<?xml version='1.0' encoding='UTF-8'?><rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:openSearch="http://a9.com/-/spec/opensearchrss/1.0/" xmlns:blogger="http://schemas.google.com/blogger/2008" xmlns:georss="http://www.georss.org/georss" xmlns:gd="http://schemas.google.com/g/2005" xmlns:thr="http://purl.org/syndication/thread/1.0" version="2.0"><channel><atom:id>tag:blogger.com,1999:blog-898407746975536352</atom:id><lastBuildDate>Tue, 15 Sep 2026 05:06:51 +0000</lastBuildDate><title>RMA Land Construction, Inc.</title><description></description><link>http://rmalandconstructioninc.blogspot.com/</link><managingEditor>noreply@blogger.com (RMA Land Construction, Inc.)</managingEditor><generator>Blogger</generator><openSearch:totalResults>45</openSearch:totalResults><openSearch:startIndex>1</openSearch:startIndex><openSearch:itemsPerPage>25</openSearch:itemsPerPage><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-4193615117660693056</guid><pubDate>Fri, 17 Jan 2014 19:11:00 +0000</pubDate><atom:updated>2014-01-17T11:16:27.760-08:00</atom:updated><title>RMA Wins Brawerman Diabetes Clinic Project at the City of Hope National Medical Center, Duarte, CA</title><atom:summary type="text">
Brea, Calif. (Jan. 17) - RMA
Land Construction, Inc. (RMA) was awarded a contract by the City of Hope to convert an existing
space into a diabetes clinic to better serve patients and their families. The
existing space is located within the basement of the Brawerman Building located
on the campus of the City of Hope National Medical Center in Duarte, CA. The
space currently houses miscellaneous </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2014/01/rma-wins-brawerman-diabetes-clinic.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-554746128053189569</guid><pubDate>Thu, 03 Oct 2013 20:38:00 +0000</pubDate><atom:updated>2013-10-03T13:57:41.546-07:00</atom:updated><title>Keith Greer, Recognized as a Rising Star of Safety, Class of 2013</title><atom:summary type="text">Keith Greer, RMA’s Site Safety&amp;nbsp;and Health
Manager, has been named a “Rising Star of Safety” by the National Safety
Council (NSC). The NSC Rising Stars of Safety program honors up-and-coming
safety leaders in a variety of industries. Keith was selected as one of the program&#39;s 40
leading safety professionals out of 110 nominees. 


&quot;Keith
has been an invaluable resource to RMA’s Health and </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2013/10/keith-greer-recognized-as-rising-star.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-7555985512701459697</guid><pubDate>Wed, 18 Sep 2013 17:51:00 +0000</pubDate><atom:updated>2013-09-18T10:51:02.882-07:00</atom:updated><title>Walsh RMA Joint Venture Finalizes Construction for the  Tactical Equipment Maintenance Facility Project</title><atom:summary type="text">
Brea, Calif. (Sept. 18) –&amp;nbsp;RMA Land
Construction, Inc. (RMA)&amp;nbsp;under the
Walsh RMA Joint Venture (Walsh-RMA), is celebrating the recent&amp;nbsp;completion of the
$37.8 million Tactical Equipment Maintenance Facility (TEMF) project at
Schofield Barracks, Hawaii. As with any successful project, objectives
were achieved through a commitment to exceed the minimum requirements, and go
beyond the </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2013/09/walsh-rma-joint-venture-finalizes.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><media:thumbnail xmlns:media="http://search.yahoo.com/mrss/" url="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEjceCN9v4rYQaM1Mvqep1W2eQCGsa1jKSBRgQZqwoRErGvkpkGpChNHtUvYfxIAzh9jkucIiPFNvCrfrtzOruj7ZpgpwM-Gf7AxG3kW6n86QcjNKPUbZgDeZ3abm8AifGHipSqxhoEy5jYP/s72-c/web_Bldg+Exterior.jpg" height="72" width="72"/><thr:total>4</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-5792408215277454597</guid><pubDate>Mon, 22 Jul 2013 18:16:00 +0000</pubDate><atom:updated>2013-07-22T11:40:13.018-07:00</atom:updated><title>Striving to be NAVFAC’s Model Construction Site – BEQs at Point Mugu, Naval Base Ventura County, CA</title><atom:summary type="text">NAVFAC Southwest recently selected RMA’s Design-Build
Renovate BEQs, B-21, B-22 &amp;amp; B-23 as the project site to visit at Point
Mugu, Naval Base Ventura County, CA. The site was deemed to be impressively clean, orderly and in accordance with safety, quality and production standards. 

