<?xml version="1.0" encoding="US-ASCII"?>
<?xml-stylesheet type="text/xsl" media="screen" href="/~d/styles/rss2full.xsl"?><?xml-stylesheet type="text/css" media="screen" href="http://feeds.feedburner.com/~d/styles/itemcontent.css"?><rss xmlns:feedburner="http://rssnamespace.org/feedburner/ext/1.0" version="2.0"><channel><title>Traffic &amp; Construction at TAMU</title><link>http://transport.tamu.edu/construction.aspx</link><description>Information on city and university construction projects that are affecting parking, traffic and transit service on campus.</description><atom10:link xmlns:atom10="http://www.w3.org/2005/Atom" rel="self" type="application/rss+xml" href="http://feeds.feedburner.com/TAMUTrafficConstruction" /><feedburner:info uri="tamutrafficconstruction" /><atom10:link xmlns:atom10="http://www.w3.org/2005/Atom" rel="hub" href="http://pubsubhubbub.appspot.com/" /><item><title>Throckmorton Partial Closure                                                                        </title><link>http://feedproxy.google.com/~r/TAMUTrafficConstruction/~3/Iu-O0OfAA0o/construction.aspx</link><description>(05/22)&lt;br /&gt;Transportation Services has been notified of the need to close Throckmorton Street between Joe Routt Blvd and Central Lamar St. on Wednesday May 22, 2013 to accommodate Utilities and Energy Services erecting new light poles.&lt;img src="http://feeds.feedburner.com/~r/TAMUTrafficConstruction/~4/Iu-O0OfAA0o" height="1" width="1"/&gt;</description><pubDate>Tue, 21 May 2013 13:26:00 CST</pubDate><guid isPermaLink="false">http://transport.tamu.edu/construction.aspx#586</guid><feedburner:origLink>http://transport.tamu.edu/construction.aspx#586</feedburner:origLink></item><item><title>Jones St. Closure                                                                                   </title><link>http://feedproxy.google.com/~r/TAMUTrafficConstruction/~3/oTbKs7ZYb74/construction.aspx</link><description>(05/23 - 06/05)&lt;br /&gt;We have been notified that Jones St. will be closed between the entrance to Lot 42 and Old Main Dr. for work on the Wellborn Road Grade Separation project from May 23, 2013 through June 5, 2013. Temporary two-way traffic will be in effect on Jones St.&lt;img src="http://feeds.feedburner.com/~r/TAMUTrafficConstruction/~4/oTbKs7ZYb74" height="1" width="1"/&gt;</description><pubDate>Tue, 21 May 2013 08:24:00 CST</pubDate><guid isPermaLink="false">http://transport.tamu.edu/construction.aspx#585</guid><feedburner:origLink>http://transport.tamu.edu/construction.aspx#585</feedburner:origLink></item><item><title>Lot 54 Water Main Break                                                                             </title><link>http://feedproxy.google.com/~r/TAMUTrafficConstruction/~3/SHzRTD7Zg9w/construction.aspx</link><description>(05/17)&lt;br /&gt;Transportation Services has been notified of a water main break in Lot 54, please see attached map. If your vehicle is in the affected area please move immediately to another area of Lot 54. Updates will be provided as they become available.&lt;img src="http://feeds.feedburner.com/~r/TAMUTrafficConstruction/~4/SHzRTD7Zg9w" height="1" width="1"/&gt;</description><pubDate>Fri, 17 May 2013 11:54:00 CST</pubDate><guid isPermaLink="false">http://transport.tamu.edu/construction.aspx#583</guid><feedburner:origLink>http://transport.tamu.edu/construction.aspx#583</feedburner:origLink></item><item><title>Lot 39, Temporary Space Closures                                                                    </title><link>http://feedproxy.google.com/~r/TAMUTrafficConstruction/~3/FlN6qrAsNOY/construction.aspx</link><description>(05/20 - 05/22)&lt;br /&gt;Facilities Services will be removing six portable buildings from the Grove and temporarily placing them in Lot 39 from May 20th through May 22nd. See attached map for affected areas.&lt;img src="http://feeds.feedburner.com/~r/TAMUTrafficConstruction/~4/FlN6qrAsNOY" height="1" width="1"/&gt;</description><pubDate>Fri, 17 May 2013 10:49:00 CST</pubDate><guid isPermaLink="false">http://transport.tamu.edu/construction.aspx#582</guid><feedburner:origLink>http://transport.tamu.edu/construction.aspx#582</feedburner:origLink></item><item><title>Lot 88, Temporary Space Closures                                                                    </title><link>http://feedproxy.google.com/~r/TAMUTrafficConstruction/~3/VvR1Px46ExI/construction.aspx</link><description>(05/20 - 05/26)&lt;br /&gt;Facilities Services will be removing six portable buildings from the Grove and temporarily placing them in Lot 88 from May 20th through May 26th. See attached map for affected areas.