<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" media="screen" href="/~d/styles/rss2full.xsl"?><?xml-stylesheet type="text/css" media="screen" href="http://feeds.feedburner.com/~d/styles/itemcontent.css"?><rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" version="2.0">

<channel>
	<title>WM Modular Buildings</title>
	
	<link>http://www.whitleyman.com/blog</link>
	<description>Custom Modular Construction from Whitley Manufacturing</description>
	<lastBuildDate>Wed, 03 Apr 2013 18:28:25 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
		<atom10:link xmlns:atom10="http://www.w3.org/2005/Atom" rel="self" type="application/rss+xml" href="http://feeds.feedburner.com/WMModularBuildings" /><feedburner:info xmlns:feedburner="http://rssnamespace.org/feedburner/ext/1.0" uri="wmmodularbuildings" /><atom10:link xmlns:atom10="http://www.w3.org/2005/Atom" rel="hub" href="http://pubsubhubbub.appspot.com/" /><item>
		<title>Modular Onocology Facility Opens</title>
		<link>http://www.whitleyman.com/blog/modular-healthcare-buildings/modular-onocology-facility-opens/</link>
		<comments>http://www.whitleyman.com/blog/modular-healthcare-buildings/modular-onocology-facility-opens/#comments</comments>
		<pubDate>Mon, 01 Apr 2013 18:41:48 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Modular Healthcare Buildings]]></category>

		<guid isPermaLink="false">http://www.whitleyman.com/blog/?p=815</guid>
		<description><![CDATA[Whitley Manufacturing is proud to announce the opening a new cancer treatment facility in Edmonds, WA. RAD Technologies partnered with Whitley Manufacturing to provide the new treatment facility at the Swedish Cancer Institute’s Edmonds campus. This 17,000 sq. ft. modular &#8230; <a href="http://www.whitleyman.com/blog/modular-healthcare-buildings/modular-onocology-facility-opens/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.whitleyman.com/casestudies/Medical/Swedish-Edmonds-Medical-Oncology-Clinic"><img class="aligncenter size-full wp-image-816" title="Swedish Cancer Institute" src="http://www.whitleyman.com/blog/wp-content/uploads/2013/04/Edmonds.jpg" alt="Modular Onocology Facility Opens" width="700" height="500" /></a></p>
<p>Whitley Manufacturing is proud to announce the opening a new cancer treatment facility in Edmonds, WA. RAD Technologies partnered with Whitley Manufacturing to provide the new treatment facility at the Swedish Cancer Institute’s Edmonds campus. This 17,000 sq. ft. modular facility is home to the most advanced cancer treatment technologies, and provides a multitude of clinical areas and administration spaces.</p>
<p>Designed by award-winning architectural firm Perkins+Will, this building is an illustrious example of contemporary architecture. The Swisspearl rainscreen façade combines seamlessly with light wood accents on the interior and exterior of the building to provide a comfortable and inviting atmosphere. The inspiring design, along with the quality Whitley construction makes this building a welcome addition to the Swedish campus.</p>
<p><a class="a2a_dd a2a_target addtoany_share_save" href="http://www.addtoany.com/share_save#url=http%3A%2F%2Fwww.whitleyman.com%2Fblog%2Fmodular-healthcare-buildings%2Fmodular-onocology-facility-opens%2F&amp;title=Modular%20Onocology%20Facility%20Opens" id="wpa2a_2"><img src="http://www.whitleyman.com/blog/wp-content/plugins/add-to-any/share_save_171_16.png" width="171" height="16" alt="Modular Onocology Facility Opens"  title="Modular Onocology Facility Opens Photo" /></a></p>]]></content:encoded>
			<wfw:commentRss>http://www.whitleyman.com/blog/modular-healthcare-buildings/modular-onocology-facility-opens/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>The UpGrade Modular Building System</title>
		<link>http://www.whitleyman.com/blog/modular-buildings-2/the-upgrade-modular-building-system/</link>
		<comments>http://www.whitleyman.com/blog/modular-buildings-2/the-upgrade-modular-building-system/#comments</comments>
		<pubDate>Tue, 29 Jan 2013 18:48:06 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Modular Buildings]]></category>
		<category><![CDATA[Modular Equipment Shelters]]></category>
		<category><![CDATA[Prefabricated Components]]></category>
		<category><![CDATA[Video]]></category>

		<guid isPermaLink="false">http://www.whitleyman.com/blog/?p=605</guid>