Capt. Bruce Nevel (NAVFAC Operations
Officer) and LTJG Alex Rovinksy (NAVFAC Construction Manager) walked the
</atom:summary><link>http://rmalandconstructioninc.blogspot.com/2013/07/striving-to-be-navfacs-model.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><media:thumbnail xmlns:media="http://search.yahoo.com/mrss/" url="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEj_k_hPxFlKgQhVNysXZZEfsXu7Rp_24Z3WihOj2kyIhZbeYkIUtxtq8l0IThQV5z_T-fwt_0flHOOQzWfoX6AD3iQQIvKeNpkP73Qjt1641O_4duY_zNLjbq9FNrs5X9R6tCmvQvkZ1FHQ/s72-c/Capt+Nevel+006.jpg" height="72" width="72"/><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-5511567016693092768</guid><pubDate>Mon, 08 Jul 2013 22:46:00 +0000</pubDate><atom:updated>2013-07-08T15:46:21.207-07:00</atom:updated><title>Fort Hood Access Control Point Project, Onsite for a Year with Zero Lost Time Safety Incidents</title><atom:summary type="text">

Safety Success
is a Team Effort. As a result of&amp;nbsp;the firm commitment from our subcontractors to uphold
RMA’s health&amp;nbsp;and safety standards, the Access Control Point (ACP) project at
Fort Hood, TX, has achieved 365 days with zero lost time safety incidents.


&amp;nbsp;


RMA’s onsite
team implementing the site-specific Health &amp;nbsp;&amp;amp; Safety Plan (HSP) at the ACP consists of
James Steinke</atom:summary><link>http://rmalandconstructioninc.blogspot.com/2013/07/fort-hood-access-control-point-project.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><media:thumbnail xmlns:media="http://search.yahoo.com/mrss/" url="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEjbt70n1w0c5dtuuEzWTxu6D_lQXpA-yJkNdSvDshxaydPK3QzkUdGJEB4mOfK4zIHPCjQjSzFKZJalfmfpuKoFWkGkQRGoBmqew1IQ8aG-dg6wRxX2AYceOwurf-SNFkIG2c01FG5ZcQPL/s72-c/IMG_0472b.JPG" height="72" width="72"/><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-5041007672151410736</guid><pubDate>Wed, 05 Jun 2013 21:12:00 +0000</pubDate><atom:updated>2013-06-05T14:12:17.236-07:00</atom:updated><title>Keith Greer, Site Safety &amp; Health Officer, Nominated for National Safety Council’s Rising Stars of Safety, Class of 2013</title><atom:summary type="text">

RMA
recently nominated Keith Greer, Site Safety &amp;amp; Health Officer, for the
National Safety Council’s Rising Stars of Safety, Class of 2013. According
to Sharon Groff, Corporate Safety Officer, Keith was selected for his embrace
of the safety protocols and processes. It was through his determination
to use opportunities to further his safety knowledge that he was assigned to
the large, </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2013/06/keith-greer-site-safety-health-officer.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-8979326023713558029</guid><pubDate>Wed, 22 May 2013 21:42:00 +0000</pubDate><atom:updated>2013-05-22T16:18:29.122-07:00</atom:updated><title>We&#39;ve Come a Long Way....A Project Update from TEMF, Schofield Barracks, Hawaii</title><atom:summary type="text">Brea, Calif. (May 22) - The Tactical Equipment Maintenance Facility project at Schofield Barracks, Hawaii is currently at 686 days and over 250,000 man-hours&amp;nbsp;without a lost-time&amp;nbsp;safety incident. With over 750 individuals having performed work&amp;nbsp;on site, a primary focus of the Walsh RMA Joint Venture team&amp;nbsp;has&amp;nbsp;been&amp;nbsp;to ensure a safe, healthy and&amp;nbsp;accident-free </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2013/05/weve-come-long-waya-project-update-from.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><media:thumbnail xmlns:media="http://search.yahoo.com/mrss/" url="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEji1UOkaC3qWcD787OrFnHqbXnLHp4p6DsTceBoiWiSVLw_M0b1qL2nbMTc41O7mrElSP-lWk_CHIdJr3DfeVvINedNqS19zamHxtJ9N_1Yrlvehpl7x7hmiK7AMSj3Te9sr13wM5MCEpcj/s72-c/P1010548.JPG" height="72" width="72"/><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-6227908934340350662</guid><pubDate>Wed, 17 Apr 2013 18:22:00 +0000</pubDate><atom:updated>2013-04-17T11:36:19.488-07:00</atom:updated><title>Child Development Center at Naval Station Ford Island Receives GCA 2013 Build Hawaii Award</title><atom:summary type="text">
Brea,
Calif. (April 17) - The Child Development Center (CDC) at Naval Station Ford Island, Joint
Base Pearl Harbor-Hickam (JBPHH), HI, was recognized with the General Contractors Association of
Hawaii (GCA) 2013 Build Hawaii Honorable Mention Award
in the “Federal Construction Less Than $30 Million” category for exemplifying
the highest standards of construction. 