&lt;img src="http://feeds.feedburner.com/~r/TAMUTrafficConstruction/~4/VvR1Px46ExI" height="1" width="1"/&gt;</description><pubDate>Fri, 17 May 2013 10:21:00 CST</pubDate><guid isPermaLink="false">http://transport.tamu.edu/construction.aspx#581</guid><feedburner:origLink>http://transport.tamu.edu/construction.aspx#581</feedburner:origLink></item><item><title>Lot 73, Parking Lot Repairs and Repainting                                                          </title><link>http://feedproxy.google.com/~r/TAMUTrafficConstruction/~3/6IS9-DC256o/construction.aspx</link><description>(05/24 - 05/27)&lt;br /&gt;Lot 73 will be closed Friday May 24th at 6:00 p.m. through Monday May 27th at 6:00 a.m., for parking lot repair and repainting (weather permitting). Please remove all departmental vehicles from Lot 73 for the duration of this project.&lt;img src="http://feeds.feedburner.com/~r/TAMUTrafficConstruction/~4/6IS9-DC256o" height="1" width="1"/&gt;</description><pubDate>Fri, 17 May 2013 08:24:00 CST</pubDate><guid isPermaLink="false">http://transport.tamu.edu/construction.aspx#580</guid><feedburner:origLink>http://transport.tamu.edu/construction.aspx#580</feedburner:origLink></item><item><title>Lot 30c, Rennovation                                                                                </title><link>http://feedproxy.google.com/~r/TAMUTrafficConstruction/~3/QnciSPuOwEI/construction.aspx</link><description>(05/24 - 08/15)&lt;br /&gt;Lot 30c will be renovated in two phases from May 24, 2013 through August 15, 2013. The phasing will ensure Lot 77 permit holders have pass through access for the duration of the project. Customers currently parking in Lot 30c will need to relocate their vehicles no later than May 23, 2013.&lt;img src="http://feeds.feedburner.com/~r/TAMUTrafficConstruction/~4/QnciSPuOwEI" height="1" width="1"/&gt;</description><pubDate>Thu, 16 May 2013 15:52:00 CST</pubDate><guid isPermaLink="false">http://transport.tamu.edu/construction.aspx#579</guid><feedburner:origLink>http://transport.tamu.edu/construction.aspx#579</feedburner:origLink></item><item><title>Lots 79 and 80, Resurfacing                                                                         </title><link>http://feedproxy.google.com/~r/TAMUTrafficConstruction/~3/_jc-hdisWaQ/construction.aspx</link><description>(05/20 - 06/03)&lt;br /&gt;Lots 79 and 80 will be closed Monday May 20th through Monday June 3rd , for parking lot resurfacing (weather permitting). Please remove all departmental vehicles from Lots 79 and 80 for the duration of this project.&lt;img src="http://feeds.feedburner.com/~r/TAMUTrafficConstruction/~4/_jc-hdisWaQ" height="1" width="1"/&gt;</description><pubDate>Mon, 13 May 2013 13:47:00 CST</pubDate><guid isPermaLink="false">http://transport.tamu.edu/construction.aspx#578</guid><feedburner:origLink>http://transport.tamu.edu/construction.aspx#578</feedburner:origLink></item><item><title>Permanent Closure of Lot 71a                                                                        </title><link>http://feedproxy.google.com/~r/TAMUTrafficConstruction/~3/LgfXL8nkOEk/construction.aspx</link><description>(05/13 - 12/31)&lt;br /&gt;Lot 71a on Agronomy Road will permanently close on May 13, 2013. The City of College Station will be constructing an electrical substation at that location.&lt;img src="http://feeds.feedburner.com/~r/TAMUTrafficConstruction/~4/LgfXL8nkOEk" height="1" width="1"/&gt;</description><pubDate>Thu, 09 May 2013 09:41:00 CST</pubDate><guid isPermaLink="false">http://transport.tamu.edu/construction.aspx#576</guid><feedburner:origLink>http://transport.tamu.edu/construction.aspx#576</feedburner:origLink></item><item><title>West Campus Garage Summer Cleaning                                                                  </title><link>http://feedproxy.google.com/~r/TAMUTrafficConstruction/~3/C6Pjo9_Xq4Q/construction.aspx</link><description>(05/14 - 05/31)&lt;br /&gt;We will be sweeping and power washing inside West Campus Garage beginning May 14th until the end of the month. Cleaning will begin on the top level and work down through the garage. We will use cones and signage to alert customers of the areas currently being cleaned.&lt;img src="http://feeds.feedburner.com/~r/TAMUTrafficConstruction/~4/C6Pjo9_Xq4Q" height="1" width="1"/&gt;</description><pubDate>Wed, 08 May 2013 13:50:00 CST</pubDate><guid isPermaLink="false">http://transport.tamu.edu/construction.aspx#575</guid><feedburner:origLink>http://transport.tamu.edu/construction.aspx#575</feedburner:origLink></item><item><title>Old Main Drive Closure                                                                              </title><link>http://feedproxy.google.com/~r/TAMUTrafficConstruction/~3/UsguzUsaKQw/construction.aspx</link><description>(05/20 - 06/30)&lt;br /&gt;We have been notified the section of Old Main Dr. between Olsen Drive and the Albritton Bell tower will be closed for work on the Wellborn Road Grade Separation project from May 20, 2013 through June 30, 2013.&lt;img src="http://feeds.feedburner.com/~r/TAMUTrafficConstruction/~4/UsguzUsaKQw" height="1" width="1"/&gt;</description><pubDate>Wed, 08 May 2013 08:51:00 CST</pubDate><guid isPermaLink="false">http://transport.tamu.edu/construction.aspx#574</guid><feedburner:origLink>http://transport.tamu.edu/construction.aspx#574</feedburner:origLink></item></channel></rss>
