<?xml version="1.0" encoding="Windows-1252"?>
<rss version="2.0">
<channel>
<title>ODEE - Offshore Design &#x26; Engineering Equipment</title>
<link>http://www.offshoreeuropejournal.com</link>
<description>ODEE - Offshore Design &#x26; Engineering Equipment</description>
<language>en</language>
<pubDate>Wed, 15 Apr 2026 11:20:51 GMT</pubDate>
<lastBuildDate>Wed, 15 Apr 2026 11:20:51 GMT</lastBuildDate>
<docs>http://blogs.law.harvard.edu/tech/rss</docs>
<generator>PFPS version 2.47</generator>
<image>
<title>ODEE - Offshore Design &#x26; Engineering Equipment</title>
<url>http://www.offshoreeuropejournal.com/images/rss.gif</url>
<link>http://www.offshoreeuropejournal.com</link>
</image>
<item>
<title>A third of Europe�s wind capacity will face critical end-of-life decision by 2030 - Shoreline report</title>
<link>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9454/A_third_of_Europe_92s_wind_capacity_will_face_critical_end-of-life_decision_by_2030_-_Shoreline_report.html</link>
<description>Europe&#x26;#8217;s wind farms will soon face a wave of critical end-of-life decisions, with almost 30% (86 GW) of the region&#x26;#8217;s installed wind capacity approaching 20 years of operation by 2030, according to a new report from Shoreline Wind, a premier provider of digital planning and simulation solutions for the wind industry.</description>
<pubDate>Wed, 15 Apr 2026 04:00:00 GMT</pubDate>
<guid>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9454</guid>
</item>
<item>
<title>Pneumatic pipe ramming supports offshore wind grid connections</title>
<link>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9452/Pneumatic_pipe_ramming_supports_offshore_wind_grid_connections.html</link>
<description></description>
<pubDate>Wed, 08 Apr 2026 04:00:00 GMT</pubDate>
<guid>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9452</guid>
</item>
<item>
<title>Groundbreaking new research begins on sustainable wind turbine tower design made with UK steel</title>
<link>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9450/Groundbreaking_new_research_begins_on_sustainable_wind_turbine_tower_design_made_with_UK_steel.html</link>
<description></description>
<pubDate>Wed, 01 Apr 2026 04:00:00 GMT</pubDate>
<guid>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9450</guid>
</item>
<item>
<title>Subsea support vessel �r/v Mintis� joins Mark Offshore fleet</title>
<link>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9447/Subsea_support_vessel__91r_v_Mintis_92_joins_Mark_Offshore_fleet.html</link>
<description></description>
<pubDate>Wed, 25 Mar 2026 04:00:00 GMT</pubDate>
<guid>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9447</guid>
</item>
<item>
<title>RWE installs substations for Nordseecluster A offshore wind farm</title>
<link>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9455/RWE_installs_substations_for_Nordseecluster_A_offshore_wind_farm.html</link>
<description>Around 50 kilometres north of the island of Juist, the Nordseecluster is taking shape &#x26;#8211; a joint offshore wind project between RWE (51%) and Norges Bank Investment Management (49%). A &#x26;#8216;wedding&#x26;#8217;, as the successful installation of a substation onto its foundation is known, has now been celebrated at the offshore construction site. This special event could be witnessed twice in recent days, as the two substations of the Nordseecluster A, each around 40 metres long and 22 metres high, were successfully installed. One topside weighs around 1,800 tonnes, the other around 2,500 tonnes.</description>
<pubDate>Wed, 15 Apr 2026 04:00:00 GMT</pubDate>
<guid>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9455</guid>
</item>
<item>
<title>Innovative cable carousel solution</title>
<link>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9453/Innovative_cable_carousel_solution.html</link>
<description>Netherlands headquartered Subsea Cable Assets (SCA) has announced it has won its first framework contract with German grid operator 50 Hertz Transmission GmbH, secured through a competitive European tender process, to deliver four of its newly designed cable storage and handling systems.</description>
<pubDate>Thu, 09 Apr 2026 04:00:00 GMT</pubDate>
<guid>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9453</guid>
</item>
<item>
<title>CRP Subsea awarded major offshore wind contract </title>
<link>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9451/CRP_Subsea_awarded_major_offshore_wind_contract_.html</link>
<description>CRP Subsea, an AIS company, has announced it has secured a significant contract with Jan De Nul to&#x26;#160;supply cable protection systems for Vattenfall&#x26;#8217;s Nordlicht I wind farm located in the&#x26;#160;German North Sea.</description>
<pubDate>Wed, 01 Apr 2026 04:00:00 GMT</pubDate>
<guid>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9451</guid>
</item>
<item>
<title>Natural Power supports acquisition of 42.5 MW Higher Witheven Solar Project in Cornwall</title>
<link>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9449/Natural_Power_supports_acquisition_of_42.5_MW_Higher_Witheven_Solar_Project_in_Cornwall.html</link>
<description>Natural Power, a leading renewable energy consultancy and service provider, has announced it acted as technical adviser to Investment Manager Downing on the acquisition of the 42.5 MW Higher Witheven solar project in Cornwall.</description>
<pubDate>Wed, 25 Mar 2026 04:00:00 GMT</pubDate>
<guid>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9449</guid>
</item>
<item>
<title>Hybrid energy solution protects onshore wind farm during network outage</title>
<link>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9445/Hybrid_energy_solution_protects_onshore_wind_farm_during_network_outage.html</link>
<description>A planned network outage threatened to halt operations at an onshore wind farm in Scotland, so engineered energy and temperature solutions provider Aggreko says it stepped in to supply a rapid, low-emission hybrid energy solution to keep all 13 turbines protected and performing.</description>
<pubDate>Wed, 18 Mar 2026 04:00:00 GMT</pubDate>
<guid>http://www.offshoreeuropejournal.com/news/fullstory.php/aid/9445</guid>
</item>
</channel>
</rss>