistance tests were conducted on the power panels (M/C and P/C) in the turbine resistance tests were conducted on the power panels (M / C and P / C) in the turbine&lt;br /&gt;
buildings (part of them are not in the turbine building). It was confirmed that all of the buildings (part of them are not in the turbine building). It was confirmed that all of the&lt;br /&gt;
M/C and P/C at Units 1 and 3 was inoperable, all of the M/C at Unit 2 was also M / C and P / C at Units 1 and 3 was inoperable, all of the M / C at Unit 2 was also&lt;br /&gt;
inoperable, part of P/C at Unit 2 was operable. (later we confirmed 4 out of 7 P/Cs inoperable, part of P / C at Unit 2 was operable. (later we confirmed 4 out of 7 P / Cs&lt;br /&gt;
were operable.) were operable.)&lt;br /&gt;
&lt;Preparation for accepting power supply vehicles by station personnel&gt; &lt;Preparation For accepting power supply vehicles by station personnel&gt;&lt;br /&gt;
・ The site engines decided to connect power supply vehicles to the primary side of a ? The site engines decided to connect power supply vehicles to the primary side of a&lt;br /&gt;
power transformer (6.9kV/480V) in a P/C at Unit 2 to have 480 V to use SLC pumps. power transformer (6.9kV/480V) in a P / C at Unit 2 to have 480 V to use SLC pumps.&lt;br /&gt;
・ Considering distance to the P/C of Unit 2 and workability for laying cables, the ? Considering distance to the P / C of Unit 2 and workability for laying cables, the&lt;br /&gt;
power supply vehicle was set at the side of the turbine building and cable was power supply vehicle was set at the side of the turbine building and cable was&lt;br /&gt;
laid from the equipment hatch of the turbine building to the P/C in the north laid from the equipment hatch of the turbine building to the P / C in the north&lt;br /&gt;
side of the first floor of the building. The distance was about 200 m. side of the first floor of the building. The distance was about 200 m.&lt;br /&gt;
・ The cable laid in the building was carried in by a 4-ton unic truck. This cable was ? The cable laid in the building was carried in by a 4-ton unic truck. This cable was&lt;br /&gt;
stored by an on-site contractor for outage works. stored by an on-site contractor for outage works.&lt;br /&gt;
＜ Arrival of Power Supply Vehicles ＞ &lt;Arrival of Power Supply Vehicles&gt;&lt;br /&gt;
・ Power supply vehicles of Tohoku EPC and TEPCO arrived at the site during midnight ? Power supply vehicles of Tohoku EPC and TEPCO arrived at the site during midnight&lt;br /&gt;
of March 11 and early morning of March 12. of March 11 and early morning of March 12.&lt;br /&gt;
・ In cable connection, TEPCO&#39;s power supply vehicles were given priority. ? In cable connection, TEPCO&#39;s power supply vehicles were given priority.&lt;br /&gt;
＜ Cable Laying and Connection ＞ &lt;Cable Laying and Connection&gt;&lt;br /&gt;
・ Cable in the building was more than 10 cm ? Cable in the building was more than 10 cm&lt;br /&gt;
diameter, about 200m long and weigh more than diameter, about 200m long and weigh more than&lt;br /&gt;
1 ton. Usually, laying this kind of cable takes 1 ton. Usually, laying this kind of cable takes&lt;br /&gt;
considerable days using machine but 40 TEPCO considerable days using machine but 40 TEPCO&lt;br /&gt;
personnel laid the cable in 4, 5 hours by hand . personnel laid the cable in 4, 5 hours by hand.&lt;br /&gt;
Sagging of Road Sagging of Road&lt;br /&gt;
Page 5 Page 5&lt;br /&gt;
・ It was very difficult to work steadily because of extremely bad working condition ? It was very difficult to work steadily because of extremely bad working condition&lt;br /&gt;
such as dark place, water puddle by the tsunami, debris and lost manhole lids. such as dark place, water puddle by the tsunami, debris and lost manhole lids.&lt;br /&gt;
It was necessary and quite a challenge to look for cable penetration in the dark and It was necessary and quite a challenge to look for cable penetration in the dark and&lt;br /&gt;
make cable route by destroying doors. Also, cable work was suspended by make cable route by destroying doors. Also, cable work was suspended by&lt;br /&gt;
evacuation with continued Tsunami Alarm and many aftershocks. evacuation with continued Tsunami Alarm and many aftershocks.&lt;br /&gt;
・ Cable terminal connection to P/C was completed only a few engineers, usually this ? Cable terminal connection to P / C was completed only a few engineers, usually this&lt;br /&gt;
takes several hours. takes several hours.&lt;br /&gt;
・ Though it was necessary to maintain communication between the field and the site ? Though it was necessary to maintain communication between the field and the site&lt;br /&gt;
emergency response headquarters, the communication was almost lost in the site emergency response headquarters, the communication was almost lost in the site&lt;br /&gt;
and had to walk to locations where communication was possible , very time and had to walk to locations where communication was possible, very time&lt;br /&gt;
consuming for the emergency situation. consuming for the emergency situation.&lt;br /&gt;
・ At 15:30, cable connection between the primary side of the P/C at Unit 2 and ? At 15:30, cable connection between the primary side of the P / C at Unit 2 and&lt;br /&gt;
the high voltage power supply vehicle was completed . Power was supplied just the high voltage power supply vehicle was completed. Power was supplied just&lt;br /&gt;
short of the SLC pump. However, at 15:36, Unit 1 exploded and debris by the short of the SLC pump. However, at 15:36, Unit 1 exploded and debris by the&lt;br /&gt;
explosion hit and damaged the cable, then the high voltage power supply explosion hit and damaged the cable, then the high voltage power supply&lt;br /&gt;
vehicle automatically stopped. Field work was suspended and everyone vehicle automatically stopped. Field work was suspended and everyone&lt;br /&gt;
evacuated to Anti-Seismic Building (TSC Building). evacuated to Anti-Seismic Building (TSC Building).&lt;br /&gt;
【 Confirmation of Water Injection to RPV 】 - Confirmation of Water Injection to RPV]&lt;br /&gt;
&lt;Unit1, Confirmation of IC status, Operation&gt; &lt;Unit1, Confirmation of IC status, Operation&gt;&lt;br /&gt;
・ In MCR, operators found indication light of MO-3A and MO-2A after temporary ? In MCR, operators found indication light of MO-3A and MO-2A after temporary&lt;br /&gt;
restoration of DC power. The indicators showed the valves were closed. Then an restoration of DC power. The indicators showed the valves were closed. Then an&lt;br /&gt;
operator opened the valves at 18:18 and confirmed the light indicated the valve operator opened the valves at 18:18 and confirmed the light indicated the valve&lt;br /&gt;
status from close to open. Also steam generation was confirmed after the valve status from close to open. Also steam generation was confirmed after the valve&lt;br /&gt;
operation. operation.&lt;br /&gt;
・ At 18:25, the operator closed the return line isolation valve (MO-3A). At 21:30, the ? At 18:25, the operator closed the return line isolation valve (MO-3A). At 21:30, the&lt;br /&gt;
operator opened the MO-3A and confirmed that steam was generated. operator opened the MO-3A and confirmed that steam was generated.&lt;br /&gt;
&lt;Unit 2, Confirmation of RCIC status, Operation&gt; &lt;Unit 2, Confirmation of RCIC status, Operation&gt;&lt;br /&gt;
・ In the early morning of March 12, an operator confirmed ? In the early morning of March 12, an operator confirmed&lt;br /&gt;
operating status at the field(RCIC Room). Equipped with Self operating status at the field (RCIC Room). Equipped with Self&lt;br /&gt;
air set, flashlight and high boot. It took about an hour to go air set, flashlight and high boot. It took about an hour to go&lt;br /&gt;
to and back from the RCIC room. Usually this takes only 10 to and back from the RCIC room. Usually this takes only 10&lt;br /&gt;
minutes but at that time, there were still concerns of minutes but at that time, there were still concerns of&lt;br /&gt;
aftershocks and tsunami and putting on/off the self air set aftershocks and tsunami and putting on / off the self air set&lt;br /&gt;
took extra time. took extra time.&lt;br /&gt;
・ In RCIC room, there was a water puddle and it&#39;s depth was ? In RCIC room, there was a water puddle and it&#39;s depth was&lt;br /&gt;
Self Air Set Self Air Set&lt;br /&gt;
Page 6 Page 6&lt;br /&gt;
about the height of the boots. Faint metallic sound was heard but the operator was about the height of the boots. Faint metallic sound was heard but the operator was&lt;br /&gt;
not able to check the rotating part. He returned to the MCR but was not able to not able to check the rotating part. He returned to the MCR but was not able to&lt;br /&gt;
determine whether RCIC was operating or not. Since PHS was not functioning, he determine whether RCIC was operating or not. Since PHS was not functioning, he&lt;br /&gt;
reported the situation after getting back to the MCR reported the situation after getting back to the MCR&lt;br /&gt;
・ Then at 2:00, the operator went there again. Water puddle increased and the ? Then at 2:00, the operator went there again. Water puddle increased and the&lt;br /&gt;
operating status of RCIC was not able to see in the RCIC room. The operator operating status of RCIC was not able to see in the RCIC room. The operator&lt;br /&gt;
determined RCIC was in operation by checking reactor pressure and RCIC determined RCIC was in operation by checking reactor pressure and RCIC&lt;br /&gt;
discharge pressure at the instrument rack of RCIC and RCIC discharge pressure discharge pressure at the instrument rack of RCIC and RCIC discharge pressure&lt;br /&gt;
was high. After he reported this after returning to the MCR then reported to the site was high. After he reported this after returning to the MCR then reported to the site&lt;br /&gt;
emergency response headquarters at 2:55. emergency response headquarters at 2:55.&lt;br /&gt;
Page 7 Page 7&lt;br /&gt;
Time line sequence of major events following earthquake to May 12 Time line sequence of major events following earthquake to May 12&lt;br /&gt;
th th&lt;br /&gt;
(Sat) for (Sat) for&lt;br /&gt;
Unit 1 at Fukushima Daiichi Nuclear Power Station Unit 1 at Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
This report is based on various information as well as testimonies received from This report is based on various information as well as testimonies received from&lt;br /&gt;
relevant people up to this point in time. Further announcements may be released upon relevant people up to this point in time. Further announcements may be released upon&lt;br /&gt;
the discovery of new information identified during the investigation. the discovery of new information identified during the investigation.&lt;br /&gt;
March 11 March 11&lt;br /&gt;
th th&lt;br /&gt;
, 2011 2011&lt;br /&gt;
2:46 pm The reactor was scrammed automatically after the Tohoku Chihou 2:46 pm The reactor was scrammed automatically after the Tohoku Chihou&lt;br /&gt;
Taiheiyou Oki Earthquake occurred. The third state of emergency was Taiheiyou Oki Earthquake occurred. The third state of emergency was&lt;br /&gt;
announced. announced.&lt;br /&gt;
2:47 pm The main turbine was suspended automatically. Diesel generator for emergency 2:47 pm The main turbine was suspended automatically. Diesel generator for emergency&lt;br /&gt;
started automatically. started automatically.&lt;br /&gt;
2:52 pm The isolation condenser (hereafter referred as “IC”) started automatically. 2:52 pm The isolation condenser (hereafter referred as &quot;IC&quot;) started automatically.&lt;br /&gt;
3:02 pm Subcritical state of reactor was confirmed. 3:02 pm Subcritical state of reactor was confirmed.&lt;br /&gt;
Approx. 3:03 pm IC was suspended manually to control the reactor pressure. The control Approx. 3:03 pm IC was suspended manually to control the reactor pressure. The control&lt;br /&gt;
of the reactor pressure by IC was started. of the reactor pressure by IC was started.&lt;br /&gt;
3:06 pm Headquarter for major disaster countermeasures was established in the head 3:06 pm Headquarter for major disaster countermeasures was established in the head&lt;br /&gt;
office to grasp situations of damages and to restore the outage due to the office to grasp situations of damages and to restore the outage due to the&lt;br /&gt;
earthquake. earthquake.&lt;br /&gt;
3:27 pm The first tsunami hit the Muclear Power Station. 3:27 pm The first tsunami hit the Muclear Power Station.&lt;br /&gt;
3:35 pm The second tsunami hit the Muclear Power Station. 3:35 pm The second tsunami hit the Muclear Power Station.&lt;br /&gt;
3:37 pm All the alternating-current sources were stopped. 3:37 pm All the alternating-current sources were stopped.&lt;br /&gt;
3:42 pm It was decided that a specific incident stipulated in Article 10, Clause 1 of 3:42 pm It was decided that a specific incident stipulated in Article 10, Clause 1 of&lt;br /&gt;
the Act on Special Measures Concerning Nuclear Emergency Preparedness the Act on Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
has occurred, and relevant governments were notified of the incident. has occurred, and relevant governments were notified of the incident.&lt;br /&gt;
3:42 pm 3:42 pm&lt;br /&gt;
The first Level Emergency” was declared, and Emergency Response The first Level Emergency &quot;was declared, and Emergency Response&lt;br /&gt;
Headquarter was established (as Joint Headquarter with Headquarter for major Headquarter was established (as Joint Headquarter with Headquarter for major&lt;br /&gt;
disaster countermeasures mentioned above). disaster countermeasures mentioned above).&lt;br /&gt;
4:36 pm It was decided that a specific incident (impossibility of water injection by 4:36 pm It was decided that a specific incident (impossibility of water injection by&lt;br /&gt;
Emergency Core Cooling System) stipulated in article 15, clause 1 of Act on Emergency Core Cooling System) stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness has occurred, Special Measures Concerning Nuclear Emergency Preparedness has occurred,&lt;br /&gt;
because the reactor water level and the status of water injection was not because the reactor water level and the status of water injection was not&lt;br /&gt;
confirmed. The relevant governments were notified of the incident at 16:45. confirmed. The relevant governments were notified of the incident at 16:45.&lt;br /&gt;
4:36 pm “The second Level Emergency” was declared. 4:36 pm &quot;The second Level Emergency&quot; was declared.&lt;br /&gt;
4:45 pm It was decided to cancel a specific incident (impossibility of water injection by 4:45 pm It was decided to cancel a specific incident (impossibility of water injection by&lt;br /&gt;
Page 8 Page 8&lt;br /&gt;
Emergency Core Cooling System) stipulated in article 15, clause 1 of Act on Special Emergency Core Cooling System) stipulated in article 15, clause 1 of Act on Special&lt;br /&gt;
Measures Concerning Nuclear Emergency Preparedness, because the reactor Measures Concerning Nuclear Emergency Preparedness, because the reactor&lt;br /&gt;
water level was confirmed. The relevant governments were notified of the water level was confirmed. The relevant governments were notified of the&lt;br /&gt;
cancellation at 16:55. cancellation at 16:55.&lt;br /&gt;
5:07 pm It was decided that a specific incident (impossibility of water injection by 5:07 pm It was decided that a specific incident (impossibility of water injection by&lt;br /&gt;
Emergency Core Cooling System) stipulated in article 15, clause 1 of Act on Special Emergency Core Cooling System) stipulated in article 15, clause 1 of Act on Special&lt;br /&gt;
Measures Concerning Nuclear Emergency Preparedness has occurred, because Measures Concerning Nuclear Emergency Preparedness has occurred, because&lt;br /&gt;
the reactor water level was not confirmed again. The relevant governments were the reactor water level was not confirmed again. The relevant governments were&lt;br /&gt;
notified of the cancellation at 17:12. notified of the cancellation at 17:12.&lt;br /&gt;
5:12 pm General Manager of Power station directed to start consideration of 5:12 pm General Manager of Power station directed to start consideration of&lt;br /&gt;
measure to injecting water to Reactor using the Fire Protection System which measure to injecting water to Reactor using the Fire Protection System which&lt;br /&gt;
is installed as a measure for accident management and fire fighter. is installed as a measure for accident management and fire fighter.&lt;br /&gt;
5:30 pm Diesel-powered fire pump activated. (idle activity) 5:30 pm Diesel-powered fire pump activated. (Idle activity)&lt;br /&gt;
6:18 pm Operated to open IC return line of isolation valve (MO-3A) and IC steam line of 6:18 pm Operated to open IC return line of isolation valve (MO-3A) and IC steam line of&lt;br /&gt;
isolation valve (MO-2A). Confirmed steam rising out. isolation valve (MO-2A). Confirmed steam rising out.&lt;br /&gt;
6:25 pm Operated to close IC return line of isolation valve (MO-3A) 6:25 pm Operated to close IC return line of isolation valve (MO-3A)&lt;br /&gt;
8:49 pm Temporary lighting was turned on in the main control room. 8:49 pm Temporary lighting was turned on in the main control room.&lt;br /&gt;
8:50 pm Government of Fukushima prefecture ordered to evacuate for the residents within 8:50 pm Government of Fukushima prefecture ordered to evacuate for the residents within&lt;br /&gt;
2km radius from Fukushima Daiichi Nuclear Power Station. 2km radius from Fukushima Daiichi Nuclear Power Station.&lt;br /&gt;
9:19 pm Water level in the reactor found out. Top of active fuel (hereinafter “TAF”) +200mm 9:19 pm Water level in the reactor found out. Top of active fuel (hereinafter &quot;TAF&quot;) +200 mm&lt;br /&gt;
9:23 pm The Prime Minister ordered the residents to evacuate within 3km radius from 9:23 pm The Prime Minister ordered the residents to evacuate within 3km radius from&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station, and ordered the residents to stay Fukushima Daiichi Nuclear Power Station, and ordered the residents to stay&lt;br /&gt;
indoors within 3km to 10 km radius. indoors within 3km to 10 km radius.&lt;br /&gt;
9:30 pm Operated to open IC return line of isolation valve (MO-3A). Confirmed steam 9:30 pm Operated to open IC return line of isolation valve (MO-3A). Confirmed steam&lt;br /&gt;
rising out. rising out.&lt;br /&gt;
9:51 pm Prohibited entry into the reactor building as the radioactive dose increased. 9:51 pm Prohibited entry into the reactor building as the radioactive dose increased.&lt;br /&gt;
10:00 pm Confirmed water level in the reactor was TAF+550 mm. Reported it to the 10:00 pm Confirmed water level in the reactor was TAF +550 mm. Reported it to the&lt;br /&gt;
authorities at 10:20 pm. authorities at 10:20 pm.&lt;br /&gt;
11:00 pm Reported to the authorities as a result of survey at 11:40 pm, an increase of 11:00 pm Reported to the authorities as a result of survey at 11:40 pm, an increase of&lt;br /&gt;
radioactive dose in the turbine building (1.2mSv/h in front of the double doors in radioactive dose in the turbine building (1.2mSv / h in front of the double doors in&lt;br /&gt;
the North on the first floor of the turbine building, 0.5mSv/h in front of the double the North on the first floor of the turbine building, 0.5mSv / h in front of the double&lt;br /&gt;
doors in the South on the first floor of the turbine building) doors in the South on the first floor of the turbine building)&lt;br /&gt;
March 12 March 12&lt;br /&gt;
th th&lt;br /&gt;
, 2011 2011&lt;br /&gt;
0:06 am The General Manager of power station instructed to prepare to vent the Primary 0:06 am The General Manager of power station instructed to prepare to vent the Primary&lt;br /&gt;
Containment Vessel (hereinafter “the Vent”) as the drywell (hereinafter “D/W”) Containment Vessel (hereinafter &quot;the Vent&quot;) as the drywell (hereinafter &quot;D / W&quot;)&lt;br /&gt;
pressure was likely to exceed 600kPa abs and there was a possibility to pressure was likely to exceed 600kPa abs and there was a possibility to&lt;br /&gt;
Page 9 Page 9&lt;br /&gt;
implement the Vent. implement the Vent.&lt;br /&gt;
0:30 am Government confirmed the completion of evacuation of the residents (3km radius 0:30 am Government confirmed the completion of evacuation of the residents (3km radius&lt;br /&gt;
of the periphery of Fukushima Daiichi Nuclear Power Station in Futaba Town and of the periphery of Fukushima Daiichi Nuclear Power Station in Futaba Town and&lt;br /&gt;
Okuma Town, reconfirmed at 1:45 am) Okuma Town, reconfirmed at 1:45 am)&lt;br /&gt;
0:49 am As D/W pressure was likely to exceed 600kPa abs, it was judged to a specific 0:49 am As D / W pressure was likely to exceed 600kPa abs, it was judged to a specific&lt;br /&gt;