		<description><![CDATA[The UpGrade Modular Building System is a high-quality, modular, steel-framed structure designed for permanent placement, with the unique ability to be physically relocated multiple times to new sites while maintaining the same quality standards and integrity as a new structure. &#8230; <a href="http://www.whitleyman.com/blog/modular-buildings-2/the-upgrade-modular-building-system/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p>The UpGrade Modular Building System is a high-quality, modular, steel-framed structure designed for permanent placement, with the unique ability to be physically relocated multiple times to new sites while maintaining the same quality standards and integrity as a new structure. Installation requires only a few laborers, an on-site crane, and a concrete slab or screw piers to serve as the foundation for the building. The sections arrive to the site on flat bed trucks, stacked two to three units high. This building is available in two types: an Industrial version and a custom Commercial version.</p>
<p>•40 or 60 foot span<br />
•12 to 24 foot high roof<br />
•Preinstalled electrical systems<br />
•Suitable for both permanent and temporary applications<br />
•Concurrent construction time line allows for rapid completion<br />
•Customizeable finishes and material selections throughout the interior and exterior of the building<br />
•Reduced foundation costs (especially in areas with poor soil conditions).</p>
<h2>The UpGrade Industrial Series</h2>
<p><a href="http://www.whitleyman.com/blog/wp-content/uploads/2013/02/Upgrade-Indust.pdf">Click Here for Case Study</a></p>
<p><iframe src="http://www.youtube.com/embed/CYtmHnF5Nzw" frameborder="0" width="560" height="315"></iframe></p>
<h2>The UpGrade Custom Commercial Series</h2>
<p><a href="http://www.whitleyman.com/blog/wp-content/uploads/2013/02/Upgrade-Commercial.pdf">Click Here for Case Study</a></p>
<p><iframe src="http://www.youtube.com/embed/W1doMobPXFM" frameborder="0" width="560" height="315"></iframe></p>
<p><a class="a2a_dd a2a_target addtoany_share_save" href="http://www.addtoany.com/share_save#url=http%3A%2F%2Fwww.whitleyman.com%2Fblog%2Fmodular-buildings-2%2Fthe-upgrade-modular-building-system%2F&amp;title=The%20UpGrade%20Modular%20Building%20System" id="wpa2a_4"><img src="http://www.whitleyman.com/blog/wp-content/plugins/add-to-any/share_save_171_16.png" width="171" height="16" alt="The UpGrade Modular Building System"  title="The UpGrade Modular Building System Photo" /></a></p>]]></content:encoded>
			<wfw:commentRss>http://www.whitleyman.com/blog/modular-buildings-2/the-upgrade-modular-building-system/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Modular Press Box Case Study Added</title>
		<link>http://www.whitleyman.com/blog/modular-press-boxes/modular-press-box-case-study-added-2/</link>
		<comments>http://www.whitleyman.com/blog/modular-press-boxes/modular-press-box-case-study-added-2/#comments</comments>
		<pubDate>Fri, 21 Dec 2012 15:39:24 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Modular Press Boxes]]></category>

		<guid isPermaLink="false">http://www.whitleyman.com/blog/?p=593</guid>
		<description><![CDATA[Lake Travis High School Press Box Partnering with American Press Box, Whitley Manufacturing constructed this 4-unit press box to complete the stadium renovation for Lake Travis High School in Austin, Texas.]]></description>
			<content:encoded><![CDATA[<h2>Lake Travis High School Press Box</h2>
<p><a href="http://www.whitleyman.com/casestudies/Press-Boxes/Lake-Travis-High-School-Press-Box"><img class="alignleft size-full wp-image-594" title="modular press box" src="http://www.whitleyman.com/blog/wp-content/uploads/2012/12/laketravis.jpg" alt="Modular Press Box Case Study Added" width="700" height="500" /></a></p>
<p>Partnering with American Press Box, Whitley Manufacturing constructed this 4-unit press box to complete the stadium renovation for Lake Travis High School in Austin, Texas.</p>
<p><a class="a2a_dd a2a_target addtoany_share_save" href="http://www.addtoany.com/share_save#url=http%3A%2F%2Fwww.whitleyman.com%2Fblog%2Fmodular-press-boxes%2Fmodular-press-box-case-study-added-2%2F&amp;title=Modular%20Press%20Box%20Case%20Study%20Added" id="wpa2a_6"><img src="http://www.whitleyman.com/blog/wp-content/plugins/add-to-any/share_save_171_16.png" width="171" height="16" alt="Modular Press Box Case Study Added"  title="Modular Press Box Case Study Added Photo" /></a></p>]]></content:encoded>