Completed in 2012 by RMA-ECC, </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2013/04/child-development-center-at-naval.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><media:thumbnail xmlns:media="http://search.yahoo.com/mrss/" url="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEh76Bg1MyXyozSbX1k7GcNdWjSeqKYSa-lRlEs29vsellKI9dX80m1Y9gu7DLBpfOeGjzrEA8vSMniCyUJ0roZk5dcYS5Ff1TG9m7TJI1QLxlpWwU3NOlz_MMjpbKpBl_ukkNmvtcBzin0O/s72-c/CDC+GCA.jpg" height="72" width="72"/><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-8669912974124114786</guid><pubDate>Tue, 02 Apr 2013 23:05:00 +0000</pubDate><atom:updated>2013-04-02T16:05:39.572-07:00</atom:updated><title>Safety Celebration at TEMF, Schofield Barracks, Hawaii</title><atom:summary type="text">

Anaheim, Calif. (April 2) - Walsh RMA Joint
Venture hosted a fourth safety party at the jobsite for the Construct Tactical
Equipment Maintenance Facility (TEMF), Schofield Barracks, HI on March 29, to
celebrate the achievement of 200,000 man hours and over 50,000 equipment
operation hours without a lost time safety accident. 

&amp;nbsp;

Approximately 70 workers,
including eight (8) subcontractor </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2013/04/safety-celebration-at-temf-schofield.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><media:thumbnail xmlns:media="http://search.yahoo.com/mrss/" url="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEiuwnQrfFUM86x6qdq53LGjKCYXqX7BiLIafmLOoBnqKRjhq_QwEJh3XgENetmV0CjGsZWXAB69sYJ1hCyvkymiKHtml9nVH9F_9afw7KKI6fiTH24nVFxw4cB3OZBkzWdk97d3i6cDzMub/s72-c/temf_safety_03.2013.jpg" height="72" width="72"/><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-7571053417625301411</guid><pubDate>Fri, 01 Mar 2013 22:06:00 +0000</pubDate><atom:updated>2013-05-22T16:21:20.262-07:00</atom:updated><title>Major Safety Milestone at Tactical Equipment Maintenance Facility (TEMF), Schofield Barracks, HI</title><atom:summary type="text">






Anaheim, Calif. (March 1) -&amp;nbsp;The Walsh
RMA Joint Venture (Walsh-RMA) has achieved a major safety milestone with
200,000 man hours and over 50,000 equipment operation hours logged with no OSHA
recordable incidents or lost-time accidents&amp;nbsp;on the Construct Tactical
Equipment Maintenance Facility (TEMF) project at Schofield Barracks, HI.