incident (extraordinary increase of pressure in the Primary Containment Vessel) incident (extraordinary increase of pressure in the Primary Containment Vessel)&lt;br /&gt;
occurred, based on Article 15, clause 1 of Act on Special Measures Concerning occurred, based on Article 15, clause 1 of Act on Special Measures Concerning&lt;br /&gt;
Nuclear Emergency Preparedness. Reported it to the authorities at 0:55 am Nuclear Emergency Preparedness. Reported it to the authorities at 0:55 am&lt;br /&gt;
1:30 am Proposed and obtained agreement to implement the Vent at Unit1 and Unit2 to 1:30 am Proposed and obtained agreement to implement the Vent at Unit1 and Unit2 to&lt;br /&gt;
prime minister, minister of economy, trade and industry and Nuclear and prime minister, minister of economy, trade and industry and Nuclear and&lt;br /&gt;
Industrial Safety Agency. Industrial Safety Agency.&lt;br /&gt;
1:48 am Confirmed that diesel-powered fire pump stopped because of defects. Started to 1:48 am Confirmed that diesel-powered fire pump stopped because of defects. Started to&lt;br /&gt;
consider connecting the water inlet of the Fire Protection Line with a fire engine. consider connecting the water inlet of the Fire Protection Line with a fire engine.&lt;br /&gt;
2:47 am Reported to the authorities, D/W pressure reached 840 kPa abs at 2:30 am 2:47 am Reported to the authorities, D / W pressure reached 840 kPa abs at 2:30 am&lt;br /&gt;
3:06 am Press conference about the Vent implementation was held. 3:06 am Press conference about the Vent implementation was held.&lt;br /&gt;
3:33 am Reported to the authorities, the result of evaluation of radioactive exposure in 3:33 am Reported to the authorities, the result of evaluation of radioactive exposure in&lt;br /&gt;
the case that the Vent was implemented. the case that the Vent was implemented.&lt;br /&gt;
4:55 am Confirmed the radioactive dose in the power station rised (0.069μSv /h 4:55 am Confirmed the radioactive dose in the power station rised (0.069μSv / h&lt;br /&gt;
(4:00) =&gt; 0.59μSv /h(4:23) around main gate) and reported it to the authorities. (4:00) =&gt; 0.59μSv / h (4:23) around main gate) and reported it to the authorities.&lt;br /&gt;
5:14 am As the radioactive dose increased in the premise of the power plant and the D/W 5:14 am As the radioactive dose increased in the premise of the power plant and the D / W&lt;br /&gt;
pressure tended to decrease, it was judged that “radioactive material leakage to pressure tended to decrease, it was judged that &quot;radioactive material leakage to&lt;br /&gt;
the exterior” occurred. Reported it to the authorities. the exterior &quot;occurred. Reported it to the authorities.&lt;br /&gt;
5:44 am The Prime Minister ordered the residents within 10km radius of Fukushima 5:44 am The Prime Minister ordered the residents within 10km radius of Fukushima&lt;br /&gt;
Daiichi Nuclear Power Station to evacuate. Daiichi Nuclear Power Station to evacuate.&lt;br /&gt;
5:46 am The fire engine started plain water injection into the reactor through the Fire 5:46 am The fire engine started plain water injection into the reactor through the Fire&lt;br /&gt;
Protection Line. Protection Line.&lt;br /&gt;
6:33 am Confirmed that consideration was being given to the evacuation from Okuma 6:33 am Confirmed that consideration was being given to the evacuation from Okuma&lt;br /&gt;
Town to an area located in Miyakoji. Town to an area located in Miyakoji.&lt;br /&gt;
6:50 am There was an order of The Minister of Economy, Trade and Industry to implement 6:50 am There was an order of The Minister of Economy, Trade and Industry to implement&lt;br /&gt;
the Vent based on the laws and ordinances (manual Vent). the Vent based on the laws and ordinances (manual Vent).&lt;br /&gt;
7:11 am The Prime Minister arrived at Fukushima Daiichi Nuclear Power Station. 7:11 am The Prime Minister arrived at Fukushima Daiichi Nuclear Power Station.&lt;br /&gt;
8:03 am The General Manager of the power station instructed to aim to implement the 8:03 am The General Manager of the power station instructed to aim to implement the&lt;br /&gt;
Vent at 9 am. Vent at 9 am.&lt;br /&gt;
8:04 am The Prime Minister left Fukushima Daiichi Nuclear Power Station. 8:04 am The Prime Minister left Fukushima Daiichi Nuclear Power Station.&lt;br /&gt;
8:27 am Confirmed the information that part of the residents in Okuma Town have not 8:27 am Confirmed the information that part of the residents in Okuma Town have not&lt;br /&gt;
been able to evacuate yet. been able to evacuate yet.&lt;br /&gt;
Page 10 Page 10&lt;br /&gt;
8:37 am Reported to the Fukushima Prefectural Government that we were preparing for 8:37 am Reported to the Fukushima Prefectural Government that we were preparing for&lt;br /&gt;
the start of the Vent around 9 am. Coordination was done with Fukushima the start of the Vent around 9 am. Coordination was done with Fukushima&lt;br /&gt;
Prefectural government to implement vent operations subsequent to the Prefectural government to implement vent operations subsequent to the&lt;br /&gt;
evacuation. evacuation.&lt;br /&gt;
9:03 am Confirmed that the evacuation of Okuma Town (Kuma area) residents had been 9:03 am Confirmed that the evacuation of Okuma Town (Kuma area) residents had been&lt;br /&gt;
completed. completed.&lt;br /&gt;
9:04 am Person on duty left for the scene in order to implement the Vent. 9:04 am Person on duty left for the scene in order to implement the Vent.&lt;br /&gt;
9:05 am Announcement of implementation of the Vent. 9:05 am Announcement of implementation of the Vent.&lt;br /&gt;
Approx. 9:15 am Manually opened the vent valve (MO valve) of Primary Containment Approx. 9:15 am Manually opened the vent valve (MO valve) of Primary Containment&lt;br /&gt;
Vessel (hereinafter ”PCV”) Vessel (hereinafter &quot;PCV&quot;)&lt;br /&gt;
9:30 am An operation of the vent valve (A/O valve) of the suppression chamber 9:30 am An operation of the vent valve (A / O valve) of the suppression chamber&lt;br /&gt;
(hereinafter “S/C”) was tried but given up due to high radioactive dose. (Hereinafter &quot;S / C&quot;) was tried but given up due to high radioactive dose.&lt;br /&gt;
9:53 am Reported to the authorities, an evaluation result of exposure in the case that the 9:53 am Reported to the authorities, an evaluation result of exposure in the case that the&lt;br /&gt;
Vent was implemented. Vent was implemented.&lt;br /&gt;
10:17 am S/C vent valve (AO valve) was opened in the central control room (with 10:17 am S / C vent valve (AO valve) was opened in the central control room (with&lt;br /&gt;
expectation of residual pressure of instrumentation air system). expectation of residual pressure of instrumentation air system).&lt;br /&gt;
10:40 am As the radioactive dose increased at the main gate and the monitoring post, it 10:40 am As the radioactive dose increased at the main gate and the monitoring post, it&lt;br /&gt;
was judged that there was a high possibility that radioactive materials were was judged that there was a high possibility that radioactive materials were&lt;br /&gt;
released because of the Vent. released because of the Vent.&lt;br /&gt;
11:15 am Confirmed that there was a possibility that the Vent was not fully effective as the 11:15 am Confirmed that there was a possibility that the Vent was not fully effective as the&lt;br /&gt;
radioactive dose decreased. radioactive dose decreased.&lt;br /&gt;
11:39 am Reported to the authorities, that radioactive exposure of an employee of Tepco 11:39 am Reported to the authorities, that radioactive exposure of an employee of Tepco&lt;br /&gt;
exceeded 100 mSv (106.30 mSv), who had entered into the reactor building for exceeded 100 mSv (106.30 mSv), who had entered into the reactor building for&lt;br /&gt;
the Vent operation. the Vent operation.&lt;br /&gt;
2:30 pm When setting up a makeshift air compressor around 2 pm in order to operate the 2:30 pm When setting up a makeshift air compressor around 2 pm in order to operate the&lt;br /&gt;
S/C vent valve (AO valve), we confirmed that the D/W pressure decreased and S / C vent valve (AO valve), we confirmed that the D / W pressure decreased and&lt;br /&gt;
judged that the “release of radioactive materials” occurred by the Vent. We judged that the &quot;release of radioactive materials&quot; occurred by the Vent. We&lt;br /&gt;
reported this information to the authorities at 3:18 pm. reported this information to the authorities at 3:18 pm.&lt;br /&gt;
2:53 pm 80 tons (accumulated total) plain water had just been poured into the reactor by 2:53 pm 80 tons (accumulated total) plain water had just been poured into the reactor by&lt;br /&gt;
the fire engines. the fire engines.&lt;br /&gt;
2:54 pm The General Manager of the power plant instructed to implement an injection of 2:54 pm The General Manager of the power plant instructed to implement an injection of&lt;br /&gt;
seawater into the reactor. seawater into the reactor.&lt;br /&gt;
3:18 pm Reported the following items to the authorities: recovery work of standby liquid 3:18 pm Reported the following items to the authorities: recovery work of standby liquid&lt;br /&gt;
control system was in progress, the standby liquid control pump was scheduled to control system was in progress, the standby liquid control pump was scheduled to&lt;br /&gt;
be activated and boric-acid solution was scheduled to be injected into the reactor be activated and boric-acid solution was scheduled to be injected into the reactor&lt;br /&gt;
as soon as those were ready, furthermore, seawater was hereafter scheduled to as soon as those were ready, furthermore, seawater was hereafter scheduled to&lt;br /&gt;
Page 11 Page 11&lt;br /&gt;
be injected into the reactor through the Fire Protection Line as soon as that was be injected into the reactor through the Fire Protection Line as soon as that was&lt;br /&gt;
ready. ready.&lt;br /&gt;
3:36 pm All the preparations were complete for the injection of boric-acid solution through 3:36 pm All the preparations were complete for the injection of boric-acid solution through&lt;br /&gt;
the standby liquid control system, upon power restoration by use of a power the standby liquid control system, upon power restoration by use of a power&lt;br /&gt;
supply car. supply car.&lt;br /&gt;
3:36 pm An explosion occurred in the reactor building. Power- supply facility for the 3:36 pm An explosion occurred in the reactor building. Power-supply facility for the&lt;br /&gt;
standby liquid control system and pre-arranged hose for seawater injection were standby liquid control system and pre-arranged hose for seawater injection were&lt;br /&gt;
damaged and out of commission. damaged and out of commission.&lt;br /&gt;
4:27 pm Measuring the dose exceeding 500μSv /h at the monitoring post (1,015μSv /h), 4:27 pm Measuring the dose exceeding 500μSv / h at the monitoring post (1,015 μSv / h),&lt;br /&gt;
judged as a specific incident occurred based on article 15, clause 1 of Act on judged as a specific incident occurred based on article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (radiation dose Special Measures Concerning Nuclear Emergency Preparedness (radiation dose&lt;br /&gt;
increased abnormally at the boundary of the site). Reported this information to increased abnormally at the boundary of the site). Reported this information to&lt;br /&gt;
the authority. the authority.&lt;br /&gt;
6:05 pm The information was shared among the head office and the power station that 6:05 pm The information was shared among the head office and the power station that&lt;br /&gt;
there was an order of The Minister of Economy, Trade and Industry based on the there was an order of The Minister of Economy, Trade and Industry based on the&lt;br /&gt;
laws and ordinances. laws and ordinances.&lt;br /&gt;
6:25 pm The Prime Minister ordered the residents within 20km radius from Fukushima 6:25 pm The Prime Minister ordered the residents within 20km radius from Fukushima&lt;br /&gt;
Daiichi Nuclear Power Station to evacuate. Daiichi Nuclear Power Station to evacuate.&lt;br /&gt;
7:04 pm Seawater was started to be injected into the reactor by the fire engines through 7:04 pm Seawater was started to be injected into the reactor by the fire engines through&lt;br /&gt;
the Fire Protection Line. the Fire Protection Line.&lt;br /&gt;
8:45 pm Boric-acid solution was started to be mixed with seawater and injected into the 8:45 pm Boric-acid solution was started to be mixed with seawater and injected into the&lt;br /&gt;
reactor. reactor.&lt;br /&gt;
End End&lt;br /&gt;
Page 12 Page 12&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station Unit 1 Fukushima Daiichi Nuclear Power Station Unit 1&lt;br /&gt;
Alternative Water Injection Alternative Water Injection&lt;br /&gt;
This document is a summary of the latest information obtained through information and This document is a summary of the latest information obtained through information and&lt;br /&gt;
interviews with personnel concerned. We will continue investigation and announce when interviews with personnel concerned. We will continue investigation and announce when&lt;br /&gt;
new facts and findings are obtained. new facts and findings are obtained.&lt;br /&gt;
○Activities after Determination and Reporting of Loss of ECCS at 16:36 on ○ Activities after Determination and Reporting of Loss of ECCS at 16:36 on&lt;br /&gt;
March11. March11.&lt;br /&gt;
【 Planning for Alternative Injection 】 Planning for Alternative Injection]]&lt;br /&gt;
・ Frequent evacuation and suspension of field work due to continued ? Frequent evacuation and suspension of field work due to continued&lt;br /&gt;
tsunami alerts and aftershocks. Working without lighting and tsunami alerts and aftershocks. Working without lighting and&lt;br /&gt;
communication measures and significant amount of debris and soil by communication measures and significant amount of debris and soil by&lt;br /&gt;
the tsunami made the field operation very difficult . the tsunami made the field operation very difficult.&lt;br /&gt;
・ At 17:12, the site emergency response headquarters started to discuss ? At 17:12, the site emergency response headquarters started to discuss&lt;br /&gt;
using the alternative water injection which was put in place as an using the alternative water injection which was put in place as an&lt;br /&gt;
accident management measures (AM) and the fire protection tanks and accident management measures (AM) and the fire protection tanks and&lt;br /&gt;
fire engines deployed after Niigataken Chuetsuoki Earthquake . fire engines deployed after Niigataken Chuetsuoki Earthquake.&lt;br /&gt;
・ Meanwhile, operators checked measures for alternative water injection with ? Meanwhile, operators checked measures for alternative water injection with&lt;br /&gt;
AM procedure in the MCR and confirmed injection line to RPV then started AM procedure in the MCR and confirmed injection line to RPV then started&lt;br /&gt;
to use Diesel Driven Fire Pump (D/D FP). to use Diesel Driven Fire Pump (D / D FP).&lt;br /&gt;
・ Operators lined up alternative water injection with D/D FP and Fire ? Operators lined up alternative water injection with D / D FP and Fire&lt;br /&gt;
Protection line via Core Spray System , opening valves in the Core Spray Protection line via Core Spray System, opening valves in the Core Spray&lt;br /&gt;
lines by hand in the dark reactor building. After depressurize the RPV lines by hand in the dark reactor building. After depressurize the RPV&lt;br /&gt;
below 0.69 MPa, water injection through FP/CS became available. below 0.69 MPa, water injection through FP / CS became available.&lt;br /&gt;
・ At 17:30, D/D FP started up but in stand-by. ? At 17:30, D / D FP started up but in stand-by.&lt;br /&gt;
・ The restoration team of the site emergency response headquarters ? The restoration team of the site emergency response headquarters&lt;br /&gt;
conducted visual inspections for inundation status and damages on conducted visual inspections for inundation status and damages on&lt;br /&gt;
exterior and insulation resistance tests were conducted on the power exterior and insulation resistance tests were conducted on the power&lt;br /&gt;
panels (M/C and P/C) and found power supply equipment in Unit 1 was panels (M / C and P / C) and found power supply equipment in Unit 1 was&lt;br /&gt;
unable to use but one of P/Cs in Unit 2 was operable. The team made plans unable to use but one of P / Cs in Unit 2 was operable. The team made plans&lt;br /&gt;
to use SLC (Stand by Liquid Control) system to inject water in the RPV, since to use SLC (Stand by Liquid Control) system to inject water in the RPV, since&lt;br /&gt;
the SLC had high discharge pressure. Power supply for the SLC was the SLC had high discharge pressure. Power supply for the SLC was&lt;br /&gt;
planed to be restored by power supply vehicle via P/C in Unit 2 . planed to be restored by power supply vehicle via P / C in Unit 2.&lt;br /&gt;
・ Monitoring instruments in the MCR were unable to use because of ? Monitoring instruments in the MCR were unable to use because of&lt;br /&gt;
power outage . Then an operator entered in the dark reactor building and power outage. Then an operator entered in the dark reactor building and&lt;br /&gt;
Page 13 Page 13&lt;br /&gt;
confirmed the reactor pressure was 6.9 MPa as of 20:07. Later, water level confirmed the reactor pressure was 6.9 MPa as of 20:07. Later, water level&lt;br /&gt;
indicator returned its function and indicated the level was 200 mm above TAF indicator returned its function and indicated the level was 200 mm above TAF&lt;br /&gt;
(Top of Active Fuel) at 21:19. (Top of Active Fuel) at 21:19.&lt;br /&gt;
Page 14 Page 14&lt;br /&gt;
○Activities after Starting Consideration for Connecting Water Injection Line from ○ Activities after Starting Consideration for Connecting Water Injection Line from&lt;br /&gt;
Fire Engine to Fire Protection Line at 1:48 on March 12 Fire Engine to Fire Protection Line at 1:48 on March 12&lt;br /&gt;
【 Diesel Driven Fire Pump (D/D FP) 】 [Diesel Driven Fire Pump (D / D FP)]&lt;br /&gt;
・ At 1:48, an Operator found D/D FP was stopped which had been on stand by ? At 1:48, an Operator found D / D FP was stopped which had been on stand by&lt;br /&gt;
to inject water into the RPV. In order to start the D/D FP again, diesel fuel to inject water into the RPV. In order to start the D / D FP again, diesel fuel&lt;br /&gt;
was carried to the pump and fueled manually and batteries stored at an was carried to the pump and fueled manually and batteries stored at an&lt;br /&gt;
office of on-site contractor was carried and replaced but the pump did office of on-site contractor was carried and replaced but the pump did&lt;br /&gt;
not work. not work.&lt;br /&gt;
【 Preparation for Water Injection from Fire Engine 】 Preparation for Water Injection from Fire Engine []&lt;br /&gt;
・ It was impossible to use filtered water as water source for RPV because fire ? It was impossible to use filtered water as water source for RPV because fire&lt;br /&gt;
hydrant was damaged and water was spewed. To have sufficient hydrant was damaged and water was spewed. To have sufficient&lt;br /&gt;
amount of filtered water for the amount of filtered water for the&lt;br /&gt;
injection, valves were closed around injection, valves were closed around&lt;br /&gt;
the area . Also other water sources were the area. Also other water sources were&lt;br /&gt;
looked for and the fire protection tank looked for and the fire protection tank&lt;br /&gt;
was confirmed to be available. was confirmed to be available.&lt;br /&gt;
・ One fire engine was made ready for injection to ? One fire engine was made ready for injection to&lt;br /&gt;
the RPV. Other two fire engines were the RPV. Other two fire engines were&lt;br /&gt;
unavailable, for one was failed by the tsunami and the other was not able to unavailable, for one was failed by the tsunami and the other was not able to&lt;br /&gt;
move from the area near Unit 5/6. Damages on the road and debris by the move from the area near Unit 5 / 6. Damages on the road and debris by the&lt;br /&gt;
tsunami divided the access route between Units 1 -- 4 side and Units 5,6 tsunami divided the access route between Units 1 - 4 side and Units 5,6&lt;br /&gt;
side. side.&lt;br /&gt;
・ There were a lot of obstacles to deploy the ? There were a lot of obstacles to deploy the&lt;br /&gt;
available fire engine close to Unit 1. Tank available fire engine close to Unit 1. Tank&lt;br /&gt;
swept by the tsunami blocked a road in swept by the tsunami blocked a road in&lt;br /&gt;
front of the old-administration building and front of the old-administration building and&lt;br /&gt;
the road was impassable. The gate at the the road was impassable. The gate at the&lt;br /&gt;
physical protection headquarters lost physical protection headquarters lost&lt;br /&gt;
power and did not open. The restoration power and did not open. The restoration&lt;br /&gt;
team of the site emergency response headquarters looked for rout in team of the site emergency response headquarters looked for rout in&lt;br /&gt;