			<wfw:commentRss>http://www.whitleyman.com/blog/modular-press-boxes/modular-press-box-case-study-added-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Movable Radiation Treatment Facility</title>
		<link>http://www.whitleyman.com/blog/modular-healthcare-buildings/relocateable-radiation-treatment-facility/</link>
		<comments>http://www.whitleyman.com/blog/modular-healthcare-buildings/relocateable-radiation-treatment-facility/#comments</comments>
		<pubDate>Mon, 26 Nov 2012 19:29:00 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Green Modular Buildings]]></category>
		<category><![CDATA[Modular Buildings]]></category>
		<category><![CDATA[Modular Buildings Gallery]]></category>
		<category><![CDATA[Modular Healthcare Buildings]]></category>
		<category><![CDATA[New Case Studies]]></category>
		<category><![CDATA[modular buildings]]></category>
		<category><![CDATA[modular healthcare buildings]]></category>
		<category><![CDATA[modular medical buildings]]></category>

		<guid isPermaLink="false">http://www.whitleyman.com/blog/?p=565</guid>
		<description><![CDATA[RAD Technology Medical Systems Temporary Radiotherapy Vault (TRV) Through a partnership with RAD Technology and Perkins + Will, Whitley Manufacturing produced an innovative and contemporary facility. This treatment vault was designed to be easily relocated multiple times throughout it&#8217;s lifespan.]]></description>
			<content:encoded><![CDATA[<h2>RAD Technology Medical Systems Temporary Radiotherapy Vault (TRV)</h2>
<p style="text-align: center;"><a href="http://www.whitleyman.com/casestudies/Medical/Temporary-Radiotherapy-Vault-TRV"><img class="aligncenter size-full wp-image-566" title="TRV2" src="http://www.whitleyman.com/blog/wp-content/uploads/2012/11/TRV2.jpg" alt="Movable Radiation Treatment Facility" width="700" height="500" /></a>Through a partnership with RAD Technology and Perkins + Will, Whitley Manufacturing produced an innovative and contemporary facility. This treatment vault was designed to be easily relocated multiple times throughout it&#8217;s lifespan.</p>
<p><a class="a2a_dd a2a_target addtoany_share_save" href="http://www.addtoany.com/share_save#url=http%3A%2F%2Fwww.whitleyman.com%2Fblog%2Fmodular-healthcare-buildings%2Frelocateable-radiation-treatment-facility%2F&amp;title=Movable%20Radiation%20Treatment%20Facility" id="wpa2a_8"><img src="http://www.whitleyman.com/blog/wp-content/plugins/add-to-any/share_save_171_16.png" width="171" height="16" alt="Movable Radiation Treatment Facility"  title="Movable Radiation Treatment Facility Photo" /></a></p>]]></content:encoded>
			<wfw:commentRss>http://www.whitleyman.com/blog/modular-healthcare-buildings/relocateable-radiation-treatment-facility/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>First LEED-Certified Radiation Center</title>
		<link>http://www.whitleyman.com/blog/uncategorized/first-leed-certified-radiation-center/</link>
		<comments>http://www.whitleyman.com/blog/uncategorized/first-leed-certified-radiation-center/#comments</comments>
		<pubDate>Thu, 11 Oct 2012 14:21:32 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Green Modular Buildings]]></category>
		<category><![CDATA[Modular Buildings]]></category>
		<category><![CDATA[Modular Buildings Gallery]]></category>
		<category><![CDATA[Modular Healthcare Buildings]]></category>
		<category><![CDATA[Uncategorized]]></category>
		<category><![CDATA[LEED Modular Buildings]]></category>
		<category><![CDATA[modular buildings]]></category>
		<category><![CDATA[modular case studies]]></category>
		<category><![CDATA[modular healthcare buildings]]></category>

		<guid isPermaLink="false">http://www.whitleyman.com/blog/?p=559</guid>
		<description><![CDATA[Swedish Cancer Institute Radiotherapy Clinic Achieves LEED Silver Whitley Manufacturing is proud to announce the LEED Silver certification of the Swedish Cancer Institute Radiotherapy Clinic. Designed by Perkins + Will and built for RAD Technology Medical Systems, this is the &#8230; <a href="http://www.whitleyman.com/blog/uncategorized/first-leed-certified-radiation-center/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h2>Swedish Cancer Institute Radiotherapy Clinic Achieves LEED Silver</h2>