To
achieve these results, Walsh-RMA </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2013/03/major-safety-milestone-at-tactical.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><media:thumbnail xmlns:media="http://search.yahoo.com/mrss/" url="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEidUSXnwlqIynbRXc3NYZEzyqZvAGo5hBi1hkegpn0z2c7asQIzqH0lmotwZah81r1fOCD9XfgTMcDwOA4Y4neaVU6MAJVSkmIrfpELFfYR3-A2zb5JexghISa_vt1JQ5C70sOAZGVV3tI7/s72-c/IMG_1558w.JPG" height="72" width="72"/><thr:total>1</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-3394097109837433943</guid><pubDate>Fri, 15 Feb 2013 04:11:00 +0000</pubDate><atom:updated>2013-02-14T20:25:55.985-08:00</atom:updated><title>Ribbon Cutting for Demolition and Consolidation of NAWC-WD at Naval Base Ventura County, Point Mugu, Ventura, CA</title><atom:summary type="text">
Anaheim, Calif. (Feb. 14) - RMA Land Construction, Inc. (RMA) held a Ribbon Cutting ceremony to commemorate the design-build replacement of the existing laboratory facilities at the Naval Warfare Center - Weapons Division (NAWC-WD) located within Naval Warfare Center, Point Mugu, Ventura, CA. RMA renovated three (3) buildings and provided demolition and disposal of 16 buildings with a total of </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2013/02/ribbon-cutting-for-demolition-and.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><media:thumbnail xmlns:media="http://search.yahoo.com/mrss/" url="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgrRqi1SBaFXVfHpcoE2hb9Qn4gp0cQv6J1NtvPMB5aOUE5KDNb-oWD2HOQSL91BDaT40rKbyq6S9GcTt-iUTLPttzlY7Pj0TPBVWs25HQq3yHRQNmTofzxEQrU8B7ejXOAwVuNYO5BTVQy/s72-c/IMG_2290w.JPG" height="72" width="72"/><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-7667205334302577972</guid><pubDate>Tue, 11 Dec 2012 19:45:00 +0000</pubDate><atom:updated>2013-04-30T11:21:55.590-07:00</atom:updated><title>2012 Masonry Construction Reader&#39;s Choice Winner: Marine Corps Reserve Training Center at NWS Seal Beach, CA</title><atom:summary type="text">
Thank you to everyone who supported our team by voting for the project “Marine Corps Reserve Training Center at Naval Weapons Station, Seal Beach, CA”. The project completed by RMA Land Construction, Inc.&amp;nbsp;with URS as Lead Design Firm&amp;nbsp;was selected for the category of&amp;nbsp;Reader&#39;s Choice.

&amp;nbsp;

Visit Masory Construction for more examples of innovative masonry construction across the </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2012/12/2012-masonry-construction-readers.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-8316898100683021291</guid><pubDate>Mon, 19 Nov 2012 22:00:00 +0000</pubDate><atom:updated>2012-11-19T15:28:59.942-08:00</atom:updated><title>Vote for RMA&#39;s Project: Marine Corps Reserve Training Center at NWS Seal Beach, CA</title><atom:summary type="text">Voting
is open today, Monday, November 19 – Wednesday,
December 5, 2012 for the &amp;nbsp;“Masonry
Construction” Magazine, Project of the Year Award.&amp;nbsp; With our team
partner URS, our project “Marine Corps Reserve Training Center at Naval Weapons Station, Seal Beach,
CA”, was submitted for consideration in the “Municipal” category which
encompasses Federal Work. The magazine publisher will </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2012/11/vote-for-rmas-project-marine-corps.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-4715927481236005284</guid><pubDate>Fri, 02 Nov 2012 20:47:00 +0000</pubDate><atom:updated>2012-11-02T15:25:05.260-07:00</atom:updated><title>Major Feat for RMA Project Team as New Hood Stadium Complex Opens Gates to the Public</title><atom:summary type="text">
Anaheim, Calif. (Nov. 2) - The true test of a good team and its leaders comes in times of adversity. From the onset of the Hood Stadium replacement project, the team has faced tough challenges. However, Jim Martin (Sr. Project Manager), Chris Martin (Project Manager), Lysander Little (CQC Manager), Gary Lee (QC Specialist), James Steinke (SSHO), Mike Dyson (Superintendent), Paul Henion (</atom:summary><link>http://rmalandconstructioninc.blogspot.com/2012/11/major-feat-for-rma-project-team-as-new.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><media:thumbnail xmlns:media="http://search.yahoo.com/mrss/" url="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEjDOZv-AZL8Nszztt-_F9vTwr6rOMeO7OGeUrSB03bzeHPZzq3ZvbD3xeedO18WydCFswovaihosb0RncYnDYPF6Kqd5R-nqkt1RJ3nAfS9Ibuh8_hOvjUzScRFw1MdfUssEka4tvQ_mkto/s72-c/Stadium-Replacement-Project-1.jpg" height="72" width="72"/><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-6055135104069193399</guid><pubDate>Tue, 30 Oct 2012 01:21:00 +0000</pubDate><atom:updated>2012-11-02T18:24:41.050-07:00</atom:updated><title>Traditional Maile Lei Untying and Blessing Ceremony Marks Grand Opening of the 37,404 SF Child Development Center at Ford Island, JBPHH, HI</title><atom:summary type="text">


Pictured from left to right,Pastor Kekoa, Senator Inouye,Capt. James and Rear Adm. Ponds