the site, then got access for the fire engine by breaking a lock at the the site, then got access for the fire engine by breaking a lock at the&lt;br /&gt;
gate between Units 2 and 3. gate between Units 2 and 3.&lt;br /&gt;
・ As for the fire engine, measures were studied to inject water via Fire ? As for the fire engine, measures were studied to inject water via Fire&lt;br /&gt;
Protection line. Also additional fire engines and water transportation by the Protection line. Also additional fire engines and water transportation by the&lt;br /&gt;
Tank moved by Tsunami Tank moved by Tsunami&lt;br /&gt;
Sagged Road in the Site Sagged Road in the Site&lt;br /&gt;
Page 15 Page 15&lt;br /&gt;
SDF were considered. SDF were considered.&lt;br /&gt;
・ Reactor pressure was 0.8 MPa at 2:4. ? Reactor pressure was 0.8 MPa at 2:4.&lt;br /&gt;
【 Restoration of SLC system 】 [Restoration of SLC system]&lt;br /&gt;
・ Power supply and pump in SLC system were not affected by the tsunami. ? Power supply and pump in SLC system were not affected by the tsunami.&lt;br /&gt;
Since the SLC has high-head pump, power supply was being restored by the Since the SLC has high-head pump, power supply was being restored by the&lt;br /&gt;
power supply vehicle. power supply vehicle.&lt;br /&gt;
○Activities after Starting Water Injection into the RPV at 5:46, on 3/12 ○ Activities after Starting Water Injection into the RPV at 5:46, on 3 / 12&lt;br /&gt;
【 Prepare/Continue Freshwater Injection 】 - Prepare / Continue Freshwater Injection]&lt;br /&gt;
・ A fire engine in the garage moved to Unit 1. At first, the fire engine pumped ? A fire engine in the garage moved to Unit 1. At first, the fire engine pumped&lt;br /&gt;
up water at the fire protection tank then drove close to the reactor up water at the fire protection tank then drove close to the reactor&lt;br /&gt;
building and injected water through FP line, this operation was building and injected water through FP line, this operation was&lt;br /&gt;
repeated because it was considered the elevation at the fire protection tank repeated because it was considered the elevation at the fire protection tank&lt;br /&gt;
was too low and the discharge pressure of the pump in the fire engine was was too low and the discharge pressure of the pump in the fire engine was&lt;br /&gt;
not enough. It took significant amount of time to drive the fire engine not enough. It took significant amount of time to drive the fire engine&lt;br /&gt;
carefully under the half-collapsed building . carefully under the half-collapsed building.&lt;br /&gt;
・ It took time to go back and forth the fire engine between the fire ? It took time to go back and forth the fire engine between the fire&lt;br /&gt;
protection tank and the reactor building , after some trial and error , protection tank and the reactor building, after some trial and error,&lt;br /&gt;
continuous water injection started by using a horse equipped on the fire continuous water injection started by using a horse equipped on the fire&lt;br /&gt;
engine to directly connect the fire protection tank and the fire protection line engine to directly connect the fire protection tank and the fire protection line&lt;br /&gt;
to the RPV. to the RPV.&lt;br /&gt;
・ Additional fire engine arrived to the site and this one was used to transport ? Additional fire engine arrived to the site and this one was used to transport&lt;br /&gt;
freshwater from the fire protection tank at Unit 3 to the fire protection tank at freshwater from the fire protection tank at Unit 3 to the fire protection tank at&lt;br /&gt;
Unit 1 repeatedly . The fire protection tank had room for only one horse, Unit 1 repeatedly. The fire protection tank had room for only one horse,&lt;br /&gt;
so water injection to the RPV had to be suspended when the second so water injection to the RPV had to be suspended when the second&lt;br /&gt;
fire engine came to replenish the water in the tank . fire engine came to replenish the water in the tank.&lt;br /&gt;
【 Preparation for Seawater Injection and SLC 】 Preparation for Seawater Injection and SLC []&lt;br /&gt;
・ Because of the limitation of the amount of freshwater in the fire protection ? Because of the limitation of the amount of freshwater in the fire protection&lt;br /&gt;
tanks, preparation for seawater injection was tanks, preparation for seawater injection was&lt;br /&gt;
initiated. initiated.&lt;br /&gt;
・ Instead of taking seawater directly from the ? Instead of taking seawater directly from the&lt;br /&gt;
sea, the backwash pit where seawater was sea, the backwash pit where seawater was&lt;br /&gt;
filled by the tsunami was selected as a supply filled by the tsunami was selected as a supply&lt;br /&gt;
souse taking the road conditions in the site souse taking the road conditions in the site&lt;br /&gt;
Injection by Fire Engine Injection by Fire Engine&lt;br /&gt;
Page 16 Page 16&lt;br /&gt;
and distance from Unit 1 into consideration. and distance from Unit 1 into consideration.&lt;br /&gt;
・ At 14:53, 80,000 Litter of fresh water had been injected to the RPV. ? At 14:53, 80,000 Litter of fresh water had been injected to the RPV.&lt;br /&gt;
・ At 14:54, Site Vice President directed to prepare for seawater injection to the ? At 14:54, Site Vice President directed to prepare for seawater injection to the&lt;br /&gt;
RPV. Since freshwater in the fire protection tank at Unit 1 was drying up, RPV. Since freshwater in the fire protection tank at Unit 1 was drying up,&lt;br /&gt;
freshwater was transported from other fire protection tanks in a quick pace freshwater was transported from other fire protection tanks in a quick pace&lt;br /&gt;
and preparation for seawater injection was moved ahead. and preparation for seawater injection was moved ahead.&lt;br /&gt;
・ Around 15:30, cable connection between the primary side of P/C at Unit ? Around 15:30, cable connection between the primary side of P / C at Unit&lt;br /&gt;
2 and high-voltage power supply vehicle was completed. Power was 2 and high-voltage power supply vehicle was completed. Power was&lt;br /&gt;
supplied just short of the SLC pump. supplied just short of the SLC pump.&lt;br /&gt;
・ Lining up of seawater injection was completed with three fire engines ? Lining up of seawater injection was completed with three fire engines&lt;br /&gt;
connected in series to have sufficient head. Seawater was taken from the connected in series to have sufficient head. Seawater was taken from the&lt;br /&gt;
backwash pit at Unit 3. backwash pit at Unit 3.&lt;br /&gt;
Page 17 Page 17&lt;br /&gt;
・ At 15:36, Unit 1 reactor building exploded. ? At 15:36, Unit 1 reactor building exploded.&lt;br /&gt;
? Workers at the field evacuated, rescued ? Workers at the field evacuated, rescued&lt;br /&gt;
and transported the injured. (TEPCO: 3, and transported the injured. (TEPCO: 3,&lt;br /&gt;
Contractor: 2) Contractor: 2)&lt;br /&gt;
? To verify safety and see effect of the ? To verify safety and see effect of the&lt;br /&gt;
explosion, field survey and walk down explosion, field survey and walk down&lt;br /&gt;
were conducted. (Status of fire engines, were conducted. (Status of fire engines,&lt;br /&gt;
damages to the buildings and smoking damages to the buildings and smoking&lt;br /&gt;
etc.) Fire engines maintained their etc.) Fire engines maintained their&lt;br /&gt;
function though windshield was broken. function though windshield was broken.&lt;br /&gt;
? As for the SLC pump, ballistic fragments by the explosion ? As for the SLC pump, ballistic fragments by the explosion&lt;br /&gt;
damaged cable damaged the cable and high-voltage power damaged cable damaged the cable and high-voltage power&lt;br /&gt;
supply vehicle stopped automatically. supply vehicle stopped automatically.&lt;br /&gt;
? The hoses prepared for seawater injection was also damaged. ? The hoses prepared for seawater injection was also damaged.&lt;br /&gt;
・ ?&lt;br /&gt;
It was impossible to resume restoration work until evacuation, It was impossible to resume restoration work until evacuation,&lt;br /&gt;
confirmation of the safety of workers and the field were completed. confirmation of the safety of workers and the field were completed.&lt;br /&gt;
・ Workers removed debris, collected hoses from outdoor fire hydrants ? Workers removed debris, collected hoses from outdoor fire hydrants&lt;br /&gt;
and laid hoses again to seawater injection. Because the debris near and laid hoses again to seawater injection. Because the debris near&lt;br /&gt;
Unit 1 had high radiation, all these activities were monitored by Unit 1 had high radiation, all these activities were monitored by&lt;br /&gt;
radioactive protection technicians. radioactive protection technicians.&lt;br /&gt;
・ At 19:04, seawater injection started using the fire protection line and fire ? At 19:04, seawater injection started using the fire protection line and fire&lt;br /&gt;
engines. engines.&lt;br /&gt;
Explosion of Unit 1 Reactor Building Explosion of Unit 1 Reactor Building&lt;br /&gt;
Page 18 Page 18&lt;br /&gt;
The status of administration main building The status of administration main building&lt;br /&gt;
Unit 1, Fukushima Daiichi Nuclear Power Station Unit 1, Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
The operation of the vent valve at the PCV The operation of the vent valve at the PCV&lt;br /&gt;
This summarizes the facts based on info and testimony available to date. We will This summarizes the facts based on info and testimony available to date. We will&lt;br /&gt;
continue the investigation. If new facts are confirmed at a later date, we will announce continue the investigation. If new facts are confirmed at a later date, we will announce&lt;br /&gt;
again. again.&lt;br /&gt;
? Activities after report “At 4:36 PM on March 11, Determination and Report of ? Activities after report &quot;At 4:36 PM on March 11, Determination and Report of&lt;br /&gt;
ECCS&#39;s inability to inject water” ECCS&#39;s inability to inject water &quot;&lt;br /&gt;
・ We were endeavoring to restore indicators in the Main Control Room. We did below ? We were endeavoring to restore indicators in the Main Control Room. We did below&lt;br /&gt;
works. works.&lt;br /&gt;
【 Preparation work for opening the vent valve 】&lt;br /&gt;
・ At the Main Control Room we submitted the accident management (“AM”) operation&lt;br /&gt;
procedure to the chief operator and confirmed the procedure. Also, we began&lt;br /&gt;
confirming the name and place of valves required for opening the vent valves&lt;br /&gt;
(“Vent”) using the checklist for valves.&lt;br /&gt;
・ Generation team of Power station emergency response headquarters (“PSER”)&lt;br /&gt;
began reviewing the AM operation procedure and checking the Vent procedures&lt;br /&gt;
without electricity.&lt;br /&gt;
・ Restoration team of PSER, during aftershocks,&lt;br /&gt;
went to the administration main building&lt;br /&gt;
(entrance prohibited) to get drawings in order&lt;br /&gt;
to check the model and structure of the S/C&lt;br /&gt;
vent valve (AO valve) required for Vent and&lt;br /&gt;
open manually . At the same time, we inquired&lt;br /&gt;
our subcontractors. From the drawings, we&lt;br /&gt;
confirmed that there is a handle on the small valve of S/C vent valve (AO valve) and&lt;br /&gt;
could be opened manually. We notified the Main Control Room accordingly.&lt;br /&gt;
【 The dose at the work place began to increase 】&lt;br /&gt;
・ 9:51 PM， The dose at the R/B began to increase . We prohibited entry to R/B.&lt;br /&gt;
・ 10:00 PM, PSER have been reported that the figures by APD went up to 0.8mSv&lt;br /&gt;
during a very short period of time at the R/B.&lt;br /&gt;
・ 11:00 PM，because of the influence of increase of dose at R/B, the radiation dose&lt;br /&gt;
in the T/B increased. (in front of the airlock, north side, 1FL, T/B: 1.2mSv/h，in&lt;br /&gt;
front of the airlock, south side, 1FL, T/B: 0.5mSv/h）。&lt;br /&gt;
【 D/W pressure began to increase 】&lt;br /&gt;
Page 19 Page 19&lt;br /&gt;
・ 11:50PM, at the Main Control Room, Restoration team of PSER connected the&lt;br /&gt;
battery for the reactor water level gauge to D/W pressure gauge to check the&lt;br /&gt;
pressure. The pressure indicated was 600kPa abs. Reported that to PSER.&lt;br /&gt;
? Activities after “At 12:06 AM on March 12, D ／ W pressure may exceed 600kPa&lt;br /&gt;
abs. Instruction from the Station Manager to proceed with the preparation”&lt;br /&gt;
【 began to confirm the actual Vent procedures 】&lt;br /&gt;
・ At the Main Control Room we put together the piping and instrumentation diagrams,&lt;br /&gt;
AM procedure manual, documents such as the drawings of valves and the&lt;br /&gt;
whiteboard. We began confirming the actual procedures such as how to operate the&lt;br /&gt;
valve and sequences.&lt;br /&gt;
・ At 1:30 AM, we asked for permission to do Vent to Prime Minister, Minister of METI&lt;br /&gt;
and NISA and got approval. From Headquarters Task Force (“HTF”), we received&lt;br /&gt;
instruction “We would like you to do Vent by whatever ways to operate the MO&lt;br /&gt;
valve and AO valve. At 3:00 AM, Minister of METI and we will announce doing&lt;br /&gt;
Vent. After the announcement, please do Vent.”&lt;br /&gt;
【 continue confirmation of Vent procedures 】&lt;br /&gt;
・ 2:24 AM， PSER received the evaluation result of work time at the field site to do&lt;br /&gt;
Vent. If the atmospheric radiation is 300mSv/h, we have 17 minutes of work&lt;br /&gt;
time under the radiation limit for emergency response (100mSv/h) (the air in&lt;br /&gt;
the self-contained breathing apparatus lasts 20 minutes. Need to take iodine&lt;br /&gt;
tablets.)&lt;br /&gt;
・ 2:30 AM，D/W pressure reached 840kPa abs（the maximum operation pressure =&lt;br /&gt;
427kPa gauge&lt;br /&gt;
※ ※&lt;br /&gt;
） )&lt;br /&gt;
※528.3kPa abs（＝427kPa gage＋101.3kPa）&lt;br /&gt;
・ 3:45AM， HTF made the evaluation on exposure dose at the surrounding areas at&lt;br /&gt;
the time of Vent and shared with the power station. At the power station, in order to&lt;br /&gt;
measure dose in the R/B, we opened the airlock. As we saw white gaseous&lt;br /&gt;
substance, we instantaneously closed the airlock. We couldn&#39;t conduct dose&lt;br /&gt;
measurement.&lt;br /&gt;
・ At the Main Control Room, in preparation for Vent, we repeatedly confirmed the&lt;br /&gt;
sequence of operation of valves, location of valves in Torus Room, height of&lt;br /&gt;
valves etc. We collected as many equipments as possible required for the work.&lt;br /&gt;
Those are fire fighting garments, self-contained breathing apparatus, APD, survey&lt;br /&gt;
meter and flashlights.&lt;br /&gt;
・ At 4:30 AM, because of the risk of tsunami by aftershocks, PSER instructed the&lt;br /&gt;
Page 20 Page 20&lt;br /&gt;
Main Control Room to prohibit operation at the field site.&lt;br /&gt;
・ At 4:45 AM, PSER delivered APDs (set at 100mSv) and full face masks to the Main&lt;br /&gt;
Control Room. At 4:50 AM, as the worker returned to the main anti-earthquake&lt;br /&gt;
building was contaminated, we decided to equip, from the entrance of the main&lt;br /&gt;
anti-earthquake building, “full face mask + charcoal filter + B garment, C&lt;br /&gt;
garment or coverall” when we go to the field site . After that, at 5:00 AM, Main&lt;br /&gt;
Control Room was instructed to equip similarly “full face mask + charcoal filter +&lt;br /&gt;
B garment.&lt;br /&gt;
・ At the Main Control Room as the dose increased, the Chief shift operator instructed&lt;br /&gt;
shift operators to move to Unit 2 side with relatively lower dose.&lt;br /&gt;
・ At 6:33 AM，as to the status of evacuation at surrounding areas, we confirmed that&lt;br /&gt;
residents are planning to move from Okuma town to Miyakoji.&lt;br /&gt;
・ 8:03 AM, Station Chief instructed to target 9 AM to do Vent for Unit 1.&lt;br /&gt;
・ At the Main Control Room, we formed three teams, two persons for each (Chief&lt;br /&gt;
shift operator and deputy chief shift operator) because of the following&lt;br /&gt;
reasons: (i) it is impossible to work by one person because of complete&lt;br /&gt;
darkness (ii) the high anticipated dose and (iii) may need to return because of&lt;br /&gt;
the aftershock.&lt;br /&gt;
・ We confirmed the status of evacuation by residents. At 8:27 AM, TEPCO employees&lt;br /&gt;
dispatched to Okuma town office reported to PSER that part of Okuma town&lt;br /&gt;
hadn&#39;t yet evacuated.&lt;br /&gt;
・ At 8:37 ， we notified Fukushima prefecture that we are preparing for the&lt;br /&gt;
commencement of Vent from 9:00 AM. We coordinated to Vent after evacuation&lt;br /&gt;
is over.&lt;br /&gt;
・ At 9:03 AM，we confirmed that Kuma area, Okuma town finished evacuation. We&lt;br /&gt;
notified Fukushima prefecture that we will make announcement to the media and do&lt;br /&gt;
Vent at 9:05 AM.&lt;br /&gt;
? Activities after “At 9:04 AM on March 12, shift operators departed to the field&lt;br /&gt;
site to do Vent”&lt;br /&gt;
【 Open PCV vent valve (MO valve) 】&lt;br /&gt;
・ At 9:04，in order to open PCV vent valve, two shift&lt;br /&gt;
operators went to the field site. They were equipped with&lt;br /&gt;
fire fighting garment, self-contained breathing&lt;br /&gt;
apparatus and APD. As the electricity was lost, the field&lt;br /&gt;
sites in R/B and T/B were in complete darkness. They&lt;br /&gt;
Page 21 Page 21&lt;br /&gt;
departed with flashlights. As there was no communication channel with the field&lt;br /&gt;
site, we decided to dispatch teams to the field site one by one. After one team&lt;br /&gt;
returned to the Main Control Room, the next team departed.&lt;br /&gt;
・ The first team departed the Main Control Room to the field site to open the PCV vent&lt;br /&gt;
valve (MO valve). At 9:15 AM, opened to 25% per the operation procedure and&lt;br /&gt;
returned to the Main Control Room. The exposure&lt;br /&gt;
dose was 25mSv.&lt;br /&gt;
【 open the S/C vent valve (AO valve) - small 】&lt;br /&gt;
・ At 9:24 AM, in order to open the S/C vent valve (AO&lt;br /&gt;
valve) -- small, team 2 departed the Main Control&lt;br /&gt;
Room to Torus Room. During the way, dose&lt;br /&gt;
increased and as there was a risk to exceed the&lt;br /&gt;
dose limit, 100mSv, at 9:30 AM, team returned to&lt;br /&gt;
the Main Control Room.&lt;br /&gt;
・ As the dose was high, we gave up the work by team 3. We reported to the PSER.&lt;br /&gt;
【 Considered measures to open S/C vent valve (AO valve ） -large 】&lt;br /&gt;
・ As we could not open the S/C vent valve (AO valve) -- small at the field site, the&lt;br /&gt;
PSER began considering the location to connect the temporary air compressor (to&lt;br /&gt;
11:00 AM). Also, PSER instructed the Main Control Room to open the S/C vent&lt;br /&gt;
valve (AO valve) -- small by remote operation hoping for the residual air pressure in&lt;br /&gt;
the I&amp;C compressed air line.&lt;br /&gt;
【 remote opening of the vent valve (AO valve) -- small (hoping for the residual air&lt;br /&gt;
pressure in the I&amp;C compressed air line) ， reading at monitoring posts (“MP”)&lt;br /&gt;
became higher 】&lt;br /&gt;
・ At 10:17 AM，did the first remote opening, uncertain whether the valve opened.&lt;br /&gt;
・ At 10:23 AM，did the second remote opening, uncertain whether the valve opened.&lt;br /&gt;
・ At 10:24 AM，did the third remote opening, uncertain whether the valve opened.&lt;br /&gt;
・ At 10:40 AM, as we confirmed that the dose at the main gate and MP became higher,&lt;br /&gt;
PSER determined that it was highly likely that radioactive substances were released&lt;br /&gt;
by Vent. At 11:15 AM, as the dose became lower, PSER suspected that the Vent&lt;br /&gt;
was insufficient.&lt;br /&gt;
【 Opening the S/C vent valve (AO valve ） -large 】&lt;br /&gt;
・ The restoration team of PSER looked for the temporary compressor, received info&lt;br /&gt;
that the there was one at the subcontractor&#39;s office and decided to go and search at&lt;br /&gt;
there. In order to connect the temporary compressor, we needed the adaptor. By&lt;br /&gt;
using the piping and instrumentation diagrams, we decided the place to connect. At&lt;br /&gt;
Page 22 Page 22&lt;br /&gt;
the field site, we took photos of that place and returned to PSER.&lt;br /&gt;
・ At 12:30 PM, we looked for the adaptor. We found the temporary compressor at our&lt;br /&gt;
subcontractor&#39;s office and transferred that by a crane truck. As the dose was high,&lt;br /&gt;
we located the compressor at the outside of large equipments carry-in opening. At&lt;br /&gt;
2:00 PM, we started the temporary compressor.&lt;br /&gt;
・ At 2:30 PM, we confirmed that D/W pressure went down and determined this&lt;br /&gt;
as “release of radioactive substances” by Vent.&lt;br /&gt;
D/W pressure 0.75MPa→0.58MPa(2:50 PM)&lt;br /&gt;
Page 23 Page 23&lt;br /&gt;
Time line sequence of major events following earthquake to May 15&lt;br /&gt;
th th&lt;br /&gt;
(Tue) for Unit 2 at Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