<p style="text-align: center;"><a href="http://www.whitleyman.com/casestudies/Medical/Swedish-Cancer-Institute-Radiotherapy-Clinic"><img class="aligncenter size-full wp-image-561" title="Swedish Cancer Institute LEED Silver Modular" src="http://www.whitleyman.com/blog/wp-content/uploads/2012/10/sci.jpg" alt="First LEED Certified Radiation Center" width="700" height="500" /></a></p>
<p>Whitley Manufacturing is proud to announce the LEED Silver certification of the Swedish Cancer Institute Radiotherapy Clinic. Designed by Perkins + Will and built for RAD Technology Medical Systems, this is the first building of its kind to achieve LEED certification.</p>
<p><a class="a2a_dd a2a_target addtoany_share_save" href="http://www.addtoany.com/share_save#url=http%3A%2F%2Fwww.whitleyman.com%2Fblog%2Funcategorized%2Ffirst-leed-certified-radiation-center%2F&amp;title=First%20LEED-Certified%20Radiation%20Center" id="wpa2a_10"><img src="http://www.whitleyman.com/blog/wp-content/plugins/add-to-any/share_save_171_16.png" width="171" height="16" alt="First LEED Certified Radiation Center"  title="First LEED Certified Radiation Center Photo" /></a></p>]]></content:encoded>
			<wfw:commentRss>http://www.whitleyman.com/blog/uncategorized/first-leed-certified-radiation-center/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Rolls Royce Office Installation</title>
		<link>http://www.whitleyman.com/blog/modular-buildings-2/rolls-royce-office-installation/</link>
		<comments>http://www.whitleyman.com/blog/modular-buildings-2/rolls-royce-office-installation/#comments</comments>
		<pubDate>Wed, 03 Oct 2012 12:26:05 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Modular Buildings]]></category>
		<category><![CDATA[Modular Buildings Gallery]]></category>
		<category><![CDATA[modular buildings]]></category>
		<category><![CDATA[modular case studies]]></category>
		<category><![CDATA[multi-story modular buildings]]></category>

		<guid isPermaLink="false">http://www.whitleyman.com/blog/?p=549</guid>
		<description><![CDATA[Rolls Royce Office Installation Progress A new two-story office building is being assembled in Mount Vernon, Ohio for Roll-Royce Energy Systems, Inc. Whitley Manufacturing partnered with Satellite to provide Roll-Royce with a nearly 36,000 square foot building to supplement the &#8230; <a href="http://www.whitleyman.com/blog/modular-buildings-2/rolls-royce-office-installation/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h1>Rolls Royce Office Installation Progress</h1>
<p><a href="http://www.whitleyman.com/casestudies/Office-Buildings/Rolls-Royce-Energy-Systems-Inc"><img class="alignleft size-full wp-image-672" title="rollsroyce" src="http://www.whitleyman.com/blog/wp-content/uploads/2012/10/rollsroyce2.jpg" alt="Rolls Royce Office Installation" width="700" height="500" /></a><a href="http://www.whitleyman.com/casestudies/?STUDYID=case_studies1349273228"><br />
</a><span style="color: #000000;">A new two-story office building is being assembled in Mount Vernon, Ohio for Roll-Royce Energy Systems, Inc. Whitley Manufacturing partnered with Satellite to provide Roll-Royce with a nearly 36,000 square foot building to supplement the current office at their manufacturing plant. Progress on the building is moving at a rapid pace. Currently, all 53 of the modules have been installed, and interior close-up work is moving swiftly. The employees can look forward to inhabiting their new office space very soon.</span></p>
<p>&nbsp;</p>
<p><a class="a2a_dd a2a_target addtoany_share_save" href="http://www.addtoany.com/share_save#url=http%3A%2F%2Fwww.whitleyman.com%2Fblog%2Fmodular-buildings-2%2Frolls-royce-office-installation%2F&amp;title=Rolls%20Royce%20Office%20Installation" id="wpa2a_12"><img src="http://www.whitleyman.com/blog/wp-content/plugins/add-to-any/share_save_171_16.png" width="171" height="16" alt="Rolls Royce Office Installation"  title="Rolls Royce Office Installation Photo" /></a></p>]]></content:encoded>
			<wfw:commentRss>http://www.whitleyman.com/blog/modular-buildings-2/rolls-royce-office-installation/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Modular Classrooms Case Study Added</title>