Anaheim, Calif. (Oct. 29) – The traditional untying of the Maile Lei commemorated the grand opening of the newly built Child Development Center (CDC) at Ford Island, Joint Base Pearl Harbor-Hickam (JBPHH), HI. In attendance at this historic event were The Honorable Daniel Inouye, U.S. Senator; U.S. Navy </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2012/10/traditional-maile-lei-untying-and.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><media:thumbnail xmlns:media="http://search.yahoo.com/mrss/" url="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEhb-DpRaTXIA19X0DqDvrsBWxupDgsWOJ2jYafteinY1rgTVMCRXCasFreo0LN8sh9rK9rBdGshHLXQ8d_4S3Th6Fkl8-rX-5JuvfItVdSRKtrSG7Y73K5uuwOhNFEC6VnjoB_WRRz4U3j9/s72-c/Maile-Lei-Ceremony_1.jpg" height="72" width="72"/><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-5940323125735462534</guid><pubDate>Tue, 28 Aug 2012 00:30:00 +0000</pubDate><atom:updated>2012-11-01T15:52:39.369-07:00</atom:updated><title>Walsh RMA Joint Venture Earns Safety Achievement Certificate for the Tactical Equipment Maintenance Facility Project</title><atom:summary type="text">

Anaheim, Calif.
(Aug. 27) – RMA Land Construction, Inc., under the Walsh RMA Joint Venture
(Walsh-RMA), was presented with a Certificate of Achievement Safety Award by
the Corps of Engineers (COE), Honolulu District, for their outstanding
accomplishment of working in excess of 100,000 safe construction man-hours
without a single lost-time injury on the $37.8 Million design-bid-build
Tactical </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2012/08/walsh-rma-joint-venture-earns-safety.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-1431675345230768595</guid><pubDate>Fri, 06 Jul 2012 23:34:00 +0000</pubDate><atom:updated>2012-11-01T15:53:12.576-07:00</atom:updated><title>RMA Wins Bachelor Enlisted Quarters (BEQ) Renovation at Naval Base Ventura County, Point Mugu, CA</title><atom:summary type="text">
Anaheim, Calif. (July 6) - RMA Land Construction, Inc., (RMA) was awarded a $9.2-million task order under our Small Business MACC IDIQ contract. The task order is for the renovation of three (3) two-story Bachelor Enlisted Quarters (BEQs), Buildings B-21, B-22, and B-23, totaling approximately 41,400 SF, located within Naval Base Ventura County, Point Mugu, CA. This task order is RMA’s third </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2012/07/rma-wins-bachelor-enlisted-quarters-beq.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-833069344442905842</guid><pubDate>Sat, 30 Jun 2012 02:25:00 +0000</pubDate><atom:updated>2012-11-01T15:54:58.331-07:00</atom:updated><title>Ribbon Cutting Ceremony Commemorates Completion of the  Marine Corps Reserve Training Center at NWS, Seal Beach, CA</title><atom:summary type="text">

Anaheim, Calif. (June 29) –
RMA Land Construction, Inc. (RMA)&amp;nbsp;completed construction of the Marine Corps Reserve Training Center (MCRTC) at
Naval Weapons Station (NWS), Seal Beach, CA. A ribbon-cutting ceremony was held
on May 22, commemorating the opening of the new 26,910 SF MCRTC and 6,332 SF Vehicle
Holding and Light Gun Shed.
In attendance to cut the ceremonial ribbon were Lieutenant </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2012/06/ribbon-cutting-ceremony-commemorates.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-7128129352870964424</guid><pubDate>Thu, 28 Jun 2012 22:52:00 +0000</pubDate><atom:updated>2012-06-28T15:52:44.298-07:00</atom:updated><title>RMA-ECC, A Joint Venture Finalizes Construction of the Single-Story 37,404 SF Child Development Center at Ford Island, JBPHH, HI</title><atom:summary type="text">
Anaheim, Calif. (June 28) - Situated on a seven-acre site, the Child Development Center (CDC) project at Ford Island, Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii, was recently completed. Awarded to RMA-ECC, A Joint Venture, this $16.7-million project represents the successful construction of the first CDC built on Ford Island and the Navy’s third entirely new CDC at JBPHH. The facility </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2012/06/rma-ecc-joint-venture-finalizes.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-4568203308829409120</guid><pubDate>Thu, 24 Nov 2011 00:56:00 +0000</pubDate><atom:updated>2012-11-01T15:46:07.433-07:00</atom:updated><title>RMA Earns District Commander’s Military Construction Program Safety Achievement Award</title><atom:summary type="text">