This report is based on various information as well as testimonies received from&lt;br /&gt;
relevant people up to this point in time. Further announcements may be released upon&lt;br /&gt;
the discovery of new information identified during the investigation.&lt;br /&gt;
Friday March 11, 2011&lt;br /&gt;
2:46 pm Touhoku-Pacific earthquake occurred. The 3rd emergency attitude was&lt;br /&gt;
automatically issued.&lt;br /&gt;
2:47 pm Automatic Reactor scram , Stopped automatically Main Turbine, Started&lt;br /&gt;
Emergency generator automatically.&lt;br /&gt;
2:50 pm Manually started up Reactor Core Isolation Cooling System (hereinafter&lt;br /&gt;
RCIC).&lt;br /&gt;
2:51 pm Shut down RCIC (High Reactor water level).&lt;br /&gt;
3:01 pm Confirmed uncritical on Reactor.&lt;br /&gt;
3:02 pm Manually started RCIC.&lt;br /&gt;
3:06 pm Set up an Emergency Center at headquarter.(To figure out the situation by&lt;br /&gt;
damage caused by earthquake, recovering from blackout etc)&lt;br /&gt;
3:27 pm 1&lt;br /&gt;
st st&lt;br /&gt;
wave of Tsunami arrived.&lt;br /&gt;
3:28 pm RCIC shut down (High Reactor water level).&lt;br /&gt;
3:35 pm 2&lt;br /&gt;
nd nd&lt;br /&gt;
wave of Tsunami arrived.&lt;br /&gt;
3:39 pm Manually started up RCIC.&lt;br /&gt;
3:41 pm Lost all AC power sources.&lt;br /&gt;
3:42 pm Judged that specific issue (lost all AC power sources) based on the&lt;br /&gt;
article 10, clause 1 of Act on Special Measures Concerning Nuclear&lt;br /&gt;
Emergency Preparedness occurred and reported to authority etc.&lt;br /&gt;
3:42 pm The 1&lt;br /&gt;
st st&lt;br /&gt;
emergency attitude was issued. Set headquarter for Emergency&lt;br /&gt;
Headquarters (Combined headquarter with headquarters for major disaster&lt;br /&gt;
countermeasures).&lt;br /&gt;
4:36 pm Judged that the specific issue (Enable to inject water by Emergency&lt;br /&gt;
Core Cooling System) based on the article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
occurred because of enable to confirm Reactor water level and&lt;br /&gt;
situation of injecting water. Reported it to authority etc. at 4:45 pm.&lt;br /&gt;
4:36 pm 2&lt;br /&gt;
nd nd&lt;br /&gt;
emergency attitude was issued.&lt;br /&gt;
Page 24 Page 24&lt;br /&gt;
5:12 pm General Manager of Power station directed to start consideration of&lt;br /&gt;
measure to injecting water to Reactor using the Fire Protection System&lt;br /&gt;
which is installed as a measure for accident management and fire&lt;br /&gt;
fighter.&lt;br /&gt;
8:49 pm Temporary lighting was turned on in the main control room.&lt;br /&gt;
8:50 pm Government of Fukushima prefecture ordered to evacuate for the residents&lt;br /&gt;
within 2km radius from Fukushima Daiichi Nuclear Power Station.&lt;br /&gt;
9:02 pm Reported the risk that the water level may reach to Top of Active fuel&lt;br /&gt;
(hereinafter TAF) because of uncertain Reactor water level and enable&lt;br /&gt;
to check the condition of injecting water by RCIC to the Reactor.&lt;br /&gt;
9:13 pm Estimated the TAF reaching time at 9:40 pm, report it to authority.&lt;br /&gt;
9:23 pm Prime minister ordered to evacuate for the residents in 3km radius from&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station, and to shelter indoors for the&lt;br /&gt;
residents in 3km to 10 km radius.&lt;br /&gt;
10:00 pm As Reactor water level was turned out to be at TAF+3400mm,&lt;br /&gt;
estimated to take more time to reach TAF and reported authority at&lt;br /&gt;
22:10 and 22:20.&lt;br /&gt;
Saturday, March 12, 2011&lt;br /&gt;
12:30 am Confirmed evacuating measure of residents by national government has&lt;br /&gt;
been completed (Confirmed the evacuation inside 3km radius in Futaba&lt;br /&gt;
town and Okuma town has been completed, reconfirmed at 1:45)&lt;br /&gt;
Approx. Approx.&lt;br /&gt;
1:30 am Proposed and obtained agreement to implement vent at Unit1 and Unit2 to&lt;br /&gt;
prime minister, minister of economy, trade and industry and Nuclear and&lt;br /&gt;
Industrial Safety Agency.&lt;br /&gt;
2:55 am Confirmed RCIC is under operation.&lt;br /&gt;
3:06 am Press conference about vent implementation was held.&lt;br /&gt;
3:33 am Reported the result of evaluation exposure dose in the case of vent was&lt;br /&gt;
implemented to authorities.&lt;br /&gt;
4:55 am Confirmed the radiation dose in the power station raised (0.069μSv /h&lt;br /&gt;
(4:00) =&gt; 0.59μSv /h(4:23) around main gate) and reported it to authority.&lt;br /&gt;
5:44 am Prime minister ordered to the residents in 10km radius from Fukushima&lt;br /&gt;
Daiichi Nuclear Power Station to evacuate.&lt;br /&gt;
6:50 am The order to implement vent based on the law by minister of economy, trade&lt;br /&gt;
and industry (manually vent).&lt;br /&gt;
Page 25 Page 25&lt;br /&gt;
7:11 am Prime minister arrived at Fukushima Daiichi Nuclear Power Station.&lt;br /&gt;
8:04 am Prime minister departed from Fukushima Daiichi Nuclear Power Station.&lt;br /&gt;
4:27 pm Measuring the dose exceeding 500μSv /h by monitoring post (1,015μSv /h),&lt;br /&gt;
judged as specific event based on article 15,clause 1 of Act on Special&lt;br /&gt;
Measures Concerning Nuclear Emergency Preparedness occurred&lt;br /&gt;
(Radiation dose raised abnormally at boundary of the site) and reported it to&lt;br /&gt;
the authority.&lt;br /&gt;
5:30 pm General Manager of the power station ordered to prepare the operation&lt;br /&gt;
of vent.&lt;br /&gt;
6:25 pm Prime minister ordered the residents in 20km radius from Fukushima Daiichi&lt;br /&gt;
Nuclear Power Station to evacuate.&lt;br /&gt;
Sunday, March 13, 2011/06/21&lt;br /&gt;
8:10 am Primary Containment Vessel (hereinafter PCV) Vent valve “OPEN”.&lt;br /&gt;
8:56 am As radioactive dose exceeding 500μSv /h(882μSv /h) was measured by&lt;br /&gt;
monitoring post, it was judged to specific issue based on Article15,&lt;br /&gt;
clause1 of Act on Special Measures Concerning Nuclear Emergency&lt;br /&gt;
Preparedness occurred, and reported to the authorities.&lt;br /&gt;
10:15 am General Manager of Power Station ordered to start Vent operation .&lt;br /&gt;
11:00 am Vent line composition was completed except for rupture disc.&lt;br /&gt;
11:00 am Prime minister ordered sheltering indoors to the residents in the area of&lt;br /&gt;
over 20km to 30km radius from Fukushima Daiichi Nuclear Power Station.&lt;br /&gt;
11:20 am Announcement of implementation of the Vent.&lt;br /&gt;
12:05 pm General Manager of Power Station ordered to prepare to use sea&lt;br /&gt;
water.&lt;br /&gt;
2:15 pm As radioactive dose exceeding 500μSv /h(905μSv /h) was measured by&lt;br /&gt;
monitoring post, it was judged to specific issue (radioactive dose at&lt;br /&gt;
boundary abnormally raise) based on Article15, clause1 of Act on Special&lt;br /&gt;
Measures Concerning Nuclear Emergency Preparedness occurred, and&lt;br /&gt;
reported to the authorities at 2:23.&lt;br /&gt;
3:18 pm Reported evaluation result of dose exposure in case of implementation of&lt;br /&gt;
Vent to authorities.&lt;br /&gt;
Monday, March 14, 2011&lt;br /&gt;
2:20 am As radioactive dose exceeding 500μSv /h(751μSv /h) was measured&lt;br /&gt;
around main gate, it was judged to specific issue(radioactive dose at&lt;br /&gt;
Page 26 Page 26&lt;br /&gt;
boundary abnormally raised) based on Article15, clause1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
occurred, and reported to the authorities at 4:24.&lt;br /&gt;
2:40 am As radioactive dose exceeding 500μSv /h(650μSv /h) was measured by&lt;br /&gt;
monitoring post, it was judged to specific issue(radioactive dose at&lt;br /&gt;
boundary abnormally raised) based on Article15, clause1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
occurred, and reported to the authorities at 5:37.&lt;br /&gt;
4:00 am As radioactive dose exceeding 500μSv /h(820μSv /h) was measured by&lt;br /&gt;
monitoring post, it was judged to specific issue (radioactive dose at&lt;br /&gt;
boundary abnormally raised) based on Article15, clause1 of Act on Special&lt;br /&gt;
Measures Concerning Nuclear Emergency Preparedness occurred, and&lt;br /&gt;
reported to the authorities at 8:00.&lt;br /&gt;
9:12 am As radioactive dose exceeding 500μSv /h(518.7μSv /h) was measured by&lt;br /&gt;
monitoring post, it was judged to specific issue (radioactive dose at&lt;br /&gt;
boundary abnormally raised) based on Article15, clause1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
occurred, and reported to the authorities at 9:34.&lt;br /&gt;
11:01 am The large valve of suppression chamber became (hereinafter “S/C”)&lt;br /&gt;
“Close” because of the explosion of building of Unit 3. Incapable of&lt;br /&gt;
“Open” was confirmed. Prepared water injection line was not&lt;br /&gt;
available because of breakage of the fire engine and the hose.&lt;br /&gt;
1:05 pm Recommencement of composing line of injecting seawater including fire&lt;br /&gt;
engine.&lt;br /&gt;
1:18 pm As Reactor water level was downward trend , reported to start preparation&lt;br /&gt;
work such as injecting seawater to the Reactor immediately to the&lt;br /&gt;
authorities.&lt;br /&gt;
1:25 pm As Reactor water level is decreasing, the RCIC function seems to be lost,&lt;br /&gt;
judged Article15, clause1 of Act on Special Measures Concerning Nuclear&lt;br /&gt;
Emergency Preparedness occurred (Lost Reactor Cooling Function) , and&lt;br /&gt;
reported to the authorities at 1:38 pm.&lt;br /&gt;
3:26 pm Evaluated TAF reaching time is 4:30 pm, reported it to the authorities.&lt;br /&gt;
4:30 pm Activated fire engine for injecting seawater to the Reactor.&lt;br /&gt;
4:34 pm Started operation for reducing Reactor pressure, and reported to start&lt;br /&gt;
injecting seawater using fire protection system to authorities.&lt;br /&gt;
5:17 pm Reactor water level reached TAF. Reported it to the authorities at 5:25 pm.&lt;br /&gt;
Page 27 Page 27&lt;br /&gt;
Approx. Approx.&lt;br /&gt;
6:00 pm Started Reactor depressurization (Reactor pressure 5.4MPa=&gt;7:03 pm&lt;br /&gt;
0.63 MPa ).&lt;br /&gt;
6:22 pm Reactor water level reached TAF-3,700mm. Judge the fuel was exposed to&lt;br /&gt;
air. Reported to the authorities at 7:32pm.&lt;br /&gt;
7:20 pm Confirmed the fire engine for injecting seawater to the Reactor stopped due&lt;br /&gt;
to out of fuel.&lt;br /&gt;
7:54 pm&lt;br /&gt;
Started injecting seawater to the Reactor from Fire Protection&lt;br /&gt;
System by fire engine (started up at 7:54 pm and 7:57)&lt;br /&gt;
Approx. Approx.&lt;br /&gt;
9:00 pm Operated to open the small valve of S/C vent valve(AO valve). The&lt;br /&gt;
vent line composition was completed except for rupture disc.&lt;br /&gt;
9:20 pm Opened 2 Safety Release Valves (hereinafter SRV) and confirmed&lt;br /&gt;
recovering of water level. Reported it to the authorities at 9:34 pm (as of&lt;br /&gt;
9:30 pm Reactor water level=TAF-3,000mm).&lt;br /&gt;
9:35 pm As radioactive dose exceeding 500 μSv/h was measured by monitoring&lt;br /&gt;
car(760μSv/h), it was judged to specific issue (radioactive dose at&lt;br /&gt;
boundary abnormally raised) based on Article15, clause1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness occurred,&lt;br /&gt;
and reported to the authorities at 10:35 pm.&lt;br /&gt;
10:50 pm As Dry Well (hereinafter D/W) pressure exceeded maximum usage&lt;br /&gt;
pressure 427kPa gage, it was judged to specific issue (RPV pressure&lt;br /&gt;
abnormally raised) based on Article15, clause1 of Act on Special&lt;br /&gt;
Measures Concerning Nuclear Emergency Preparedness occurred, and&lt;br /&gt;
reported to the authorities at 11:39 pm.&lt;br /&gt;
Approx. Approx.&lt;br /&gt;
11:35 pm As the pressure at S/C side was lower than working pressure of the&lt;br /&gt;
rupture disk and the pressure at D/W side was raising, decided measure&lt;br /&gt;
of vent operation with opening small valve of D/W vent.&lt;br /&gt;
Tuesday, March 15, 2011&lt;br /&gt;
12:02 am Operated to open the small valve of D/W vent valve (AO valve). Vent&lt;br /&gt;
line composition except for rupture disc was completed (confirmed&lt;br /&gt;
the valve was closed few minutes later).&lt;br /&gt;
3:00 am As D/W pressure exceeded designed maximum usage pressure, tried to&lt;br /&gt;
operate to reduce pressure and injecting water to the Reactor. But the&lt;br /&gt;
Page 28 Page 28&lt;br /&gt;
situation was not depressurized sufficiently. Reported it to the authorities&lt;br /&gt;
at 4:17 am.&lt;br /&gt;
Approx. Approx.&lt;br /&gt;
6:00-6:10 am A large impulsive sound occurred around suppression chamber.&lt;br /&gt;
6:50 am As radioactive dose exceeding 500μSv/h(518.7μSv /h) was measured at&lt;br /&gt;
around main gate, it was judged to specific issue (radioactive dose at&lt;br /&gt;
boundary abnormally raised) based on Article15, clause1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
occurred, and reported to the authorities at 7:00 am.&lt;br /&gt;
7:00 am Report to authorities on evacuation to Fukushima Daini except for the&lt;br /&gt;
needed personnel such as monitoring and work.&lt;br /&gt;
8:11 am As radioactive dose exceeding 500μSv/h(807μSv /h) was measured by&lt;br /&gt;
monitoring post, it was judged to specific issue (radioactive materials&lt;br /&gt;
abnormally released due to fire disaster and explosion)&lt;br /&gt;
based on&lt;br /&gt;
Article15, clause1 of Act on Special Measures Concerning Nuclear&lt;br /&gt;
Emergency Preparedness occurred, and reported to the authorities at&lt;br /&gt;
8:36am. At 8:25 am, confirmed white smoke (seems steam) rising out&lt;br /&gt;
from the wall around 5&lt;br /&gt;
th th&lt;br /&gt;
floor of Reactor Building, reported to the&lt;br /&gt;
authorities at 9:18pm.&lt;br /&gt;
4:00 pm As radioactive dose exceeding 500μSv/h(531.6μSv /h) was measured at&lt;br /&gt;
main gate, it was judged to specific issue (radioactive dose at boundary&lt;br /&gt;
abnormally raised) based on Article15, clause1 of Act on Special&lt;br /&gt;
Measures Concerning Nuclear Emergency Preparedness occurred, and&lt;br /&gt;
reported to the authorities at 4:22 pm.&lt;br /&gt;
11:05 pm As radioactive dose exceeding 500μSv/h(4548μSv /h) was measured at&lt;br /&gt;
around main gate, it was judged to specific issue (radioactive dose at&lt;br /&gt;
boundary abnormally raised) based on Article15, clause1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
occurred, and reported to the authorities at 11:20 pm.&lt;br /&gt;
END&lt;br /&gt;
Page 29 Page 29&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station Unit 2&lt;br /&gt;
Alternative Water Injection&lt;br /&gt;
This report is summary of the fact information and verbal evidence currently we have.&lt;br /&gt;
When we found new facts through the continuous investigation, we will update fact in this&lt;br /&gt;
report.&lt;br /&gt;
○Activities after Determination and Reporting of Loss of ECCS at 16:36 on&lt;br /&gt;
March11.&lt;br /&gt;
【 Planning for Alternative Injection 】&lt;br /&gt;
・ At 17:12, start examination of using alternative method of water injection&lt;br /&gt;
(Fire Protection System(“FP”), Feed Water Make-up System and&lt;br /&gt;
Containment Vessel Cooling System), which are installed under&lt;br /&gt;
Accident Management Plan(“AP) and using fire engine with water from&lt;br /&gt;
fire protection pool which was installed as a lesson of Chuetu-Oki&lt;br /&gt;
Earthquake.&lt;br /&gt;
・ In the Main Control Room, to secure alternative method of water injection,&lt;br /&gt;
prepare AM manual on the Chief Unit Operator&#39;s desk and conduct&lt;br /&gt;
confirmation of water injection line into the reactor .&lt;br /&gt;
・ Taking the radiation level of Unit 1 into consideration, before the radiation&lt;br /&gt;
getting higher, in order to establish water injection line for alternative&lt;br /&gt;
method by way of Residual Heat Reduction System, open the valves of&lt;br /&gt;
Residual Heat Removal System manually in the turbine and reactor&lt;br /&gt;
building, in the darkness, and secure the situation where water injection is&lt;br /&gt;
possible after decompression of reactor (below 0.69MPa).&lt;br /&gt;
・ Restoration Team of Power Station Emergency Response Team has&lt;br /&gt;
confirmed status of submergence and damage of Power Panel (High&lt;br /&gt;
Voltage Clad Switch Gear, Power Center) and as a result of insulation&lt;br /&gt;
resistance test, confirmed one of the power center was alive and start&lt;br /&gt;
examination of water injection by using Control Rod Drive System(“CRD”)&lt;br /&gt;
and Standby Liquid Control System(“SLC”), where high pressure water&lt;br /&gt;
injection is possible, after power restoration to power center by power&lt;br /&gt;
supply vehicle.&lt;br /&gt;
・ At 22:00，water level gauge of the reactor has turned out and as its reading&lt;br /&gt;
was Top of Active Fuel(“TAF”) +3400mm, confirmed not reaching TAF.&lt;br /&gt;
Page 30 Page 30&lt;br /&gt;
【 Restoration of power for alternative water injection 】&lt;br /&gt;
As power panel and pumps of CRD and SLC was not damaged by sea water,&lt;br /&gt;
and high pressure water injection was possible, restoration of power by power&lt;br /&gt;
supply vehicle to the power center was carried out.&lt;br /&gt;
・ At around 15:30, though cable was connected to the primary side of the P/C&lt;br /&gt;
of Unit 2 and, in parallel, connection was made between high voltage power&lt;br /&gt;
supple vehicle, at 15:36 explosion occurred at Unit 1. Installed cables were&lt;br /&gt;
damaged by explosion litter and high voltage poser supply vehicle was&lt;br /&gt;
tripped. All the workers stopped their work and evacuated to the Main&lt;br /&gt;
Anti-Earthquake Building.&lt;br /&gt;
・ On the next day, tried restart of power supply vehicle, which was connected to&lt;br /&gt;
power center of unit 2, however, current surge relay was operated and failed&lt;br /&gt;
to supply power.&lt;br /&gt;
○Activities after 「 3/13 12:05 Direction by Station Manager to prepare to use sea&lt;br /&gt;
water 」&lt;br /&gt;
【 Start preparation of sea water injection 】&lt;br /&gt;
・ In preparation of RCIC out of service, in order to secure switching of sea&lt;br /&gt;
water injection, proceed establishment of water line of back wash valve pit&lt;br /&gt;
of Unit 3 as water source, and installed hose pipe of fore engines.&lt;br /&gt;
【 Reestablishment of sea water injection pipe line after explosion of Unit 3 】&lt;br /&gt;
・ At 3/14 11:01 ， due to the explosion of reactor building of Unit 3, to&lt;br /&gt;
secure safety all the workers evacuated from site. Hose piping was&lt;br /&gt;
ready to use but were unavailable to use due to the damage of fire&lt;br /&gt;
engines and hose pipe.&lt;br /&gt;
・ In the afternoon, immediately dashed off to the site and confirmed&lt;br /&gt;
status of the site and, according to the scattered situation of rubble,&lt;br /&gt;
decided to precede injecting water sourcing not from the back wash&lt;br /&gt;
valve pit of Unit 3 but directly from the shallow draft quay. In the high&lt;br /&gt;
radiation environment surrounded by scattered rubble, proceed&lt;br /&gt;
preparing new water injection line by using useable fire engines and&lt;br /&gt;
hose pipe.&lt;br /&gt;
・ At 13:18，water level of reactor was in the down trend, at 13:25，determined&lt;br /&gt;
lose of RCIC function. Estimated from the current situation, reaching TAF&lt;br /&gt;
will be at around 16:30. Continuously prepare for sea water injection and at&lt;br /&gt;
Page 31 Page 31&lt;br /&gt;
14:43connected to FP by fire engine.&lt;br /&gt;
・ From after 15PM to after 16PM， due to the aftershocks centered in&lt;br /&gt;
offshore of Fukushima Prefecture, work was conducted with&lt;br /&gt;
difficulties of suspension of work and evacuation.&lt;br /&gt;
・ At around 16:30started fire engine and prepared for the readiness to&lt;br /&gt;
start water injection when decompression of reactor.&lt;br /&gt;
【 Decompression of Reactor 】&lt;br /&gt;
・ In order to inject water from fire engine, decompression of reactor by&lt;br /&gt;
opening Safety and Relief Valve (“SR”) was necessary , however, as&lt;br /&gt;
temperature and pressure of Suppression Chamber (“S/C”) was so&lt;br /&gt;
high (3/14 12:30 S/C Temperature was 149.3℃ and S/C pressure was&lt;br /&gt;
486Pa) that, even if the SR valve was opened, there was a possibility&lt;br /&gt;
of pressure reduction difficulty as the steam will not be condensed,&lt;br /&gt;
decided after conducting Containment Vessel Vent (“Vent”), then open&lt;br /&gt;
the SR valve and water injection will be started.&lt;br /&gt;
・ At around 16:00 頃，as it was foreseeable taking time until opening vent&lt;br /&gt;
valve, changed priority on decompression of reactor by opening SR valve.&lt;br /&gt;
Station manger also directed to conduct opening vent valve in parallel.&lt;br /&gt;
・ Under the lack of power, battery was necessary to open the SR valve.&lt;br /&gt;
Gathered batteries out from the cars and carried to main control room&lt;br /&gt;
and connected to the electricity cable, however, as the power voltage&lt;br /&gt;
was lacking, add batteries, try operating several SR valves, continue&lt;br /&gt;