		<link>http://www.whitleyman.com/blog/uncategorized/modular-classrooms-case-study-added/</link>
		<comments>http://www.whitleyman.com/blog/uncategorized/modular-classrooms-case-study-added/#comments</comments>
		<pubDate>Tue, 01 May 2012 15:48:57 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Modular Buildings]]></category>
		<category><![CDATA[Modular School Buildings]]></category>
		<category><![CDATA[New Case Studies]]></category>
		<category><![CDATA[Uncategorized]]></category>
		<category><![CDATA[modular buildings]]></category>
		<category><![CDATA[modular schools]]></category>
		<category><![CDATA[sustainable modular buildings]]></category>

		<guid isPermaLink="false">http://www.whitleyman.com/blog/?p=529</guid>
		<description><![CDATA[Modular School Buildings New Case Study added for a pair of custom modular classrooms buildings constructed by our Marysville, WA production facility.  Located at a Washington State Department of Health and Social Services detention site for male and female juvenile &#8230; <a href="http://www.whitleyman.com/blog/uncategorized/modular-classrooms-case-study-added/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h1>Modular School Buildings</h1>
<p><a href="http://www.whitleyman.com/casestudies/Schools/Echo-Glen-Modular-Classroom"><img class="alignleft size-full wp-image-530" title="echoglen" src="http://www.whitleyman.com/blog/wp-content/uploads/2012/05/echoglen.jpg" alt="Modular Classrooms Case Study Added" width="700" height="500" /></a></p>
<p>New Case Study added for a pair of custom modular classrooms buildings constructed by our Marysville, WA production facility.  Located at a Washington State Department of Health and Social Services detention site for male and female juvenile offenders, the modular classroom was largely built off-site &#8211; even the pitched roof modules with clerestory windows were prefabricated in our factory.</p>
<p>The building also features extensive custom casework, efficient lighting and HVAC systems, and an attractive complimentary exterior.</p>
<p><strong>Read more about this <a href="http://www.whitleyman.com/casestudies/?STUDYID=case_studies1335882998">custom modular classroom building</a>.</strong></p>
<p>Partner:  <a href="http://www.pacificmobile.com/">Pacific Mobile</a></p>
<p><a class="a2a_dd a2a_target addtoany_share_save" href="http://www.addtoany.com/share_save#url=http%3A%2F%2Fwww.whitleyman.com%2Fblog%2Funcategorized%2Fmodular-classrooms-case-study-added%2F&amp;title=Modular%20Classrooms%20Case%20Study%20Added" id="wpa2a_14"><img src="http://www.whitleyman.com/blog/wp-content/plugins/add-to-any/share_save_171_16.png" width="171" height="16" alt="Modular Classrooms Case Study Added"  title="Modular Classrooms Case Study Added Photo" /></a></p>]]></content:encoded>
			<wfw:commentRss>http://www.whitleyman.com/blog/uncategorized/modular-classrooms-case-study-added/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Modular Press Box Case Study Added</title>
		<link>http://www.whitleyman.com/blog/modular-school-buildings/modular-press-box-case-study-added/</link>
		<comments>http://www.whitleyman.com/blog/modular-school-buildings/modular-press-box-case-study-added/#comments</comments>
		<pubDate>Tue, 01 May 2012 15:39:01 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Modular Buildings]]></category>
		<category><![CDATA[Modular Press Boxes]]></category>
		<category><![CDATA[Modular School Buildings]]></category>
		<category><![CDATA[New Case Studies]]></category>
		<category><![CDATA[Prefabricated Components]]></category>
		<category><![CDATA[modular buildings]]></category>
		<category><![CDATA[modular case studies]]></category>
		<category><![CDATA[modular press boxes]]></category>

		<guid isPermaLink="false">http://www.whitleyman.com/blog/?p=524</guid>
		<description><![CDATA[Modular Press Boxes New Case Study added for a custom designed modular press box for Archbishop McNicholas High School in Cincinnati, Ohio. The building features a custom 12&#8242;-0&#8243; width (a 50% increase in space over standard 8&#8242;-0&#8243; wide press boxes), custom &#8230; <a href="http://www.whitleyman.com/blog/modular-school-buildings/modular-press-box-case-study-added/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.whitleyman.com/casestudies/Press-Boxes/McNicholas-HS-Custom-Press-Box"><img class="alignleft size-full wp-image-525" title="mcnicholas" src="http://www.whitleyman.com/blog/wp-content/uploads/2012/05/mcnicholas.jpg" alt="Modular Press Box Case Study Added" width="700" height="500" /></a></p>