Anaheim, Calif. (Nov. 23) - RMA Land Construction, Inc., (RMA) was awarded the U.S. Army Corps of Engineers, Albuquerque District Commander’s Military Construction Program Safety Achievement Award for zero lost time safety accidents throughout the construction of a new single-story 21,850 SF Child Development Center (CDC) at Cannon Air Force Base, Clovis, NM. The Albuquerque District </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2011/11/rma-earns-district-commanders-military.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-2971222184107870755</guid><pubDate>Fri, 29 Apr 2011 07:30:00 +0000</pubDate><atom:updated>2012-11-01T15:54:23.571-07:00</atom:updated><title>RMA Breaks Ground for the Design-Build Marine Corps Reserve Training Center at Naval Weapons Station, Seal Beach, CA</title><atom:summary type="text">Anaheim, Calif. (April 29) - RMA Land Construction, Inc., (RMA) participated in the official groundbreaking ceremony to mark the start of construction at the site for the new single-story, 26,910 SF Marine Corps Reserve Training Center (MCRTC) and 6,332 SF gun shed at the Naval Weapons Station (NWS), Seal Beach, CA. In attendance were Lieutenant Commander Chad Lorenzana, Public Works Office, </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2011/04/rma-breaks-ground-for-design-build.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-2013180373105180965</guid><pubDate>Fri, 29 Apr 2011 02:01:00 +0000</pubDate><atom:updated>2011-04-28T19:01:47.256-07:00</atom:updated><title>RMA Wins Traffic Mitigation Measures Gates 3 and 4 in a New Region</title><atom:summary type="text">Anaheim, Calif. (April 27) - RMA Land Construction, Inc., (RMA) was awarded a $5.1-million task order on our Small Business Global MACC IDIQ contract. The task order is for Traffic Mitigation Measures at Gates 3 and 4 at the National Naval Medical Center (NNMC) in Bethesda, Maryland. This task order is RMA’s first in the Washington DC region and second award under the SBGMAC. As part of BRAC 2011</atom:summary><link>http://rmalandconstructioninc.blogspot.com/2011/04/rma-wins-traffic-mitigation-measures.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-943626088680681079</guid><pubDate>Thu, 17 Mar 2011 22:28:00 +0000</pubDate><atom:updated>2012-11-01T15:49:06.445-07:00</atom:updated><title>RMA Exceeds First Quarter Safety Goals Through our Safety Incentive Program</title><atom:summary type="text">Anaheim, Calif. (March 17) - RMA Land Construction, Inc., (RMA) took great strides towards increasing safety awareness and training through the use of a Safety Incentive and Recognition program, which rewards employees who have gone the extra mile in safety insight and prevention. Spearheading the initiative was RMA’s electrical division. One of RMA’s newly appointed safety officers in training </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2011/03/rma-exceeds-first-quarter-safety-goals.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-1989709447201211888</guid><pubDate>Thu, 03 Mar 2011 23:28:00 +0000</pubDate><atom:updated>2012-11-01T15:49:36.620-07:00</atom:updated><title>RMA Celebrates Read Across America Day at Euclid Elementary School, Los Angeles, CA</title><atom:summary type="text">Anaheim, Calif. (March 3) - RMA Land Construction, Inc., (RMA) participated in the National Education Association’s Read Across America program by reading stories to the students of Euclid Elementary School, located within the Boyle Heights School District. This celebration is held annually on the birthday of Theodor Seuss Geisel (acclaimed children’s author Dr. Seuss), providing increased </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2011/03/rma-celebrates-read-across-america-day.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item><item><guid isPermaLink="false">tag:blogger.com,1999:blog-898407746975536352.post-2564500314089001914</guid><pubDate>Tue, 01 Mar 2011 23:27:00 +0000</pubDate><atom:updated>2012-11-01T15:50:02.696-07:00</atom:updated><title>Walsh RMA Joint Venture Wins Tactical Equipment Maintenance Facility Project at Schofield Barracks, Oahu, Hawaii</title><atom:summary type="text">Anaheim, Calif. (March 1) - RMA Land Construction, Inc., (RMA) was awarded a $37.8 Million design-bid-build project under the Walsh RMA Joint Venture (Walsh-RMA) for the U.S. Army Corps of Engineers, Honolulu District. This project requires construction of six (6) structures, including a large two-story 60,000 SF vehicle maintenance facility located within Schofield Barracks, Oahu, HI.

The </atom:summary><link>http://rmalandconstructioninc.blogspot.com/2011/03/walsh-rma-joint-venture-wins-tactical.html</link><author>noreply@blogger.com (RMA Land Construction, Inc.)</author><thr:total>0</thr:total></item></channel></rss>