efforts to decompressing reactor and at around 18:00 start decompression&lt;br /&gt;
of the reactor.&lt;br /&gt;
・ Time was consumed as the temperature and pressure of S/C was high and&lt;br /&gt;
difficult condition for condensation.&lt;br /&gt;
Reactor pressure 6.998MPa(16:34)→6.075MPa(18:03)→0.63MPa(19:03)&lt;br /&gt;
［ Restart of Fire Engines ］&lt;br /&gt;
・ Radiation at site was high and confirmation of operating status of fire&lt;br /&gt;
engines was forced in rotation, at 19:20, confirmed fire engine which was&lt;br /&gt;
used for water injection was stopped due to the shortage of fuel. After&lt;br /&gt;
fueling, started water injection into the reactor by using FP line by fire&lt;br /&gt;
engine(at 19:54, 19:57 started respectively).&lt;br /&gt;
End End&lt;br /&gt;
Page 32 Page 32&lt;br /&gt;
Unit 2, Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
The operation of the vent valve at the PCV&lt;br /&gt;
This summarizes the facts based on info and testimony available to date. We will&lt;br /&gt;
continue the investigation. If new facts are confirmed at a later date, we will announce&lt;br /&gt;
again.&lt;br /&gt;
?&lt;br /&gt;
Activities after report “At 4:36 PM on March 11, Determination and Report of&lt;br /&gt;
ECCS&#39;s inability to inject water”&lt;br /&gt;
・ As a result of restoration work of instruments, at 9:50 PM, we could confirm the&lt;br /&gt;
Reactor water level (Top of Active Fuel +3400mm). At 11:25 PM, we could confirm&lt;br /&gt;
the D/W pressure (0.141MPa abs). At 2:55 AM, on March 12, we could confirm&lt;br /&gt;
operation of RCIC. We decided to prioritize opening the vent valve (“Vent”) for&lt;br /&gt;
Unit 1 . We proceeded with Vent of Unit 1. At the same time, we continued&lt;br /&gt;
monitoring parameters of Unit 2.&lt;br /&gt;
?&lt;br /&gt;
Activities after “At 5:30 PM on March 12, Instruction from the Station Manager to&lt;br /&gt;
proceed with the preparation of Vent”&lt;br /&gt;
【 Preparation work for Vent 】&lt;br /&gt;
・ Water injection to the Reactor by RCIC continued. D/W pressure was stable at&lt;br /&gt;
200～300kPaabs. As we expected that sooner or later we have to do Vent, we&lt;br /&gt;
began preparation for the venting line-up together with Unit 3. As the dose at the&lt;br /&gt;
field site was low, we decided to open valves for Vent, other than the rupture disk.&lt;br /&gt;
・ At 12:06 AM on March 12, we confirmed that D/W pressure for Unit 1 may have&lt;br /&gt;
exceeded 600kPa abs. We started the actual work for Vent. At that time, as for Unit&lt;br /&gt;
2, we checked from the drawings of valves whether we could manually open&lt;br /&gt;
valves required for Vent and whether we could attach the jig and force the&lt;br /&gt;
valve open. Based on the result, the piping and instrumentation diagram, AM&lt;br /&gt;
operation procedure and the Vent procedure for Unit 1, we confirmed the operation&lt;br /&gt;
procedure of valves for Vent (PCV vent valve (MO valve) can be opened manually&lt;br /&gt;
S/C vent valve (AO valve) cannot be opened manually) and prepared the Vent&lt;br /&gt;
procedure. We also checked the places of valves for Vent using the valve check&lt;br /&gt;
sheet.&lt;br /&gt;
（From here, March 13）&lt;br /&gt;
【 Open PCV vent valve (MO valve) and S/C vent valve (AO valve)-large 】&lt;br /&gt;
・ In order to manually open PCV vent valve (MO valve), shift operators wore&lt;br /&gt;
Page 33 Page 33&lt;br /&gt;
necessary equipments such as the self-contained breathing apparatus,&lt;br /&gt;
brought the flashlight and departed for R/B.&lt;br /&gt;
・ At 8:10 AM, opened PCV vent valve (MO valve) by 25% per the operation&lt;br /&gt;
procedure.&lt;br /&gt;
・ At 11:00 AM, we excited the solenoid for S/C vent valve (AO valve)-large by a small&lt;br /&gt;
generator for the temporary lighting at the Main Control Room and opened S/C vent&lt;br /&gt;
valve (AO valve)-large. We made up the vent line other than the rupture disk.&lt;br /&gt;
（D/W pressure was lower than the working pressure of the rupture disk (427kPa&lt;br /&gt;
gauge), so Vent hadn&#39;t yet occurred. We kept the vent valves open and continued&lt;br /&gt;
monitoring D/W pressure.）&lt;br /&gt;
?&lt;br /&gt;
Activities after “At 11:01 AM on March 14, R/B of Unit 3 exploded. The water&lt;br /&gt;
injection line prepared was out of order because of damage to the fire engine and&lt;br /&gt;
hose.”&lt;br /&gt;
【 Impact of the explosion 】&lt;br /&gt;
・ Because of the explosion, the excitation of the solenoid for S/C vent valve (AO&lt;br /&gt;
valve)-large turned off and the S/C vent valve closed. We had to do the venting&lt;br /&gt;
line-up again.&lt;br /&gt;
・ After the explosion, workers other than shift operators at the Main Control&lt;br /&gt;
Room suspended all works and evacuated to the main anti-earthquake&lt;br /&gt;
building. As we had to confirm the workers &#39; safety and the status of the field&lt;br /&gt;
site, we couldn &#39; t resume work for a while.&lt;br /&gt;
・ D/W pressure was around 450kPa abs, stable below the Vent pressure.&lt;br /&gt;
【 Open S/C vent valve (AO valve)-small 】&lt;br /&gt;
・ After the instruction for evacuation was lifted, at 4:00 PM, we tried to open S/C vent&lt;br /&gt;
valve (AO valve)-large. At 4:20 PM, as the air pressure from the compressor was&lt;br /&gt;
insufficient, we couldn&#39;t open.&lt;br /&gt;
・ As there was no change on D/W pressure, at 6:35 PM, we tried to open not only S/C&lt;br /&gt;
vent valve (AO valve)-large but also S/C vent valve (AO valve)-small to restore the&lt;br /&gt;
vent line. We presumed that we couldn&#39;t open S/C vent valve (AO valve)-large&lt;br /&gt;
because of malfunction of solenoid.&lt;br /&gt;
・ At 9:00 PM, we could slightly open S/C vent valve (AO valve)-small. We established&lt;br /&gt;
the venting line-up other than the rupture disk.&lt;br /&gt;
（D/W pressure was lower than the working pressure of the rupture disk (427kPa&lt;br /&gt;
gauge), so Vent hadn&#39;t yet occurred. We kept the vent valves open and continued&lt;br /&gt;
monitoring D/W pressure.）&lt;br /&gt;
Page 34 Page 34&lt;br /&gt;
【 open D/W vent valve -small 】&lt;br /&gt;
・ At 10:50 PM，D/W pressure increased. As the pressure exceeded the maximum&lt;br /&gt;
operating pressure (427kPa gauge), we determined that specific incident stipulated&lt;br /&gt;
in article 15 of Act on Special Measures Concerning Nuclear Emergency&lt;br /&gt;
Preparedness”D/W pressure excessively high” occurred.&lt;br /&gt;
・ D/W pressure was in upward trend whereas S/C pressure was stable around 300&lt;br /&gt;
～400kPa abs. The pressure was not unified. As S/C pressure was lower than the&lt;br /&gt;
working pressure of the rupture disk and D/W pressure increased, we decided to&lt;br /&gt;
open D/W vent valve (AO valve)-small to do Vent.&lt;br /&gt;
・ At 12:02 AM on March 15, we finished preparation of the venting line-up other than&lt;br /&gt;
the rupture disk. A few minutes later, we confirmed that the rupture disk was closed.&lt;br /&gt;
（D/W pressure did not go down from 750kPa abs. After that, D/W pressure was&lt;br /&gt;
stable but high.）&lt;br /&gt;
?&lt;br /&gt;
Activities after “ At 6:00～6:10 AM on March 15, a big boom occurred around the&lt;br /&gt;
suppression chamber ”&lt;br /&gt;
・ At 6:00～6:10, a big boom occurred around the S/C. The measured S/C pressure&lt;br /&gt;
went down to 0MPaabs.&lt;br /&gt;
・ Other than TEPCO employees and workers required for plant supervision and&lt;br /&gt;
temporary restoration work, we temporarily evacuated to Fukushima Daini.&lt;br /&gt;
? 650 persons moved to Fukushima Daini. 70 persons stayed at the power&lt;br /&gt;
station headquarters.&lt;br /&gt;
・ Shift operators periodically went to the Main Control Room to log D/W pressure etc.&lt;br /&gt;
? At 11:25 AM, we confirmed decrease in D/W pressure (730kPa&lt;br /&gt;
abs(7:20)→155kPa abs(11:25))&lt;br /&gt;
End End&lt;br /&gt;
Page 35 Page 35&lt;br /&gt;
Time line sequence of major events following earthquake to May 15&lt;br /&gt;
th th&lt;br /&gt;
(Tue) for Unit 3 at Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
This report is based on various information as well as testimonies received from&lt;br /&gt;
relevant people up to this point in time. Further announcements may be released upon&lt;br /&gt;
the discovery of new information identified during the investigation.&lt;br /&gt;
Friday, March 11, 2011&lt;br /&gt;
2:46 pm Great East Japan Earthquake occurred. 3rd emergency attitude was&lt;br /&gt;
automatically announced.&lt;br /&gt;
2:47 pm Reactor scram occurred automatically , main turbine tripped manually.&lt;br /&gt;
Around 2:48 pm Emergency diesel generators activated automatically&lt;br /&gt;
2:54 pm It was confirmed that the reactor was subcritical&lt;br /&gt;
3:05 pm Reactor Core Isolation Cooling System (hereinafter called “RCIC”) activated&lt;br /&gt;
manually&lt;br /&gt;
3:06 pm Emergency Center was established at the main office (in order to figure out the&lt;br /&gt;
damage situation caused by the earthquake and to restore the blackouts)&lt;br /&gt;
3:25 pm RCIC tripped (as the reactor water level was high)&lt;br /&gt;
3:27 pm 1st wave of the seismic sea wave arrived&lt;br /&gt;
3:35 pm 2nd wave of the seismic sea wave arrived&lt;br /&gt;
3:38 pm All AC electric power supply was lost&lt;br /&gt;
3:42 pm It was determined that a specific incident stipulated in article 10, clause 1 of&lt;br /&gt;
Act on Special Measures Concerning Nuclear Emergency Preparedness (loss&lt;br /&gt;
of all AC electric supply) occurred and it was informed to the government&lt;br /&gt;
offices etc.&lt;br /&gt;
3:42 pm 1st emergency attitude was announced. Contingency Planning Center was&lt;br /&gt;
established (and combined with Emergency Center)&lt;br /&gt;
4:03 pm RCIC activated manually&lt;br /&gt;
4:36 pm 2nd emergency attitude was announced&lt;br /&gt;
8:50 pm Fukushima prefecture ordered the residents within 2km radius of the periphery of&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station to evacuate&lt;br /&gt;
9:23 pm Prime Minister ordered the residents within 3km radius of the periphery of&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station to evacuate, and the residents within 3km&lt;br /&gt;
to 10km radius of the periphery to evacuate indoors&lt;br /&gt;
9:58 pm Temporary lights in the main control room were turned on.&lt;br /&gt;
Page 36 Page 36&lt;br /&gt;
Saturday, March 12, 2011&lt;br /&gt;
0:30 am Government confirmed the completion of evacuation of the residents (3km radius of&lt;br /&gt;
the periphery of Fukushima Daiichi Nuclear Power Station in Futaba Town and&lt;br /&gt;
Okuma Town, reconfirmed at 1:45 am)&lt;br /&gt;
4:55 am Increase of the radiation dose was confirmed (Near the main gate, 0.069μSv/h,&lt;br /&gt;
4:00 am to → 0.59μSv/h, 4:23 am), and it was informed to the government offices&lt;br /&gt;
etc. etc.&lt;br /&gt;
5:44 am Prime Minister ordered the residents 10km radius of the periphery of Fukushima&lt;br /&gt;
Daiichi Nuclear Power Station to evacuate.&lt;br /&gt;
7:11 am Prime Minister arrived at Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
8:04 am Prime Minister departed from Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
11:36 am RCIC tripped&lt;br /&gt;
0:35 pm High Pressure Core Injection System (hereinafter called “HPCI”) activated&lt;br /&gt;
automatically (as the reactor water level was low)&lt;br /&gt;
5:30 pm Plant manager ordered to prepare for the vent of primary containment vessel&lt;br /&gt;
(hereinafter called “vent”)&lt;br /&gt;
6:25 pm Prime Minister ordered the residents 20km radius of the periphery of Fukushima&lt;br /&gt;
Daiichi Nuclear Power Station to evacuate&lt;br /&gt;
Sunday, March 13, 2011&lt;br /&gt;
2:42 am HPCI stopped&lt;br /&gt;
5:10 am It was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (loss of reactor&lt;br /&gt;
cooling function) occurred as the injection of water by RCIC was impossible, and it&lt;br /&gt;
was informed to the government offices etc. at 5:58 am&lt;br /&gt;
5:15 am Plant manager ordered to complete the lineup of the vent except for the&lt;br /&gt;
rupture disk&lt;br /&gt;
5:50 am Press release of implementation of the vent&lt;br /&gt;
6:19 am As it was determined that the water level reached to the top of active fuel&lt;br /&gt;
(hereinafter called “TAF”) at 4:15 am, it was informed to the government offices etc.&lt;br /&gt;
7:35 am The result of the evaluation exposure dose by vent was informed to the government&lt;br /&gt;
offices etc.&lt;br /&gt;
7:39 am Spray inside the primary containment vessel started, and it was informed to the&lt;br /&gt;
government offices etc. at 7:56 am&lt;br /&gt;
8:35 am Primary containment vessel (hereinafter called “PCV”) vent valve (MO valve) was&lt;br /&gt;
Page 37 Page 37&lt;br /&gt;
opened&lt;br /&gt;
8:41 am By opening the large valve of the vent valve (AO valve) of the suppression&lt;br /&gt;
chamber (hereinafter called “S/C”), the configuration of the vent line was&lt;br /&gt;
completed except for the rupture disk. It was informed to the government&lt;br /&gt;
offices etc. at 8:46 am&lt;br /&gt;
8:56 am As the radiation dose over 500μSv/h was measured at the monitoring post, it was&lt;br /&gt;
determined that a specific incident stipulated in article 15, clause 1 of Act on Special&lt;br /&gt;
Measures Concerning Nuclear Emergency Preparedness (radiation dose at the&lt;br /&gt;
border of the site increased extraordinary) occurred and it was reported to the&lt;br /&gt;
government offices etc. at 9:01 am&lt;br /&gt;
Around 9:08 am A rapid depressurization of the reactor pressure by safety relief valve was&lt;br /&gt;
implemented. It was informed to the government offices at 9:20 am that injection of&lt;br /&gt;
water to the reactor through fire extinction system will be implemented hereafter&lt;br /&gt;
9:25 am Injection of fresh water (with boric acid) into the reactor by fire truck through fire&lt;br /&gt;
extinction system was started&lt;br /&gt;
9:36 am Drop of drywell (hereinafter called “D/W”) pressure caused by vent operation&lt;br /&gt;
was confirmed. It was informed to the government offices that injection of&lt;br /&gt;
water to the reactor through fire extinction system started&lt;br /&gt;
10:30 am Plant Manager ordered to intend an injection of sea water&lt;br /&gt;
11:00 am Prime minister ordered the residents 20km to 30km radius of the periphery of&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station to evacuate indoors&lt;br /&gt;
11:17 am The close of large valve of S/C vent valve (AO valve) was confirmed (as the&lt;br /&gt;
pressure of the air tank for the actuation dropped)&lt;br /&gt;
12:20 am Injection of fresh water terminated&lt;br /&gt;
12:30 am The large valve of S/C vent valve (AO valve) was opened (as the air tank for the&lt;br /&gt;
actuation was exchanged)&lt;br /&gt;
1:12 pm Injection of sea water into the reactor through the fire extinction system&lt;br /&gt;
started&lt;br /&gt;
2:15 pm As the radiation dose over 500μSv/h was measured at the monitoring post&lt;br /&gt;
(905μSv/h), it was determined that a specific incident stipulated in article 15, clause&lt;br /&gt;
1 of Act on Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
(radiation dose at the border of the site increased extraordinary) occurred and it was&lt;br /&gt;
reported to the government offices etc. at 2:23 pm&lt;br /&gt;
Monday, March 14, 2011&lt;br /&gt;
1:10 am As there were little sea water left to inject into the reactor, a fire truck was arranged&lt;br /&gt;
Page 38 Page 38&lt;br /&gt;
to supply sea water into the reversing valve pit&lt;br /&gt;
2:20 am As the radiation dose over 500μSv/h was measured near the main gate (751μSv/h),&lt;br /&gt;
it was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (radiation dose at&lt;br /&gt;
the border of the site increased extraordinary) occurred and it was reported to the&lt;br /&gt;
government offices etc. at 4:24 am&lt;br /&gt;
2:40 am As the radiation dose over 500μSv/h was measured at the monitoring post&lt;br /&gt;
(650μSv/h), it was determined that a specific incident stipulated in article 15, clause&lt;br /&gt;
1 of Act on Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
(radiation dose at the border of the site increased extraordinary) occurred and it was&lt;br /&gt;
reported to the government offices etc. at 5:37 am&lt;br /&gt;
3:20 am Injection of sea water by fire truck restarted&lt;br /&gt;
4:00 am As the radiation dose over 500μSv/h was measured at the monitoring post&lt;br /&gt;
(820μSv/h), it was determined that a specific incident stipulated in article 15, clause&lt;br /&gt;
1 of Act on Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
(radiation dose at the border of the site increased extraordinary) occurred and it was&lt;br /&gt;
reported to the government offices etc. at 8:00 am&lt;br /&gt;
5:20 am The operation of the small valve of the S/C vent valve (AO valve) started&lt;br /&gt;
6:10 am It was confirmed that the small valve of the S/C valve (AO valve) was opened&lt;br /&gt;
9:12 am As the radiation dose over 500μSv/h was measured at the monitoring post&lt;br /&gt;
(518.7Sv/h), it was determined that a specific incident stipulated in article 15, clause&lt;br /&gt;
1 of Act on Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
(radiation dose at the border of the site increased extraordinary) occurred and it was&lt;br /&gt;
reported to the government offices etc. at 9:34 am&lt;br /&gt;
9:20 am The injection of sea water from the shallow draft quay into the reversing valve pit&lt;br /&gt;
was started&lt;br /&gt;
11:01 am An explosion occurred in the reactor building. Injection of sea water&lt;br /&gt;
stooped as the fire truck and hose were damaged&lt;br /&gt;
Around 4:30 pm New injection line into the reactor was constructed by exchanging&lt;br /&gt;
the fire truck and horse, and the injection of sea water restarted&lt;br /&gt;
9:35 pm As the radiation dose over 500μSv/h was measured by the monitoring car&lt;br /&gt;
(760Sv/h), it was determined that a specific incident stipulated in article 15, clause 1&lt;br /&gt;
of Act on Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
(radiation dose at the border of the site increased extraordinary) occurred and it was&lt;br /&gt;
reported to the government offices etc. at 10:35 pm&lt;br /&gt;
Page 39 Page 39&lt;br /&gt;
Tuesday, March 15, 2011&lt;br /&gt;
6:50 am As the radiation dose over 500μSv/h was measured near the main gate (583.7Sv/h),&lt;br /&gt;
it was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (radiation dose at&lt;br /&gt;
the border of the site increased extraordinary) occurred and it was reported to the&lt;br /&gt;
government offices etc. at 7:00 am&lt;br /&gt;
7:00 am It was informed to the government offices etc. that the employees except for the&lt;br /&gt;
needed personnel for the monitoring and the operation would evacuate temporally to&lt;br /&gt;
the Fukushima Daini Nuclear Power Station&lt;br /&gt;
7:55 am Steam floating at the upper side of the reactor building was confirmed, and it was&lt;br /&gt;
informed to the government offices etc.&lt;br /&gt;
8:11 am As the radiation dose over 500μSv/h was measured near the main gate (807Sv/h),&lt;br /&gt;
it was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (extraordinary&lt;br /&gt;
emission of radioactive material result from fire and explosion etc.) occurred and it&lt;br /&gt;
was reported to the government offices etc. at 8:36 am&lt;br /&gt;
4:00 pm As the radiation dose over 500μSv/h was measured at the main gate (531.6Sv/h), it&lt;br /&gt;
was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (radiation dose at&lt;br /&gt;
the border of the site increased extraordinary) occurred and it was reported to the&lt;br /&gt;
government offices etc. at 4:22 pm&lt;br /&gt;
11:05 pm As the radiation dose over 500μSv/h was measured near the main gate&lt;br /&gt;
(4,548Sv/h), it was determined that a specific incident stipulated in article 15, clause&lt;br /&gt;
1 of Act on Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
(radiation dose at the border of the site increased extraordinary) occurred and it was&lt;br /&gt;
reported to the government offices etc. at 11:20 pm&lt;br /&gt;
Page 40 Page 40&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station Unit 3&lt;br /&gt;
Alternative Water Injection&lt;br /&gt;
This document is a summary of the latest information obtained through information and&lt;br /&gt;
interviews with personnel concerned. We will continue investigation and announce when&lt;br /&gt;
new facts and findings are obtained.&lt;br /&gt;
Activities after “the stoppage of RCIC at 11:36 am on March 12”&lt;br /&gt;
【 Water Injection by Fire Engines 】&lt;br /&gt;
・ Fire engines in the site were called but could not arrive, because they were&lt;br /&gt;
all being used for water injection to Unit 1.&lt;br /&gt;
・ Since tsunami occurred, the traffic between Unit 3 and Unit 5/6 had been&lt;br /&gt;
disrupted due to the damage of the road and rubbles caused by tsunami.&lt;br /&gt;
However, as restoration work such as road leveling with sandbags and&lt;br /&gt;