<h1>Modular Press Boxes</h1>
<p>New Case Study added for a custom designed modular press box for <a href="http://www.mcnhs.org">Archbishop McNicholas High School</a> in Cincinnati, Ohio.</p>
<p>The building features a custom 12&#8242;-0&#8243; width (a 50% increase in space over standard 8&#8242;-0&#8243; wide press boxes), custom glazing systems to insure optimal sightlines and provide a true Full Field View.  In addition, the building features covered entries and film platforms, two private coaches / coordinator&#8217;s rooms with interior windows to preserve sight lines, and a raised viewing area platform that serves a dual function, also overlooking the softball field to the rear.</p>
<h2><strong>Read more about this custom <a href="http://www.whitleyman.com/casestudies/?STUDYID=case_studies1335797721">modular press box</a>.</strong></h2>
<p>Project Partners:  <a href="http://www.sightlinesinc.com/">Sightlines, Inc.</a> + <a href="http://www.outdooraluminum.com/">Outdoor Aluminum</a></p>
<p><a class="a2a_dd a2a_target addtoany_share_save" href="http://www.addtoany.com/share_save#url=http%3A%2F%2Fwww.whitleyman.com%2Fblog%2Fmodular-school-buildings%2Fmodular-press-box-case-study-added%2F&amp;title=Modular%20Press%20Box%20Case%20Study%20Added" id="wpa2a_16"><img src="http://www.whitleyman.com/blog/wp-content/plugins/add-to-any/share_save_171_16.png" width="171" height="16" alt="Modular Press Box Case Study Added"  title="Modular Press Box Case Study Added Photo" /></a></p>]]></content:encoded>
			<wfw:commentRss>http://www.whitleyman.com/blog/modular-school-buildings/modular-press-box-case-study-added/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Modular Charter School Awards</title>
		<link>http://www.whitleyman.com/blog/uncategorized/award-winning-modular-charter-schools/</link>
		<comments>http://www.whitleyman.com/blog/uncategorized/award-winning-modular-charter-schools/#comments</comments>
		<pubDate>Mon, 09 Apr 2012 20:02:13 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.whitleyman.com/blog/?p=495</guid>
		<description><![CDATA[Modular Charter Schools Whitley Manufacturing is proud to announce that we were recently selected as the recipient of two Awards of Distinction from the Modular Building Institute honoring a pair of modular charter school buildings. Cambridge Lakes Learning Center (CLLC) &#8230; <a href="http://www.whitleyman.com/blog/uncategorized/award-winning-modular-charter-schools/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h1>Modular Charter Schools</h1>
<p><a href="http://www.whitleyman.com">Whitley Manufacturing</a> is proud to announce that we were recently selected as the recipient of two Awards of Distinction from the <a href="http://modular.org/">Modular Building Institute</a> honoring a pair of modular charter school buildings.</p>
<p><a href="http://www.whitleyman.com/casestudies/Schools/Cambridge-Lakes-Modular-Charter-School"><img class="alignleft size-full wp-image-504" title="pingree-mbi-winner" src="http://www.whitleyman.com/blog/wp-content/uploads/2012/04/pingree-mbi-winner.jpg" alt="Modular Charter School Awards" width="500" height="325" /></a></p>
<p><strong>Cambridge Lakes Learning Center (CLLC) wins <a href="http://modular.org/Awards/AwardEntryDetail.aspx?awardentryid=930">First Place for Permanent Education Facilities Over 10,000 SFT</a>.  </strong></p>
<p><a href="http://www.whitleyman.com/casestudies/Schools/Old-Redford-Academy-Middle-School"><img class="alignleft size-full wp-image-506" title="ora-redes" src="http://www.whitleyman.com/blog/wp-content/uploads/2012/04/ora-redes.jpg" alt="Modular Charter School Awards" width="500" height="325" /></a></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><strong>Old Redford Academy wins <a href="http://modular.org/Awards/AwardEntryDetail.aspx?awardentryid=868">Honorable Mention for Permanent Education Facilities Over 10,000 SFT</a></strong><strong>.</strong></p>