removal of rubbles progressed, the restored traffic between Unit 3 and Unit&lt;br /&gt;
5/6 allowed us to bring the fire engines from Unit 5/6. Also, a fire engine&lt;br /&gt;
prepared as a backup facility for the emergency of Fukushima Daini moved to&lt;br /&gt;
Fukushima Daiichi. Fire engines for water injection were lined up, sourcing&lt;br /&gt;
freshwater from fire cistern.&lt;br /&gt;
・ In order to inject water by fire engines, it was necessary to decrease the&lt;br /&gt;
reactor pressure by operating Safety Relief Valve (S/R Valve), but S/R Valve&lt;br /&gt;
was not able to be operated because batteries had run out. Since batteries in&lt;br /&gt;
the site were already collected for the restoration of indicators, Unit 1 and 2,&lt;br /&gt;
there were no extra batteries in the site. Therefore, we removed and&lt;br /&gt;
gathered batteries from employees&#39; car and connected them to indicators of&lt;br /&gt;
Main Control Room. At approximately 9:08 am we opened S/R Valve and&lt;br /&gt;
conducted rapid decrease of the reactor pressure.&lt;br /&gt;
・ Through that operation the reactor pressure went below the fire engines&#39; jet&lt;br /&gt;
force, which allowed us to start alternative water injection by fire engines at&lt;br /&gt;
9:25 am.&lt;br /&gt;
【 Restoration of existing cooling facilities 】&lt;br /&gt;
・ We tried to restart water injection by existing cooling facilities, but could not.&lt;br /&gt;
・ We tried water injection by diesel powered fire-extinguishing pumps, but&lt;br /&gt;
could not because the reactor pressure was as high as approximately&lt;br /&gt;
4MPa.&lt;br /&gt;
・ We tried to reboot HPCI, but could not due to the lack of batteries.&lt;br /&gt;
Page 41 Page 41&lt;br /&gt;
・ We tried water injection through RCIC by confirming the situation in&lt;br /&gt;
RCIC operation room, but could not reboot it.&lt;br /&gt;
【 Restoration of High Pressure Core Injection System 】&lt;br /&gt;
・ Since the previous day we continued power restoration work via Power&lt;br /&gt;
Center in order to restore Boric Acid Injection System that was capable of&lt;br /&gt;
high pressure water injection, but the work was not successfully progressed&lt;br /&gt;
due to the interruption of the work and evacuation caused by earthquakes&lt;br /&gt;
from time to time and bad work environment (dark place, obstacles scattered&lt;br /&gt;
and manhole covers lost). As a result, the restoration was not completed.&lt;br /&gt;
Activities after Plant Manager&#39;s order “we will move by taking into account&lt;br /&gt;
seawater injection,” at 10:30 am on March 13.&lt;br /&gt;
【 Switching to seawater 】&lt;br /&gt;
・ Since freshwater of near fire cisterns ran out at 12:20 pm, we started to&lt;br /&gt;
change the water supply line in order to use seawater in the vertical shaft of&lt;br /&gt;
reversing valve. We had been well prepared for quick switching, but we were&lt;br /&gt;
forced to suspend the work by the evacuation order caused by aftershocks.&lt;br /&gt;
The work was completed as soon as it was resumed, and seawater injection&lt;br /&gt;
started at 1:12 pm.&lt;br /&gt;
・ Concurrently, we prepared additional freshwater.&lt;br /&gt;
【 Supply of seawater to the vertical shaft of reversing valve 】&lt;br /&gt;
・ We had been requesting several offices for the support of fire engines, but it&lt;br /&gt;
was not impossible for such fire engines to directly approach the power&lt;br /&gt;
station due to radioactivity and contamination in the site and bad condition of&lt;br /&gt;
the road to the station. It took longer time for fire engines to arrive at the&lt;br /&gt;
station because the drivers needed to be changed to the plant operators at&lt;br /&gt;
Off-site Center or J-Village.&lt;br /&gt;
・ We tried to take seawater accumulated at the basement of the turbine, Unit 4&lt;br /&gt;
by breaking the entrance shutters of truck bay doors of the turbine building&lt;br /&gt;
and moving fire engines to the place, but could not. Additionally, we&lt;br /&gt;
examined the possibility of taking water from the discharge channel of Unit 4&lt;br /&gt;
or the skill training center&#39;s pool, but that was not implemented.&lt;br /&gt;
・ Since the remaining amount of seawater in the vertical shaft of revering valve&lt;br /&gt;
became little at 1:10 am on March 14, we stopped the operation of fire&lt;br /&gt;
engines in order to supply seawater to the vertical shaft. With regard to&lt;br /&gt;
seawater injection to Unit 3, we were able to resume injection at 3:20 am&lt;br /&gt;
Page 42 Page 42&lt;br /&gt;
since we could take seawater by putting fire engines close to the vertical&lt;br /&gt;
shaft of reversing valve and placing the nozzle of the hose at deeper spot.&lt;br /&gt;
・ Additional fire engines arrived at the station early in the morning. In order to&lt;br /&gt;
directly take seawater and supply it to the vertical shaft of reversing valve, we&lt;br /&gt;
placed 2 fire engines at around Shallow Draft Quay and arranged the line for&lt;br /&gt;
water supply. We started supplying seawater from Shallow Draft Quay to the&lt;br /&gt;
vertical shaft of reversing valve at 9:20 am.&lt;br /&gt;
・ 7 Water Supply Vehicles (each 5 tons) of Self Defense Force that were&lt;br /&gt;
requested as the source of freshwater arrived at the station. We decided to&lt;br /&gt;
use them to supply water to the vertical shaft of reversing valve and placed&lt;br /&gt;
them at the shaft at 10:53 am. We started water supply, but stopped due to&lt;br /&gt;
the explosion of the reactor building.&lt;br /&gt;
Page 43 Page 43&lt;br /&gt;
○Activities after&lt;br /&gt;
Explosion occurred at the reactor building at 11:01 am on&lt;br /&gt;
March 14. Seawater injection was stopped since fire engines and&lt;br /&gt;
hoses got damaged.&lt;br /&gt;
【Damage】&lt;br /&gt;
・ Workers except for operators in&lt;br /&gt;
Main Control Room interrupted their&lt;br /&gt;
work&lt;br /&gt;
and and&lt;br /&gt;
evacuated to&lt;br /&gt;
Main Main&lt;br /&gt;
Anti-Earthquake Building. We could&lt;br /&gt;
not resume restoration work for a&lt;br /&gt;
while since it took time for us to&lt;br /&gt;
confirm workers safety and the&lt;br /&gt;
situation of the site. 4 TEPCO&lt;br /&gt;
employees, 3 workers of partner companies and 4 persons of Self Defense&lt;br /&gt;
Force got injured.&lt;br /&gt;
・ Rubbles with high level of radioactivity were scattered around by the&lt;br /&gt;
explosion. Seawater injection was stopped since fire engines and hoses&lt;br /&gt;
got damaged. Due to the rubbles the vertical shaft of reversing valve&lt;br /&gt;
became unusable.&lt;br /&gt;
【Restart of water injection to the reactor】&lt;br /&gt;
・ Since the vertical shaft of reversing valve was not available, we placed&lt;br /&gt;
good fire engines around Shallow Draft Quay and re-arranged hoses in&lt;br /&gt;
order to take seawater directly from sea and inject it to the reactor.&lt;br /&gt;
By connecting 2 fire engines in series, we formed the water supply line&lt;br /&gt;
toward both Unit 2 and 3. At approximately 4:30 pm, we restarted seawater&lt;br /&gt;
injection by fire engines.&lt;br /&gt;
End End&lt;br /&gt;
External View of Unit 3 after explosion&lt;br /&gt;
Page 44 Page 44&lt;br /&gt;
Unit 3, Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
The operation of the vent valve at the PCV&lt;br /&gt;
This summarizes the facts based on info and testimony available to date. We will&lt;br /&gt;
continue the investigation. If new facts are confirmed at a later date, we will announce&lt;br /&gt;
again.&lt;br /&gt;
?&lt;br /&gt;
Activities after “At 5:30 PM on March 12, Instruction from the Station Manager to&lt;br /&gt;
proceed with the preparation of opening the vent valve (“Vent”)”&lt;br /&gt;
【 Preparation work for Vent 】&lt;br /&gt;
・ At the Main Control Room, at 9:00 PM, we started considering Vent procedures.&lt;br /&gt;
We checked the sequence and places of valves and wrote on the whiteboard.&lt;br /&gt;
・ The generation team of the power station emergency response headquarters&lt;br /&gt;
( PSER ) completed the Vent procedure manual for Unit 1. Based on that Vent&lt;br /&gt;
procedure manual for Unit 1 and the accident management procedure manual for&lt;br /&gt;
Unit 3, generation team considered the Vent procedure manual for Unit 3 together&lt;br /&gt;
with the restoration team. We notified the Vent procedure manual to the Main&lt;br /&gt;
Control Room.&lt;br /&gt;
（From here, March 13）&lt;br /&gt;
・ At 4:50 AM, in order to open S/C vent valve (AO valve)-large, we excited the&lt;br /&gt;
solenoid using a small generator for the temporary lighting at the Main Control&lt;br /&gt;
Room. The shift operator checked the indicator of the valve at the Torus Room. As&lt;br /&gt;
the indicator showed “closed”, we determined that the valve was completely closed.&lt;br /&gt;
Inside the Torus Room was very hot because of the Reactor steam flow from the&lt;br /&gt;
safety relief valve to S/C (S/C is below the Torus Room). There was no lighting ie&lt;br /&gt;
complete darkness. It was a tough working environment.&lt;br /&gt;
【 finish the venting line-up 】&lt;br /&gt;
・ At 5:15 AM, Station Manager instructed to complete the venting line-up other than&lt;br /&gt;
the rupture disk and prepare for the press release.&lt;br /&gt;
・ At 5:23 AM，as the solenoid for S/C vent valve (AO valve)-large was excited but&lt;br /&gt;
the S/C vent valve was closed, we determined that we had to change the air tank.&lt;br /&gt;
After that, we changed the air tank and opened the S/C vent valve.&lt;br /&gt;
・ At 5:50 AM，we made the press release regarding Vent.&lt;br /&gt;
・ At 8:35 AM, we manually opened the vent valve (MO valve) to 15% per the&lt;br /&gt;
procedure.&lt;br /&gt;
Page 45 Page 45&lt;br /&gt;
?&lt;br /&gt;
Activities after “At 8:41 AM on March 13, with the opening of S/C vent valve (AO&lt;br /&gt;
valve)-large, we finished the venting line-up other than the rupture disk”&lt;br /&gt;
【 maintained the venting line-up 】&lt;br /&gt;
・ At 8:41AM, we finished the venting line-up. The pending was rupture of the rupture&lt;br /&gt;
disk.&lt;br /&gt;
・ At 9:24 AM, as D/W pressure went down 0.637 MPa abs (9:10 AM) to 0.540 MPa&lt;br /&gt;
abs (9:24 AM), PSER determined that Vent was done around 9:20 AM.&lt;br /&gt;
・ At 9:28 AM, as the air tank&#39;s pressure at S/C vent valve (AO valve) was in&lt;br /&gt;
downward trend, we went to the field site to tighten the connecting parts. We&lt;br /&gt;
confirmed air leakage and repaired.&lt;br /&gt;
・ At 11:17 AM, we confirmed closing of S/C vent valve (AO valve)-large due to loss of&lt;br /&gt;
air pressure. We replaced the air tank and opened. At 12:30 PM, we confirmed that&lt;br /&gt;
S/C vent valve (AO valve)-large was open.&lt;br /&gt;
・ In order to open and lock S/C vent valve (AO valve)-large S/C at open position, we&lt;br /&gt;
went to the Torus Room. As the temperature was high and there was vibration due&lt;br /&gt;
to the operation of the safety relief valve, we could not open and lock.&lt;br /&gt;
【 dose at the field site increased 】&lt;br /&gt;
・ At 2:31 PM, we observed over 300mSv/h at the north side airlock, R/B (there&lt;br /&gt;
was white gaseous substance inside) and 100mSv/h at the south side airlock.&lt;br /&gt;
At 3:28 PM, the dose at the Main Control Room of Unit 3 side went up to&lt;br /&gt;
12mSv/h. Shift operators evacuated to Unit 4 side.&lt;br /&gt;
・ At 5:52 PM, we finished charging the temporary compressor. As dose was high, the&lt;br /&gt;
restoration team of PSER brought the temporary compressor to the large&lt;br /&gt;
equipments carry-in opening by a crane truck and connected to IA line.&lt;br /&gt;
・ At 8:10 PM, we determined that S/C vent valve (AO valve)-large opened from the&lt;br /&gt;
reduction of D/W pressure.&lt;br /&gt;
・ After this, because of loss of air pressure for S/C vent valve (AO valve)-large and&lt;br /&gt;
loss of excitation of the solenoid at the air supply line, we couldn&#39;t maintain the S/C&lt;br /&gt;
vent valve open. Several times we operated the valve to open.&lt;br /&gt;
?&lt;br /&gt;
3/15 4:00 PM confirmed close ／ 3/15 4:05 PM operated to open&lt;br /&gt;
?&lt;br /&gt;
3/17 9:00 PM confirmed close ／ 3/17 9:30 PM operated to open&lt;br /&gt;
?&lt;br /&gt;
3/18 5:30 AM confirmed close ／ 3/18 5:30 AM operated to open&lt;br /&gt;
?&lt;br /&gt;
3/19 11:30 AM confirmed close ／ 3/20 11:25 AM operated to open&lt;br /&gt;
?&lt;br /&gt;
4/8 6:30 PM confirmed close&lt;br /&gt;
（From here, March 14）&lt;br /&gt;
【 add the vent line 】&lt;br /&gt;
Page 46 Page 46&lt;br /&gt;
・ From 2:00 AM, D/W pressure was in upward trend&lt;br /&gt;
※ ※&lt;br /&gt;
. We decided to open S/C vent&lt;br /&gt;
valve (AO valve)-small. At 3:40 AM, we excited the solenoid.&lt;br /&gt;
※0.265MPa abs（2:00 AM）→0.315MPa abs（3:00 AM）&lt;br /&gt;
・ At 5:20 AM, we started operation to open S/C vent valve (AO valve)-small. At 6:10&lt;br /&gt;
AM, we confirmed that the valve was open.&lt;br /&gt;
・ After this, because of loss of air pressure for S/C vent valve (AO valve)-small and&lt;br /&gt;
loss of excitation of the solenoid at the air supply line, we couldn&#39;t maintain the S/C&lt;br /&gt;
vent valve open. Several times we operated the valve to open.&lt;br /&gt;
? 3/15 4:00 PM confirmed close／3/16 1:55 AM operated to open&lt;br /&gt;
? 4/8 6:30 PM confirmed close&lt;br /&gt;
End End&lt;br /&gt;
Page 47 Page 47&lt;br /&gt;
Time line sequence of major events following earthquake to May 15&lt;br /&gt;
th th&lt;br /&gt;
(Tue) for Unit 4 to 6 at Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
This report is based on various information as well as testimonies received from&lt;br /&gt;
relevant people up to this point in time. Further announcements may be released upon&lt;br /&gt;
the discovery of new information identified during the investigation.&lt;br /&gt;
［Reference：Status of Unit 4 to 6 at the occurrence of the earthquake］&lt;br /&gt;
・ Unit 4 had been shut down since November 30&lt;br /&gt;
th th&lt;br /&gt;
, 2010 due to regular inspection. All&lt;br /&gt;
the fuels had been transferred from reactor to spent fuel pool because shroud work&lt;br /&gt;
had been conducted.&lt;br /&gt;
・ Unit 5 had been shut down since January 3&lt;br /&gt;
rd rd&lt;br /&gt;
, 2011 due to regular inspection. When&lt;br /&gt;
the earthquake occurred, fuel was installed and pressure leakage test for reactor&lt;br /&gt;
pressure vessel was being conducted.&lt;br /&gt;
・ Unit 6 had been shut down since August 14&lt;br /&gt;
th th&lt;br /&gt;
, 2010 due to regular inspection. The&lt;br /&gt;
period of shutdown had been extended due to a defect found in combustible gas&lt;br /&gt;
density control system. When the earthquake occurred, fuel was installed in the&lt;br /&gt;
reactor which was in cold shutdown.&lt;br /&gt;
Friday, March 11, 2011&lt;br /&gt;
2:46 pm Great East Japan Earthquake occurred. 3rd emergency attitude was&lt;br /&gt;
automatically announced.&lt;br /&gt;
2:47 pm Emergency diesel generator (hereinafter called “DG”) activated automatically in&lt;br /&gt;
Unit 5&lt;br /&gt;
3 DG activated automatically at Unit ６&lt;br /&gt;
3:06 pm Emergency Center was established at the head office (Recognizing the degree&lt;br /&gt;
of damages caused by the earthquake, restoring blackouts)&lt;br /&gt;
3:27 pm 1st seismic sea wave arrived&lt;br /&gt;
3:35 pm 2nd seismic sea wave arrived&lt;br /&gt;
3:36 pm 2 DG in Unit 6 tripped&lt;br /&gt;
3:38 pm All AC electric power supply was lost in Unit 4&lt;br /&gt;
3:40 pm All AC electric power supply was lost in Unit 5&lt;br /&gt;
3:42 pm It was determined that a specific incident stipulated in article 10,clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (loss of all AC&lt;br /&gt;
electric supply) occurred in Unit １&lt;br /&gt;
※ ※&lt;br /&gt;
，２&lt;br /&gt;
※ ※&lt;br /&gt;
，３&lt;br /&gt;
※ ※&lt;br /&gt;
，４&lt;br /&gt;
※ ※&lt;br /&gt;
and ５&lt;br /&gt;
※ ※&lt;br /&gt;
and it was reported&lt;br /&gt;
to the government offices etc.&lt;br /&gt;
Page 48 Page 48&lt;br /&gt;
※ On April 24&lt;br /&gt;
th th&lt;br /&gt;
, it was corrected to Unit 1, 2 and 3.&lt;br /&gt;
3:42 pm 1st emergency attitude was announced. Contingency Planning Center was&lt;br /&gt;
established&lt;br /&gt;
(Later, incorporated with Emergency center)&lt;br /&gt;
4:36 pm 2nd emergency attitude was announced&lt;br /&gt;
8:50 pm Fukushima prefecture ordered the residents within 2km radius of the periphery of&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station to evacuate&lt;br /&gt;
9:23 pm Prime Minister ordered the residents within 3km radius of the periphery of&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station to evacuate, and the residents within&lt;br /&gt;
3km to 10km radius of the periphery to evacuate indoors&lt;br /&gt;
Saturday, March 12, 2011&lt;br /&gt;
12:30 am Government confirmed the completion of evacuation of the residents (3km&lt;br /&gt;
radius of the periphery of Fukushima Daiichi Nuclear Power Station in&lt;br /&gt;
Futaba Town and Okuma Town, reconfirmed at 1:45 am)&lt;br /&gt;
4:55 am Increase of the radiation dose was confirmed and it was informed to the&lt;br /&gt;
government offices etc.&lt;br /&gt;
5:44 am Prime Minister ordered the residents 10km radius of the periphery of Fukushima&lt;br /&gt;
Daiichi Nuclear Power Station.&lt;br /&gt;
6:06 am Pressure in reactor pressure vessel was reduced by opening a valve on the&lt;br /&gt;
top in Unit 5.&lt;br /&gt;
7:11 am Prime Minister arrived at Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
8:04 am Prime Minister departed from Fukushima Daiichi Nuclear Power Station&lt;br /&gt;
8:13 am Power became available from DG in Unit 5 and 6&lt;br /&gt;
4:27 pm As the radiation dose exceeded 500μSv/h (1,015μSv/h) at the monitoring post, it&lt;br /&gt;
was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (Extraordinary&lt;br /&gt;
increase in radiation dose at the border of the site) occurred and it was reported&lt;br /&gt;
to the government offices etc.&lt;br /&gt;
6:25 pm Prime Minister ordered the residents 20km radius of the periphery of Fukushima&lt;br /&gt;
Daiichi Nuclear Power Station to evacuate.&lt;br /&gt;
Page 49 Page 49&lt;br /&gt;
Sunday, March 13, 2011&lt;br /&gt;
8:56 am As the radiation dose exceeded 500μSv/h (882μSv/h) at the monitoring post, it&lt;br /&gt;
was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (Extraordinary&lt;br /&gt;
increase in radiation dose at the border of the site) occurred and it was reported&lt;br /&gt;
to the government offices etc. at 9:01 am.&lt;br /&gt;
11:00 am Prime Minister ordered the residents 20km to 30km radius of the periphery of&lt;br /&gt;
Fukushima Daiichi Nuclear Power Station to evacuate.&lt;br /&gt;
1:20 pm Water injection by condenser pump powered by DG was initiated in Unit6&lt;br /&gt;
(continued intermittently)&lt;br /&gt;
2:15 pm As the radiation dose exceeded 500μSv/h (905μSv/h) at the monitoring post, it&lt;br /&gt;
was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (Extraordinary&lt;br /&gt;
increase in radiation dose at the border of the site) occurred and it was reported&lt;br /&gt;
to the government offices etc. at 2:23 pm.&lt;br /&gt;
6:29 pm Water injection by condenser pump powered by DG was initiated in Unit5&lt;br /&gt;
(continued intermittently)&lt;br /&gt;
Monday, March 14, 2011&lt;br /&gt;
2:20 am As the radiation dose exceeded 500μSv/h (751μSv/h) around the main gate, it&lt;br /&gt;
was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (Extraordinary&lt;br /&gt;
increase in radiation dose at the border of the site) occurred and it was reported&lt;br /&gt;
to the government offices etc. at 4:24 am.&lt;br /&gt;
2:40 am As the radiation dose exceeded 500μSv/h (650μSv/h) at the monitoring post, it&lt;br /&gt;
was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (Extraordinary&lt;br /&gt;
increase in radiation dose at the border of the site) occurred and it was reported&lt;br /&gt;
to the government offices etc. at 5:37 am.&lt;br /&gt;
4:00 am As the radiation dose exceeded 500μSv/h (820μSv/h) at the monitoring post, it&lt;br /&gt;
was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (Extraordinary&lt;br /&gt;
increase in radiation dose at the border of the site) occurred and it was reported&lt;br /&gt;
to the government offices etc. at 8:00 am.&lt;br /&gt;
4:08 am Temperature in spent fuel pool of Unit 4 was confirmed to be ８４℃&lt;br /&gt;
9:12 am As the radiation dose exceeded 500μSv/h (518.7μSv/h) at the monitoring post, it&lt;br /&gt;
Page 50 Page 50&lt;br /&gt;
was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (Extraordinary&lt;br /&gt;
increase in radiation dose at the border of the site) occurred and it was reported&lt;br /&gt;
to the government offices etc. at 9:34 am.&lt;br /&gt;
9:35 pm As the radiation dose exceeded 500μSv/h (760μSv/h) when measured by the&lt;br /&gt;
monitoring car, it was determined that a specific incident stipulated in article 15,&lt;br /&gt;
clause 1 of Act on Special Measures Concerning Nuclear Emergency&lt;br /&gt;
Preparedness (Extraordinary increase in radiation dose at the border of the site)&lt;br /&gt;
occurred and it was reported to the government offices etc. at 10:35 pm.&lt;br /&gt;
Tuesday, March 15, 2011&lt;br /&gt;
Approx.6:00?6:10 am&lt;br /&gt;
Explosive sound was confirmed. Later, damage to the roof of reactor building&#39;s&lt;br /&gt;
5 Five&lt;br /&gt;
th th&lt;br /&gt;
floor in Unit 4 was confirmed&lt;br /&gt;
6:50 am As the radiation dose exceeded 500μSv/h (583.7μSv/h) around the main gate, it&lt;br /&gt;
was determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (Extraordinary&lt;br /&gt;
increase in radiation dose at the border of the site) occurred and it was reported&lt;br /&gt;
to the government offices etc. at 7:00 am.&lt;br /&gt;
7:55 am Damage to the roof of reactor building&#39;s 5&lt;br /&gt;
th th&lt;br /&gt;
floor in Unit 4 was reported to&lt;br /&gt;
government&#39;s offices etc.&lt;br /&gt;
8:11 am Damage to reactor building in Unit 4 was confirmed. Also, as the radiation dose&lt;br /&gt;
exceeded 500μSv/h (807μSv/h) around the main gate, it was determined that a&lt;br /&gt;
specific incident stipulated in article 15, clause 1 of Act on Special Measures&lt;br /&gt;
Concerning Nuclear Emergency Preparedness (Extraordinary release of&lt;br /&gt;
radiation materials caused by fire explosion) occurred and it was reported to the&lt;br /&gt;
government offices etc. at 8:36 am.&lt;br /&gt;
9:38 am Fire was confirmed around north west part of 3&lt;br /&gt;
rd rd&lt;br /&gt;
floor in reactor building of Unit 4.&lt;br /&gt;
It was reported to the government offices etc. at 9:38 am.&lt;br /&gt;
Approx. 11:00 am&lt;br /&gt;
TEPCO staff confirmed that the fire at reactor building of Unit 4 was off. It was&lt;br /&gt;
reported to government offices etc. at 11:45 am.&lt;br /&gt;
4:00 pm As the radiation dose exceeded 500μSv/h (531.6μSv/h) at the main gate, it was&lt;br /&gt;
determined that a specific incident stipulated in article 15, clause 1 of Act on&lt;br /&gt;
Special Measures Concerning Nuclear Emergency Preparedness (Extraordinary&lt;br /&gt;
increase in radiation dose at the border of the site) occurred and it was reported&lt;br /&gt;
Page 51 Page 51&lt;br /&gt;
to the government offices etc. at 4:22 pm.&lt;br /&gt;
11:05 pm As the radiation dose exceeded 500μSv/h (4548μSv/h) around the main gate, it&lt;br /&gt;
was determined that a specific incident stipulated in article 15, clause 1 of Act&lt;br /&gt;
on Special Measures Concerning Nuclear Emergency Preparedness&lt;br /&gt;
(Extraordinary increase in radiation dose at the border of the site) occurred&lt;br /&gt;
and it was reported to the government offices etc. at 11:20 pm.&lt;br /&gt;
End End&lt;br /&gt;
Original Japanese text:&lt;br /&gt;
cell phone) was utilized to order evacuation for field workers. Shift operators&lt;br /&gt;
Contribute a better translation</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/5116348670506976635/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/06/first-response-in-fukushima-daiichi.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/5116348670506976635'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/5116348670506976635'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/06/first-response-in-fukushima-daiichi.html' title='First Response in Fukushima Daiichi Nuclear Power Station'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-5015349484524271447</id><published>2011-05-15T18:02:00.000+09:00</published><updated>2011-05-15T18:02:56.085+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="浜岡 原発 海水"/><title type='text'>もう完全に異様 日本の原発 浜岡原発 海水流入</title><content type='html'>もう完全に異様である 浜岡原発 海水流入&lt;br /&gt;
もう完全に異様　日本の原発　浜岡５号機で 海水流入&lt;br /&gt;
もう完全に異様である。普通に止めることさえ出来ない有様とは・・いったいなんなん？&lt;br /&gt;
浜岡原発５号機に海水混入か 外部に放射能漏れ「なし」&lt;br /&gt;
&amp;#8206;朝日新聞 &lt;br /&gt;
中部電力は１５日、運転を止めた浜岡原子力発電所（静岡県御前崎市）５号機（１３８万キロワット）の冷却作業中、原子炉を冷やす水に海水が混じった可能性があると発表した。放射性物質の外部への漏出はないといい、別のルートで冷却を続けた&lt;br /&gt;
停止中の浜岡５号機でトラブル 海水流入、外部に影響なし&lt;br /&gt;
&amp;#8206;47NEWS&lt;br /&gt;
浜岡原発 冷却作業中にトラブル NHK &lt;br /&gt;
１４日、５基すべての運転が停止した、静岡県御前崎市にある浜岡原子力発電所で、５号機の原子炉を冷やすために循環させている冷却水に海水が混じったとみられるトラブルが発生していた&lt;br /&gt;
&lt;br /&gt;
&lt;!-- Google News Element Code --&gt;&lt;br /&gt;
&lt;iframe frameborder=0 marginwidth=0 marginheight=0 border=0 style=&quot;border:0;margin:0;width:300px;height:250px;&quot; src=&quot;http://www.google.com/uds/modules/elements/newsshow/iframe.html?rsz=large&amp;format=300x250&amp;q=%E6%B5%9C%E5%B2%A1%E5%8E%9F%E7%99%BA%E3%80%80%E6%B5%B7%E6%B0%B4&amp;element=true&quot; scrolling=&quot;no&quot; allowtransparency=&quot;true&quot;&gt;&lt;/iframe&gt;&lt;br /&gt;
浜岡原発 海水流入</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/5015349484524271447/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/05/blog-post_15.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/5015349484524271447'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/5015349484524271447'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/05/blog-post_15.html' title='もう完全に異様 日本の原発 浜岡原発 海水流入'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-1585388941366888433</id><published>2011-05-06T19:23:00.000+09:00</published><updated>2011-05-06T19:23:19.505+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="浜岡原発 停止要請 菅直人"/><title type='text'>浜岡原発 すべてを停止要請 菅直人</title><content type='html'>浜岡原発 すべてを停止要請 菅直人&lt;br /&gt;
浜岡原発 運転中の４号機５号機 停止要請 菅直人 NHK&lt;br /&gt;
浜岡原子力発電所３号機、運転の再開を当面見送る方針&lt;br /&gt;
菅総理と海江田経済産業大臣が会談して決めた　TBS系&lt;br /&gt;
&lt;!-- Google News Element Code --&gt;&lt;br /&gt;
&lt;iframe frameborder=0 marginwidth=0 marginheight=0 border=0 style=&quot;border:0;margin:0;width:300px;height:250px;&quot; src=&quot;http://www.google.com/uds/modules/elements/newsshow/iframe.html?rsz=large&amp;format=300x250&amp;q=%E6%B5%9C%E5%B2%A1%E5%8E%9F%E7%99%BA&amp;element=true&quot; scrolling=&quot;no&quot; allowtransparency=&quot;true&quot;&gt;&lt;/iframe&gt;&lt;br /&gt;
&lt;br /&gt;
5/2　参院予算委員会では&lt;br /&gt;
浜岡原発30年以内巨大地震87%でも 菅直人とめる気なし だった&lt;br /&gt;
&lt;object width=&quot;420&quot; height=&quot;269&quot;&gt;&lt;param name=&quot;movie&quot; value=&quot;http://www.youtube.com/v/ogmcj5AcNJQ?fs=1&amp;amp;hl=en_US&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowFullScreen&quot; value=&quot;true&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowscriptaccess&quot; value=&quot;always&quot;&gt;&lt;/param&gt;&lt;embed src=&quot;http://www.youtube.com/v/ogmcj5AcNJQ?fs=1&amp;amp;hl=en_US&quot; type=&quot;application/x-shockwave-flash&quot; width=&quot;420&quot; height=&quot;269&quot; allowscriptaccess=&quot;always&quot; allowfullscreen=&quot;true&quot;&gt;&lt;/embed&gt;&lt;/object&gt;&lt;br /&gt;
浜岡原発 停止要請 菅直人</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/1585388941366888433/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/05/blog-post_06.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/1585388941366888433'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/1585388941366888433'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/05/blog-post_06.html' title='浜岡原発 すべてを停止要請 菅直人'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-9138768162199557282</id><published>2011-05-02T22:56:00.000+09:00</published><updated>2011-05-02T22:56:52.936+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="勘坂康弘　社長  ユッケ 生食　食中毒フーズ・フォーラス　えびす"/><title type='text'>ユッケ食中毒 勘坂康弘 逆切れ会見</title><content type='html'>ユッケ食中毒 勘坂康弘 逆切れ会見&lt;br /&gt;
勘坂康弘 社長&lt;br /&gt;
ユッケ食中毒 逆切れ会見 「生食用 ...&lt;br /&gt;
焼き肉チェーン「焼肉酒家えびす」フーズ・フォーラス社&lt;br /&gt;
真摯にお詫び申し上げまぁっす ぶひぶひ&lt;br /&gt;
&lt;object width=&quot;420&quot; height=&quot;269&quot;&gt;&lt;param name=&quot;movie&quot; value=&quot;http://www.youtube.com/v/A_WROavOsiY?fs=1&amp;hl=en_US&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowFullScreen&quot; value=&quot;true&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowscriptaccess&quot; value=&quot;always&quot;&gt;&lt;/param&gt;&lt;embed src=&quot;http://www.youtube.com/v/A_WROavOsiY?fs=1&amp;hl=en_US&quot; type=&quot;application/x-shockwave-flash&quot; width=&quot;420&quot; height=&quot;269&quot; allowscriptaccess=&quot;always&quot; allowfullscreen=&quot;true&quot;&gt;&lt;/embed&gt;&lt;/object&gt;&lt;br /&gt;
勘坂康弘　社長  ユッケ 生食　食中毒フーズ・フォーラス　えびす</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/9138768162199557282/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/05/blog-post.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/9138768162199557282'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/9138768162199557282'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/05/blog-post.html' title='ユッケ食中毒 勘坂康弘 逆切れ会見'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-6017620634838465131</id><published>2011-05-02T12:26:00.000+09:00</published><updated>2011-05-02T12:26:03.403+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="ンラディン死亡 ビンラディン 死 Osama bin Laden death dead"/><title type='text'>ビンラディン死亡　Osama bin Laden is dead</title><content type='html'>ビンラディン　死亡&lt;br /&gt;
Osama bin Laden is dead&lt;br /&gt;
&lt;!-- Google News Element Code --&gt;&lt;br /&gt;
&lt;iframe frameborder=0 marginwidth=0 marginheight=0 border=0 style=&quot;border:0;margin:0;width:300px;height:250px;&quot; src=&quot;http://www.google.com/uds/modules/elements/newsshow/iframe.html?rsz=large&amp;format=300x250&amp;q=Osama%20Laden%20dead&amp;element=true&quot; scrolling=&quot;no&quot; allowtransparency=&quot;true&quot;&gt;&lt;/iframe&gt;&lt;br /&gt;
&lt;br /&gt;
ウサマ・ビンラディン　死亡 と米ＣＮＮ‎&lt;br /&gt;
死亡し、遺体収容と　報じるが　詳細は不明&lt;br /&gt;
&lt;!-- Google News Element Code --&gt;&lt;br /&gt;
&lt;iframe frameborder=0 marginwidth=0 marginheight=0 border=0 style=&quot;border:0;margin:0;width:300px;height:250px;&quot; src=&quot;http://www.google.com/uds/modules/elements/newsshow/iframe.html?rsz=large&amp;format=300x250&amp;q=%E3%83%93%E3%83%B3%E3%83%A9%E3%83%87%E3%82%A3%E3%83%B3%20%E6%AD%BB&amp;element=true&quot; scrolling=&quot;no&quot; allowtransparency=&quot;true&quot;&gt;&lt;/iframe&gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
President Obama will address the nation on a national security issue at 10:30 p.m. Eastern time Sunday, the White House said.&lt;br /&gt;
&lt;br /&gt;
ビンラディン死亡 ビンラディン 死 Osama bin Laden death dead</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/6017620634838465131/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/05/osama-bin-laden-is-dead.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/6017620634838465131'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/6017620634838465131'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/05/osama-bin-laden-is-dead.html' title='ビンラディン死亡　Osama bin Laden is dead'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-2127302286896978045</id><published>2011-04-17T18:03:00.000+09:00</published><updated>2011-04-17T18:03:30.584+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="4/17 動画 東電 会長 勝俣会長 会見 記者会見 勝俣恒久 福島原発 記者クラブ"/><title type='text'>4/17 勝俣会長 終息の目処なし ここにいる&quot;拝金&quot;記者クラブ連中も同罪ですけどね</title><content type='html'>4/17 勝俣会長 終息の目処なし ここの&quot;拝金&quot;記者クラブ連中も同罪ですけどね&lt;br /&gt;
4/17 勝俣会長 終息の見通しないのは　金で言うこと聞く記者クラブもご存知ですが　何か？&lt;br /&gt;
4/17勝俣恒久会長 記者会見、福島第１原発事故の収束に向けた道筋、&lt;br /&gt;
という名の見通しは　一切立たない現状の会見&lt;br /&gt;
&lt;br /&gt;
&lt;object width=&quot;360&quot; height=&quot;228&quot; classid=&quot;clsid:d27cdb6e-ae6d-11cf-96b8-444553540000&quot;&gt;   &lt;param name=&quot;flashvars&quot; value=&quot;vid=14087403&amp;amp;autoplay=false&amp;amp;style=ubCC2550:lcE87A9F:ocffffff:ucffffff&amp;amp;locale=ja_JP&quot;/&gt;&lt;param name=&quot;allowfullscreen&quot; value=&quot;true&quot;/&gt;&lt;param name=&quot;allowscriptaccess&quot; value=&quot;always&quot;/&gt;&lt;param name=&quot;src&quot; value=&quot;http://www.ustream.tv/flash/viewer.swf&quot;/&gt;&lt;embed flashvars=&quot;vid=14087403&amp;amp;autoplay=false&amp;amp;style=ubCC2550:lcE87A9F:ocffffff:ucffffff&amp;amp;locale=ja_JP&quot; width=&quot;360&quot; height=&quot;228&quot; allowfullscreen=&quot;true&quot; allowscriptaccess=&quot;always&quot; src=&quot;http://www.ustream.tv/flash/viewer.swf&quot; type=&quot;application/x-shockwave-flash&quot;&gt;&lt;/embed&gt; &lt;/object&gt;&lt;br /&gt;
動画 東電 会長 勝俣会長 会見 記者会見 勝俣恒久 福島原発</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/2127302286896978045/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/417.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/2127302286896978045'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/2127302286896978045'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/417.html' title='4/17 勝俣会長 終息の目処なし ここにいる&quot;拝金&quot;記者クラブ連中も同罪ですけどね'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-6431017909676538800</id><published>2011-04-13T15:08:00.001+09:00</published><updated>2011-04-13T15:08:02.304+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="動画 班目 班目春樹 寺坂信昭 原子力"/><title type='text'>保安院 寺坂信昭 と 安全委員会 班目春樹</title><content type='html'>寺坂信昭 経産省原子力安全・保安院 院長&lt;br /&gt;
班目春樹 原子力安全委員会 委員長&lt;br /&gt;
4/13　経済産業委員会&lt;br /&gt;
寺坂信昭 経産省原子力安全・保安院 院長&lt;br /&gt;
&lt;object width=&quot;425&quot; height=&quot;349&quot;&gt;&lt;param name=&quot;movie&quot; value=&quot;http://www.youtube.com/v/psyKS-VgD7E?fs=1&amp;amp;hl=en_US&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowFullScreen&quot; value=&quot;true&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowscriptaccess&quot; value=&quot;always&quot;&gt;&lt;/param&gt;&lt;embed src=&quot;http://www.youtube.com/v/psyKS-VgD7E?fs=1&amp;amp;hl=en_US&quot; type=&quot;application/x-shockwave-flash&quot; allowscriptaccess=&quot;always&quot; allowfullscreen=&quot;true&quot; width=&quot;425&quot; height=&quot;349&quot;&gt;&lt;/embed&gt;&lt;/object&gt;&lt;br /&gt;
班目春樹 原子力安全委員会 委員長&lt;br /&gt;
&lt;object width=&quot;425&quot; height=&quot;349&quot;&gt;&lt;param name=&quot;movie&quot; value=&quot;http://www.youtube.com/v/84v9FbJieow?fs=1&amp;amp;hl=en_US&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowFullScreen&quot; value=&quot;true&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowscriptaccess&quot; value=&quot;always&quot;&gt;&lt;/param&gt;&lt;embed src=&quot;http://www.youtube.com/v/84v9FbJieow?fs=1&amp;amp;hl=en_US&quot; type=&quot;application/x-shockwave-flash&quot; allowscriptaccess=&quot;always&quot; allowfullscreen=&quot;true&quot; width=&quot;425&quot; height=&quot;349&quot;&gt;&lt;/embed&gt;&lt;/object&gt;</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/6431017909676538800/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_13.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/6431017909676538800'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/6431017909676538800'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_13.html' title='保安院 寺坂信昭 と 安全委員会 班目春樹'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-6952754274103296547</id><published>2011-04-13T14:51:00.001+09:00</published><updated>2011-04-13T14:51:05.024+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="東電　社長　清水正孝 記者会見 動画"/><title type='text'>清水正孝 記者会見 4/13 15:00～Ustream/ニコ生</title><content type='html'>東京電力本店清水正孝社長 記者会見4/13 15:00～ &lt;br /&gt;
本店での会見は３月１３日以来１カ月ぶり&lt;br /&gt;
Ustream　岩上安身&lt;br /&gt;
&lt;a href=&quot;http://www.ustream.tv/channel/iwakamiyasumi&quot;&gt;http://www.ustream.tv/channel/iwakamiyasumi&lt;/a&gt;&lt;br /&gt;
ニコ生&lt;br /&gt;
&lt;a href=&quot;http://live.nicovideo.jp/watch/lv46437375&quot;&gt;http://live.nicovideo.jp/watch/lv46437375&lt;/a&gt;</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/6952754274103296547/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/413-1500ustream.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/6952754274103296547'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/6952754274103296547'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/413-1500ustream.html' title='清水正孝 記者会見 4/13 15:00～Ustream/ニコ生'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-8472027187759431976</id><published>2011-04-12T16:20:00.001+09:00</published><updated>2011-04-12T16:20:55.915+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="レベル7"/><title type='text'>レベル7でも　なおも原子力ロビー万歳　テレビ大手メディア</title><content type='html'>レベル7でも　なおも原子力ロビー万歳　テレビ大手メディア&lt;br /&gt;
「壊れないことになっていますから」&lt;br /&gt;
「壊れたのは」&quot;想定不適当&quot;事故にもなりませんから　あれれ　日本人の無責任　万歳&lt;br /&gt;
日本の保守思想とは、なんだただの原子力万歳のことでした　お笑いだ&lt;br /&gt;
日本の保守思想とは、なんのことない原子力(ロビー)のことだとよく判った一ヶ月でした　お笑いだ&lt;br /&gt;
経団連・米倉会長：「東電が甘いとかそういうことではなく、国が設定する安全基準が甘かった。何で経済産業省に原子力安全・保安院というものがあるんですか」&quot;&lt;br /&gt;
http://news.tv-asahi.co.jp/ann/news/web/html/210411048.html&lt;br /&gt;
保安院“及ばなかった点反省”　NHK&lt;br /&gt;
保安院の西山審議官「緊急事態が続いたこともあり、対応で私たちの及ばないところがあった。反省し、冷却機能の復旧と国民の安全を守ることの両立ができるようにしたい」&lt;br /&gt;
http://www3.nhk.or.jp/news/html/20110411/k10015233391000.html&lt;br /&gt;
&lt;br /&gt;
原子力ロビー万歳&lt;br /&gt;
ＩＡＥＡの天野之弥　見事に東電のスポークスマン役　原子力ロビー万歳ぶり&lt;br /&gt;
天野之弥　NHKニュースウオッチ9　4/11で　原発推進PR&lt;br /&gt;
&quot;人災&quot;指摘されても　それは「後知恵」と一蹴の　官僚特質の傲慢さを遺憾なく発揮(笑)&lt;br /&gt;
&lt;br /&gt;
現在の法体系では、原発由来の放射能による環境汚染は全て環境省は適用除外。&lt;br /&gt;
全部経産省しか担当できない。河野太郎:Twitter&lt;br /&gt;
http://twitter.com/konotarogomame/statuses/57604822320414720</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/8472027187759431976/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/7.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/8472027187759431976'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/8472027187759431976'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/7.html' title='レベル7でも　なおも原子力ロビー万歳　テレビ大手メディア'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-80540629064115892</id><published>2011-04-12T06:15:00.000+09:00</published><updated>2011-04-12T21:54:36.855+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="レベル7 福島原発 チェルノブイリ 保安院 メルトダウン"/><title type='text'>レベル7　保安院　一ト月かかり安全デマをようやく訂正　それでも核燃料の総量はチェルノブイリの10倍ある</title><content type='html'>レベル7　チェルノブイリと同じレベル　保安院　一ト月かかり安全デマをようやく訂正&lt;br /&gt;福島原発 使用済み核燃料の総量:チェルノブイリの10倍&lt;br /&gt;The Daiichi complex had a total of 1760 metric tons of fresh and used nuclear fuel on site last year.&lt;br /&gt;Three Mile Island in 1979 was about 30 tons; &lt;br /&gt;the Chernobyl reactors had about 180 tons when the accident occurred in 1986.&lt;br /&gt;ご存知サイエンス誌&lt;br /&gt;http://news.sciencemag.org/scienceinsider/2011/03/how-much-fuel-is-at-risk-at-fukushima.html&lt;br /&gt;&lt;img border=&quot;0&quot; height=&quot;313&quot; width=&quot;400&quot; src=&quot;https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEh-P2vluP6PF1v3Ve0NQGVxRBOa2xAus4Ffh12ycYOXW-So125M-5T5nchCPEgUbfTVeZnTT8DczMgQ4WZxwO2PaA58YvTPvRGF0To305vVuYbv_W1rHSV1zz7Y-1Qit1XxM84EKbsTc3cZ/s400/%25E4%25BD%25BF%25E7%2594%25A8%25E6%25B8%2588%25E3%2581%25BF%25E6%25A0%25B8%25E7%2587%2583.jpg&quot; /&gt;&lt;br /&gt;東電作成資料　11/16/2010&lt;br /&gt;http://www.nirs.org/reactorwatch/accidents/6-1_powerpoint.pdf&lt;br /&gt;&lt;br /&gt;レベル7 福島原発 チェルノブイリ 保安院 メルトダウン</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/80540629064115892/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/710.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/80540629064115892'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/80540629064115892'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/710.html' title='レベル7　保安院　一ト月かかり安全デマをようやく訂正　それでも核燃料の総量はチェルノブイリの10倍ある'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><media:thumbnail xmlns:media="http://search.yahoo.com/mrss/" url="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEh-P2vluP6PF1v3Ve0NQGVxRBOa2xAus4Ffh12ycYOXW-So125M-5T5nchCPEgUbfTVeZnTT8DczMgQ4WZxwO2PaA58YvTPvRGF0To305vVuYbv_W1rHSV1zz7Y-1Qit1XxM84EKbsTc3cZ/s72-c/%25E4%25BD%25BF%25E7%2594%25A8%25E6%25B8%2588%25E3%2581%25BF%25E6%25A0%25B8%25E7%2587%2583.jpg" height="72" width="72"/><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-2320454901462603504</id><published>2011-04-12T06:02:00.000+09:00</published><updated>2011-04-12T21:54:36.856+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="上垣内修　気象庁"/><title type='text'>上垣内修　気象庁地震火山部管理課長　この男</title><content type='html'>上垣内修　気象庁地震火山部管理課長&lt;br /&gt;この男　ついに　のこのこ NHKに出て来た&lt;br /&gt;地震計の針が振り切れたら　これは異常なことが起こってると、&lt;br /&gt;すぐに察知し　対応する能力・実力のある男であったら&lt;br /&gt;はっきり言おう　もっと救えたのだ&lt;br /&gt;津波の警報 システムを改善へ　NHKニュース&lt;br /&gt;先月１１日に起きたマグニチュード９．０の巨大地震で、&lt;br /&gt;気象庁は、当初、マグニチュードを７．９と推計、&lt;br /&gt;津波の高さの予想は、宮城県で６メートル、岩手県と福島県で３メートル。&lt;br /&gt;その後、気象庁は、東北の沖合で観測された津波を参考に、高さの予想を１０メートル以上に切り上げましたが、実態にあった予想が出そろうまでには４０分余りかかり、沿岸ではすでに１０メートル以上の大津波が押し寄せていた。&lt;br /&gt;気象庁地震火山部　上垣内修　管理課長&lt;br /&gt;http://www3.nhk.or.jp/news/html/20110412/t10015248921000.html&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;付録　知見バカの見分け方 &lt;br /&gt;知見　という言葉をすらすら出す者は大概　バカである(笑)&lt;br /&gt;知見バカの壁　日本でしか通用しない能力　多くは文科省から予算をもらってるバカは、みんなバカの一つ覚えで　知見　知見　</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/2320454901462603504/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/2320454901462603504'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/2320454901462603504'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post.html' title='上垣内修　気象庁地震火山部管理課長　この男'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-3561013197267117124</id><published>2011-04-12T00:23:00.000+09:00</published><updated>2011-04-12T21:54:36.858+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="東電 天野之弥 清水正孝 IAEA Yukiya Amano Masataka Shimizu 原子力ロビー"/><title type='text'>ＩＡＥＡの天野之弥　見事に東電のスポークスマン役　原子力ロビー万歳ぶり</title><content type='html'>ＩＡＥＡの天野之弥　見事に東電のスポークスマン役　原子力ロビー万歳ぶり&lt;br /&gt;天野之弥　NHKニュースウオッチ9　4/11のインタビューで&lt;br /&gt;なんとも　原発推進PR&lt;br /&gt;&quot;人災&quot;指摘を「後知恵」と一蹴の　官僚特質の傲慢さを遺憾なく発揮(笑)&lt;br /&gt;原子力ロビー万歳&lt;br /&gt;&lt;br /&gt;IAEA Director Amano, a spokesman for Tokyo Electric,TEPCO.&lt;br /&gt;&lt;br /&gt;BBCでは　天野之弥お前の言っていることは信じられない&lt;br /&gt;日本政府の情報そのまま出してるだけだろが、と殆ど面罵状態だったが、&lt;br /&gt;母国(笑)日本では　原発推進PRまで　しでかしましたとさ(笑)&lt;br /&gt;Concern over Japan nuclear leak &lt;br /&gt;Nik Gowing speaks to Yukiya Amano, Director General of the IAEA about the credibility of information from Tepco and the Japanese government. &lt;br /&gt;&lt;a href=&quot;http://news.bbc.co.uk/2/hi/programmes/the_hub/default.stm&quot;&gt;http://news.bbc.co.uk/2/hi/programmes/the_hub/default.stm&lt;/a&gt;&lt;br /&gt;IAEA Director General´s Corner&lt;br /&gt;&lt;a href=&quot;http://www.iaea.org/About/dg/&quot;&gt;http://www.iaea.org/About/dg/&lt;/a&gt;&lt;br /&gt;IAEA天野之弥 は病気逃亡中の東電社長　清水正孝の後輩(６年制進学校 3年後輩)&lt;br /&gt;TEPCO president Masataka Shimizu is 3 years ahead of Director Amano in college Jesuit-run &quot;Glory of God&quot; High School established by Ex-3rd Reich German Preist.</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/3561013197267117124/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_12.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/3561013197267117124'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/3561013197267117124'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_12.html' title='ＩＡＥＡの天野之弥　見事に東電のスポークスマン役　原子力ロビー万歳ぶり'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-954197312403559117</id><published>2011-04-10T20:04:00.000+09:00</published><updated>2011-04-12T21:54:36.859+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="石原慎太郎　当確　当選　４選"/><title type='text'>石原慎太郎　当確　開票前にNHKが報じる</title><content type='html'>石原慎太郎　当確　開票前にNHKが報じる　やれやれ</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/954197312403559117/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/nhk.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/954197312403559117'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/954197312403559117'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/nhk.html' title='石原慎太郎　当確　開票前にNHKが報じる'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-7958139497358647689</id><published>2011-04-10T11:34:00.000+09:00</published><updated>2011-04-12T21:54:36.861+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="班目春樹 藤家洋一 松浦祥次郎 原子力"/><title type='text'>津波は「想定外」、全電源喪失は「考慮不要」藤家洋一 班目春樹 松浦祥次郎 特A級指定</title><content type='html'>津波は「想定外」、全電源喪失は「考慮不要」&lt;br /&gt;マスコミもなんか記事にするの遅くね？&lt;br /&gt;それとも　ね&lt;br /&gt;１９９０年「発電用軽水型原子炉施設に関する安全設計審査指針」&lt;br /&gt;安全委、「電源喪失は考慮不要」４／６　 47NEWS&lt;br /&gt;全電源喪失、国は「考慮する必要はない」と解説 &lt;br /&gt;読売４／９後追い&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;１９９０年に定めた「発電用軽水型原子炉施設に関する安全設計審査指針」&lt;br /&gt;２７項目目の「電源喪失に対する設計上の考慮」&lt;br /&gt;長期間の電源喪失は「送電線の復旧または非常用交流電源設備の復旧が期待できるので考慮する必要はない」&lt;br /&gt;&lt;br /&gt;原子力委員会委員長（内閣府）&lt;br /&gt;藤家洋一 2001年1月6日 - 2004年1月5日&lt;br /&gt;&lt;br /&gt;原子力安全委員会&lt;br /&gt;松浦祥次郎：2000年4月7日 - 2006年4月16日&lt;br /&gt;班目春樹：2010年4月21日 -&lt;br /&gt;&lt;br /&gt;原子力委員会&lt;br /&gt;新大綱策定会議の議論は当面中断することとしました&lt;br /&gt;http://www.aec.go.jp/&lt;br /&gt;&lt;br /&gt;津波は「想定外」、全電源喪失は「考慮不要」&lt;br /&gt;サンデー・フロントライン　インタビューされた面々&lt;br /&gt;藤家洋一 班目春樹 松浦祥次郎 &lt;br /&gt;全交流電源喪失&lt;br /&gt;長期間にわたる全電源喪失&lt;br /&gt;藤家洋一　考慮する必要はない&lt;br /&gt;班目春樹　わりきり&lt;br /&gt;松浦祥次郎　隕石(直撃)とか　バカかこいつ　津波とは 次元が明らかに違うものを比べる&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;1.原子力安全委員会　&lt;br /&gt;班目春樹 委員長&lt;br /&gt;2.経済産業省原子力安全・保安院　&lt;br /&gt;寺坂信昭 院長&lt;br /&gt;3.原子力委員会　&lt;br /&gt;近藤駿介 委員長&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;３月３１日、東奥日報に、田原総一朗と前原子力委員長藤家洋一の対談が掲載される。&lt;br /&gt;見開き全面広告。タイトルは、「そこが知りたい原子力」　小見出しは、世界は今、なぜ原子力なのか　日本のエネルギー政策は？原子力発電は安全なのか？　なぜ？原子燃料サイクルが必要なのか？という、要するに、安全神話をふりまく、広告です。&lt;br /&gt;東奥日報社に問いあわせてみましたら、見開き２面の全面に、意見広告を掲載する料金は、&lt;br /&gt;￥５，２８０，０００でした。&quot;&lt;br /&gt;核燃・だまっちゃおられん津軽の会ブログ&lt;br /&gt;http://blogs.yahoo.co.jp/damattya/archive/2010/4/9&lt;br /&gt;東電のお詫びCMは20億くらい　twitterの噂&lt;br /&gt;&lt;br /&gt;保安院　海外向け&lt;br /&gt;NISA - Nuclear and Industrial Safety Agency&lt;br /&gt;http://www.nisa.meti.go.jp/english/index.html</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/7958139497358647689/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_10.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/7958139497358647689'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/7958139497358647689'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_10.html' title='津波は「想定外」、全電源喪失は「考慮不要」藤家洋一 班目春樹 松浦祥次郎 特A級指定'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-4032162174474532053</id><published>2011-04-10T00:32:00.000+09:00</published><updated>2011-04-12T21:54:36.864+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="東通原発　パッキン"/><title type='text'>パッキン裏表で、使用済み燃料吹っ飛びかねない原発って　どんだけ安心・安全</title><content type='html'>パッキン取り付けミスか 東通原発、発電機油漏れ- 東京新聞 &lt;br /&gt;東北電力は９日、東通原発１号機（青森県東通村）で非常用ディーゼル発電機の停止につながった油漏れは、ポンプの隙間を埋めるゴム製のパッキンを表裏を逆に取り付けていたことが原因とみられると発表した。東北電はパッキンを新品と交換、同日午前中に復旧した。&lt;br /&gt;東通原発の燃料漏れ、人為ミスか - ‎読売新聞&lt;br /&gt;非常用ディーゼル発電機から燃料が漏れた故障について、東北電力は９日、部品の欠損が原因だったと発表した。 定期点検のときに組み立て方法を間違い&lt;br /&gt;燃料漏れは人為的ミス -日テレ&lt;br /&gt;東通原発の非常用発電機から軽油２００リットルが漏れたトラブルは部品の取り付けミスだったことが分かった。東北電力によると燃料を循環させるポンプの「オイルシール」と呼ばれるパッキンが壊れていたことが原因だった。</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/4032162174474532053/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_2690.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/4032162174474532053'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/4032162174474532053'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_2690.html' title='パッキン裏表で、使用済み燃料吹っ飛びかねない原発って　どんだけ安心・安全'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-4452538740178609535</id><published>2011-04-09T20:28:00.000+09:00</published><updated>2011-04-12T21:54:36.865+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="斉藤紀　わたり病院　NHK"/><title type='text'>懲りないNHK わざとやってるとしか 思えん 説得力のないものを登場させて(嘆き)</title><content type='html'>ＮＨＫスペシャル　東日本大震災１か月　第１部「福島第一原発事故」&lt;br /&gt;わたり病院医師…斉藤紀,  元原子力安全委員会委員長…松浦祥次郎,  【キャスター】鎌田靖&quot;&lt;br /&gt;https://pid.nhk.or.jp/pid04/ProgramIntro/Show.do?pkey=001-20110409-21-34401&lt;br /&gt;NHKスペシャル&lt;br /&gt;http://www.nhk.or.jp/special/&lt;br /&gt;&lt;br /&gt;正確に学ぶ放射線・人体への影響(齋藤紀医師) (福島県民医連（福島県民主医療機関連合会）)&lt;br /&gt;&quot;福島第一原発の事故と放射能の影響について2011年3月21日に医療生協わたり病院の齋藤紀医師が講演を行いました&quot;&lt;br /&gt;http://www.fuku-min.org/fmir/2011/03/post_1.html&lt;br /&gt;火消しのつもりが　火点けになる&lt;br /&gt;説得力のないものを登場させて(嘆き)　 懲りないNHK&lt;br /&gt;プロデューサ　わざとやってるとしか　思えん&lt;br /&gt;終り</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/4452538740178609535/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/nhk_09.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/4452538740178609535'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/4452538740178609535'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/nhk_09.html' title='懲りないNHK わざとやってるとしか 思えん 説得力のないものを登場させて(嘆き)'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-4942903526359120976</id><published>2011-04-09T18:53:00.000+09:00</published><updated>2011-04-12T21:54:36.867+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="非常電源　危機"/><title type='text'>今日は震度5弱　大きな地震が来ると　原発危ない　非常用ディーゼル発電機なし</title><content type='html'>4月9日18時42分　震度5弱　宮城県沖 M5.4&lt;br /&gt;東通原発１号機で、３台ある非常用ディーゼル発電機がすべて使えなくなった問題&lt;br /&gt;各電力会社の現行の保安規定によると、&lt;br /&gt;運転中の原発には非常用ディーゼル発電機２台を、&lt;br /&gt;冷温停止中の原発には１台の確保がそれぞれ義務づけ。&lt;br /&gt;今回の事態を受けて、保安院は冷温停止中であっても２台以上が作動可能となるよう、各社に規定変更を求めた。　非常電源、複数確保を　全原発対象に保安院 - 毎日&lt;br /&gt;http://mainichi.jp/select/weathernews/news/20110409dde001040005000c.html</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/4942903526359120976/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/5.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/4942903526359120976'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/4942903526359120976'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/5.html' title='今日は震度5弱　大きな地震が来ると　原発危ない　非常用ディーゼル発電機なし'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-3207256018663880062</id><published>2011-04-09T16:58:00.000+09:00</published><updated>2011-04-12T21:54:36.868+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="再臨界　大連立"/><title type='text'>再臨界か　大連立か　なおも原子力推進</title><content type='html'>眉唾？　再臨界の疑いが濃厚に　小出裕章:京都大学原子炉実験所助教&lt;br /&gt;「再臨界」は、臨界状態にあった原子炉が一旦停止して核分裂が止まった後、燃料棒の露出などでウラン燃料が溶け出して、圧力容器の下部に蓄積するなどして、制御されない状態で核分裂連鎖反応が起きる状態を指す -インターネット放送局&lt;br /&gt;http://www.videonews.com/news-commentary/0001_3/001814.php&lt;br /&gt;&lt;br /&gt;ゴールデンウィーク前に「大連立」説&lt;br /&gt;4月10日民主党選惨敗 統一地方選第1弾 14の都道県知事選&lt;br /&gt;4月24日統一地方選第2弾 民主党選惨敗&lt;br /&gt;統一地方選惨敗、岡田幹事長退任&lt;br /&gt;ゴールデンウィーク前に「大連立」 &lt;br /&gt;新幹事長---後継有力候補は樽床伸二元政調会長&lt;br /&gt;http://gendai.ismedia.jp/articles/-/2414?page=2&lt;br /&gt;&lt;br /&gt;なおも原子力推進の方々&lt;br /&gt;経団連の米倉&lt;br /&gt;経団連の米倉弘昌&quot;インタビュー&lt;br /&gt;現在、9つほどの原発計画があると思うが、廃止するという必要はない- WSJ.com&lt;br /&gt;http://jp.wsj.com/Japan/Companies/node_217459&lt;br /&gt;経済産業研究所&lt;br /&gt;基準に適合できない一部の原子力発電所を閉鎖・廃炉した上で、従来の「安全確保を大前提とした原子力発電の推進」政策へ回帰することは可能と思われる&lt;br /&gt;http://www.rieti.go.jp/jp/special/special_report/044.html</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/3207256018663880062/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_09.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/3207256018663880062'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/3207256018663880062'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_09.html' title='再臨界か　大連立か　なおも原子力推進'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-5787620283186023538</id><published>2011-04-09T16:56:00.000+09:00</published><updated>2011-04-12T21:54:36.870+09:00</updated><title type='text'></title><content type='html'>眉唾？　再臨界の疑いが濃厚に　小出裕章:京都大学原子炉実験所助教&lt;br /&gt;「再臨界」は、臨界状態にあった原子炉が一旦停止して核分裂が止まった後、燃料棒の露出などでウラン燃料が溶け出して、圧力容器の下部に蓄積するなどして、制御されない状態で核分裂連鎖反応が起きる状態を指す -インターネット放送局&lt;br /&gt;http://www.videonews.com/news-commentary/0001_3/001814.php&lt;br /&gt;&lt;br /&gt;ゴールデンウィーク前に「大連立」説&lt;br /&gt;4月10日民主党選惨敗 統一地方選第1弾 14の都道県知事選&lt;br /&gt;4月24日統一地方選第2弾 民主党選惨敗&lt;br /&gt;統一地方選惨敗、岡田幹事長退任&lt;br /&gt;ゴールデンウィーク前に「大連立」 &lt;br /&gt;新幹事長---後継有力候補は樽床伸二元政調会長&lt;br /&gt;http://gendai.ismedia.jp/articles/-/2414?page=2&lt;br /&gt;&lt;br /&gt;なおも原子力推進の方々&lt;br /&gt;経団連の米倉&lt;br /&gt;経団連の米倉弘昌&quot;インタビュー&lt;br /&gt;現在、9つほどの原発計画があると思うが、廃止するという必要はない- WSJ.com&lt;br /&gt;http://jp.wsj.com/Japan/Companies/node_217459&lt;br /&gt;経済産業研究所&lt;br /&gt;基準に適合できない一部の原子力発電所を閉鎖・廃炉した上で、従来の「安全確保を大前提とした原子力発電の推進」政策へ回帰することは可能と思われる&lt;br /&gt;http://www.rieti.go.jp/jp/special/special_report/044.html</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/5787620283186023538/comments/default' title='コメントの投稿'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/5787620283186023538'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/5787620283186023538'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-1555833990507550639</id><published>2011-04-09T13:18:00.000+09:00</published><updated>2011-04-12T21:54:36.872+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="原子力学会　倫理"/><title type='text'>原子力学会: ご立派な倫理規程と、お恥ずかしい実態　日本らしい(笑)</title><content type='html'>原子力学会倫理規程&lt;br /&gt;2001年9月25日第436回理事会承認/原子力学会倫理規程&lt;br /&gt;守秘義務と情報公開&lt;br /&gt;５－３．会員は，組織の守秘義務に係る情報であっても，公衆の安全のために必要な情報は，これを速やかに公開する。この場合，組織は守秘義務違反を問うてはならない。 &lt;br /&gt;2009年に以下に　変更&lt;br /&gt;守秘義務と情報公開&lt;br /&gt;5-3.会員は、公衆の安全上必要不可欠な情報については、所属する組織にその情報を速やかに公開するように働きかけるとともに、必要やむを得ない場合は、たとえ守秘義務違反に係る情報であってもその情報を開示する等により、公衆の安全の確保を優先させる。 &lt;br /&gt;日本原子力学会倫理委員会-AESJ：02_02 前文・憲章&lt;br /&gt;原子力学会倫理規程&lt;br /&gt;2009年11月26日第505回理事会改訂承認&quot;&lt;br /&gt;http://www.aesj-ethics.org/02_/02_02_/&lt;br /&gt;日本原子力学会倫理委員会-AESJ：02_02 前文・憲章&lt;br /&gt;2.会員は、公衆の安全を全てに優先させてその職務を遂行し、自らの行動を通じて社会の信頼を得るよう努力する。&lt;br /&gt;http://www.aesj-ethics.org/02_/02_02_/&lt;br /&gt;学会運営の基本的考え方&lt;br /&gt;■日本原子力学会の行動指針&lt;br /&gt;今後も不断の自己改革により、常に魅力的な学会であり続けるために、行動指針として、以下のことを定める。&lt;br /&gt;【日本原子力学会の理念、ビジョン】&lt;br /&gt;３． 高い倫理観を持つ会員で構成され、存在感がある学会となる。&lt;br /&gt;http://www.aesj.or.jp/rijikai/shishin.html&lt;br /&gt;日本原子力学会&lt;br /&gt;http://www.aesj.or.jp/</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/1555833990507550639/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_3795.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/1555833990507550639'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/1555833990507550639'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_3795.html' title='原子力学会: ご立派な倫理規程と、お恥ずかしい実態　日本らしい(笑)'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-5523589503029655026</id><published>2011-04-08T21:13:00.000+09:00</published><updated>2011-04-12T21:54:36.874+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="東通原発"/><title type='text'>東通原発も　危なすぎ　今　また地震で停電したら、終りじゃんか</title><content type='html'>東北電力東通原子力発電所では、７日夜の地震のあと、２系統ある外部電源が停電ですべて使えなくなりました。定期検査中で運転していなかったため、問題になるのは、燃料プールに保管されている核燃料の冷却でしたが、非常用の発電機が想定どおり働いて冷却機能が維持され、大きな問題には至りませんでした。&lt;br /&gt;ただ、外部電源が復旧したあとの８日午後２時前、非常用の発電機に油漏れが見つかって、３台の発電機すべてが使えない状態になり、結果的に外部電源のみという状態になりました　NHK&lt;br /&gt;http://www3.nhk.or.jp/news/html/20110408/t10015191221000.html</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/5523589503029655026/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_08.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/5523589503029655026'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/5523589503029655026'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_08.html' title='東通原発も　危なすぎ　今　また地震で停電したら、終りじゃんか'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-5520595474413668540</id><published>2011-04-08T18:25:00.000+09:00</published><updated>2011-04-12T21:54:36.876+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="田原総一朗　原発　朝まで"/><title type='text'>田原総一朗　ついに朝まで東電の提灯持ち告白(爆)　さっさと去りな</title><content type='html'>田原総一朗　ずっと、東電の提灯持ち告白(爆)&lt;br /&gt;田原総一朗　ブログ&lt;br /&gt;僕は、東電にも政府にも、炉心溶融は起きていないのかと何度も聞いたが、&lt;br /&gt;起きてないと、答えていた。ところが実は起きてる事が判明した。僕自身も甘かったと思う。&lt;br /&gt;http://www.taharasoichiro.com/cms/　&lt;br /&gt;老い耄れ　ただの老害爺　さっさと去りな</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/5520595474413668540/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_8066.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/5520595474413668540'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/5520595474413668540'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_8066.html' title='田原総一朗　ついに朝まで東電の提灯持ち告白(爆)　さっさと去りな'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-1132663205105206749</id><published>2011-04-08T09:26:00.000+09:00</published><updated>2011-04-12T21:54:36.878+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="山崎淑行　関村直人　安全デマ"/><title type='text'>山崎淑行 安全デマオなんと１号機は(津波前に)地震で異常を起こした説をご披露 おっとォ</title><content type='html'>山崎淑行 福島原発１号機は(津波前に)地震で異常を起こした説をご披露 おっとォ&lt;br /&gt;NHK報道局・科学文化部記者 山崎淑行&lt;br /&gt;安全デマオ　逆方向に大きく　踏み込んだねぇ3/8 7pm　パチパチ&lt;br /&gt;でも真偽は知らないけども・・・デマで削除されちゃうから　知～らない(笑)&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;ちなみに、NHKが「原子力に詳しい」とキャプションつける関村直人は&lt;br /&gt;そもそも(笑)&lt;br /&gt;福島原発1号機の運転延長の安全委員会　主査(責任者)　ご本人 ほぉ&lt;br /&gt;こりゃ　安全デマ　垂れ流し続けたわけさぁ&lt;br /&gt;原子力安全委員会-会議資料&lt;br /&gt;http://www.nsc.go.jp/anzen/shidai/&lt;br /&gt;第８回原子力安全委員会　資料第５号&lt;br /&gt;平成２３年２月７日　経済産業省原子力安全・保安院&lt;br /&gt;東京電力株式会社福島第一原子力発電所１号炉の経年劣化に関する技術&lt;br /&gt;的な評価の結果及び長期保守管理方針に係る審査の結果&lt;br /&gt;（核原料物質、核燃料物質及び原子炉の規制に関する法律第７２条の３第２項に基づく立入検査の結果報告を含む。）について、別添のとおり報告します。&lt;br /&gt;第８回原子力安全委員会&lt;br /&gt;高経年化技術評価ＷＧ 委員&lt;br /&gt;主査&lt;br /&gt;関村直人（せきむら・なおと） 東京大学大学院工学系研究科副研究科長&lt;br /&gt;原子力国際専攻教授&lt;br /&gt;http://www.nsc.go.jp/anzen/shidai/genan2011/genan008/siryo5.pdf&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;■間一髪セーフ　非常用ディーゼル発電無事動く&lt;br /&gt;4月7日23時32分&lt;br /&gt;地震列島　危なすぎ　今回は震源地　宮城県沖　震度6強　M7.4　&lt;br /&gt;気象庁　当てにならず　余震として注意促してたのは5弱だった　&lt;br /&gt;地震予知能力　もちろんゼロ　地震列島もう　危なすぎ&lt;br /&gt;東北電力、広い範囲で停電中&lt;br /&gt;宮城・女川原発:外部電源５回線のうち３回線が遮断し、１回線が点検中、残り１回線で冷却機能を維持&lt;br /&gt;東通原発:すべての燃料は使用済み燃料プールで保管　&lt;br /&gt;１号機外部電源が遮断、非常用のディーゼル発電機で給電&lt;br /&gt;東北電力:「軽油タンク」の非常用ディーゼル発電機　容量1週間ある&lt;br /&gt;&lt;br /&gt;六ヶ所村の核燃料再処理工場(日本原燃):外部電源が遮断、非常用ディーゼル発電機で給電&lt;br /&gt;&lt;br /&gt;&lt;br /&gt;福島第一原発「異常なし」って　とっくに壊滅ですからぁ&lt;br /&gt;&lt;br /&gt;山崎淑行　関村直人</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/1132663205105206749/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_1340.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/1132663205105206749'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/1132663205105206749'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_1340.html' title='山崎淑行 安全デマオなんと１号機は(津波前に)地震で異常を起こした説をご披露 おっとォ'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-6577033990166091974</id><published>2011-04-08T08:06:00.000+09:00</published><updated>2011-04-12T21:54:36.881+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="斉藤和義 ずっとウソ"/><title type='text'>斉藤和義 ずっとウソだったんだぜ　歌っていい気分(笑)　で？何か？</title><content type='html'>知人が漏洩だとか&lt;br /&gt;http://www.youtube.com/watch?v=FZ2-vE6PqAg&lt;br /&gt;ビクターさんがまた消します(笑)が&lt;br /&gt;で&lt;br /&gt;核意識の高い流行り歌さん&lt;br /&gt;「ずっとウソだった」の　なんて40年前に知ってますけど&lt;br /&gt;事後　いい気になって歌ってる　ことが低レベル&lt;br /&gt;あんたの両親・友達が　ただノン・ポリだっただけ　じゃね&lt;br /&gt;反核の両親のもとに　生まれれば　&lt;h1&gt;幼稚園から知ってるぜ(爆)&lt;/h1&gt;&lt;br /&gt;&lt;br /&gt;反核の悲しさは、&lt;br /&gt;♪「事故を止められなかったこと」　なんだぜ&lt;br /&gt;♪&lt;h1&gt;力およばず慙愧の念&lt;/h1&gt;なんだぜ&lt;br /&gt;議席数もなく、質疑たった5分なんだぜ　別に支持しちゃいないけど、以下、どうぞ&lt;br /&gt;　&lt;br /&gt;&lt;object width=&quot;320&quot; height=&quot;210&quot;&gt;&lt;param name=&quot;movie&quot; value=&quot;http://www.youtube.com/v/6yKqOaV-pgk?fs=1&amp;amp;hl=ja_JP&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowFullScreen&quot; value=&quot;true&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowscriptaccess&quot; value=&quot;always&quot;&gt;&lt;/param&gt;&lt;embed src=&quot;http://www.youtube.com/v/6yKqOaV-pgk?fs=1&amp;amp;hl=ja_JP&quot; type=&quot;application/x-shockwave-flash&quot; allowscriptaccess=&quot;always&quot; allowfullscreen=&quot;true&quot; width=&quot;320&quot; height=&quot;210&quot;&gt;&lt;/embed&gt;&lt;/object&gt;&lt;br /&gt;&lt;br /&gt;自分名義で堂々とアップすれば　支持したんだけどね　斉藤和義　&lt;br /&gt;知人が漏洩だとか　こそこそぶりは　東電によく似た体質なんだぜ(笑)</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/6577033990166091974/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_4386.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/6577033990166091974'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/6577033990166091974'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_4386.html' title='斉藤和義 ずっとウソだったんだぜ　歌っていい気分(笑)　で？何か？'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-6971364236690368725.post-7267249641037065639</id><published>2011-04-07T19:24:00.000+09:00</published><updated>2011-04-12T21:54:36.884+09:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="福島原発　動画　避難地域 神保哲生"/><title type='text'>原発避難地域を行く:　ビデオジャーナリスト神保哲生</title><content type='html'>原発避難地域 - YouTube&lt;br /&gt;&lt;a href=&quot;http://www.youtube.com/watch?v=nAn5SWZA_8Y&quot; target=&quot;_blank&quot;&gt;http://www.youtube.com/watch?v=nAn5SWZA_8Y&lt;/a&gt;&lt;br /&gt;原発避難地域は犬や牛の群れが闊歩 - 　インターネット放送局&lt;br /&gt;&lt;a href=&quot;http://www.videonews.com/special-report/031040/001810.php&quot; target=&quot;_blank&quot;&gt;http://www.videonews.com/special-report/031040/001810.php&lt;/a&gt;&lt;br /&gt;&lt;br /&gt;&lt;object height=&quot;349&quot; width=&quot;425&quot;&gt;&lt;param name=&quot;movie&quot; value=&quot;http://www.youtube.com/v/nAn5SWZA_8Y?fs=1&amp;amp;hl=ja_JP&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowFullScreen&quot; value=&quot;true&quot;&gt;&lt;/param&gt;&lt;param name=&quot;allowscriptaccess&quot; value=&quot;always&quot;&gt;&lt;/param&gt;&lt;embed src=&quot;http://www.youtube.com/v/nAn5SWZA_8Y?fs=1&amp;amp;hl=ja_JP&quot; type=&quot;application/x-shockwave-flash&quot; allowscriptaccess=&quot;always&quot; allowfullscreen=&quot;true&quot; width=&quot;425&quot; height=&quot;349&quot;&gt;&lt;/embed&gt;&lt;/object&gt;&lt;br /&gt;&lt;br /&gt;ビデオジャーナリスト神保哲生のブログ&lt;br /&gt;&lt;a href=&quot;http://www.jimbo.tv/&quot;&gt;http://www.jimbo.tv/&lt;/a&gt;</content><link rel='replies' type='application/atom+xml' href='http://jp311.blogspot.com/feeds/7267249641037065639/comments/default' title='コメントの投稿'/><link rel='replies' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_07.html#comment-form' title='0 件のコメント'/><link rel='edit' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/7267249641037065639'/><link rel='self' type='application/atom+xml' href='http://www.blogger.com/feeds/6971364236690368725/posts/default/7267249641037065639'/><link rel='alternate' type='text/html' href='http://jp311.blogspot.com/2011/04/blog-post_07.html' title='原発避難地域を行く:　ビデオジャーナリスト神保哲生'/><author><name>Unknown</name><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry></feed>