<p>These Awards make clear the dawning realization that modular buildings offer distinct advantages to both charter schools and public schools by providing sustainable and durable commercial space, all delivered on an accelerated timeline.  The flexibility of modular construction allows schools to create &#8216;scalable&#8217; buildings with the option for future relocation or addition.</p>
<p>Read the Case Study on CLLC&#8217;s <a href="http://www.whitleyman.com/casestudies/Schools/Cambridge-Lakes-Modular-Charter-School">Modular Charter School Campus</a>.</p>
<p>Read the Case Study on Old Redford&#8217;s <a href="http://www.whitleyman.com/casestudies/Schools/Old-Redford-Academy-Middle-School">Modular Charter School Addition</a>.</p>
<p><a class="a2a_dd a2a_target addtoany_share_save" href="http://www.addtoany.com/share_save#url=http%3A%2F%2Fwww.whitleyman.com%2Fblog%2Funcategorized%2Faward-winning-modular-charter-schools%2F&amp;title=Modular%20Charter%20School%20Awards" id="wpa2a_18"><img src="http://www.whitleyman.com/blog/wp-content/plugins/add-to-any/share_save_171_16.png" width="171" height="16" alt="Modular Charter School Awards"  title="Modular Charter School Awards Photo" /></a></p>]]></content:encoded>
			<wfw:commentRss>http://www.whitleyman.com/blog/uncategorized/award-winning-modular-charter-schools/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>WM President Inducted into Modular Building Hall-of-Fame</title>
		<link>http://www.whitleyman.com/blog/modular-reference-information/wm-president-inducted-into-modular-building-hall-of-fame/</link>
		<comments>http://www.whitleyman.com/blog/modular-reference-information/wm-president-inducted-into-modular-building-hall-of-fame/#comments</comments>
		<pubDate>Mon, 09 Apr 2012 19:05:27 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Modular Buildings]]></category>
		<category><![CDATA[Reference Information]]></category>
		<category><![CDATA[modular buildings]]></category>
		<category><![CDATA[whitley manufacturing]]></category>

		<guid isPermaLink="false">http://www.whitleyman.com/blog/?p=490</guid>
		<description><![CDATA[Modular Building Executive Inducted into Hall of Fame South Whitley, Indiana.  April 6, 2012.  The Modular Building Institute (MBI) held its annual conference last week in Orlando, Florida.  Labeled &#8220;World of Modular&#8221; the event recognizes the industry&#8217;s past year of achievements, &#8230; <a href="http://www.whitleyman.com/blog/modular-reference-information/wm-president-inducted-into-modular-building-hall-of-fame/">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<h1>Modular Building Executive Inducted into Hall of Fame</h1>
<p>South Whitley, Indiana.  April 6, 2012.  The <a href="http://modular.org/">Modular Building Institute</a> (MBI) held its annual conference last week in Orlando, Florida.  Labeled &#8220;World of Modular&#8221; the event recognizes the industry&#8217;s past year of achievements, honoring both projects and people.  Through the &#8220;Hall of Fame&#8221; award, MBI seeks to recognize the contributions of those whose careers are, or were, dedicated to the modular construction industry or whose acts have had a significant impact on the careers of all others involved.  This year&#8217;s inductee, Simon Dragan (President / CEO and owner of <a href="http://www.whitleyman.com">Whitley Manufacturing</a>), with over 30 years in the industry, has influenced the careers of employees and colleagues alike, along with significant contributions to the industry.</p>
<p>Mr. Dragan escaped Romania during its dictatorship in 1969 and found himself in a refugee camp seeking a new country to call home.  While Mr. Dragan could have left sooner for other countries, he waited for the opportunity to enter the United States.  &#8221;In America,&#8221; Mr. Dragan explained, &#8220;I had the opportunity to succeed or fail on the merits of my own efforts.  Despite a language problem, different customs, and just $10.00 in my pocket, the American Dream encouraged me to succeed.  Doors for opportunity are open in America.&#8221;</p>
<p><a href="http://www.whitleyman.com">Whitley Manufacturing</a> has been located in South Whitley since the close of World War Two with an initial goal of providing returning veterans with homes.  Over the subsequent decades, the company changed focus to providing <a href="http://www.whitleyman.com/blog/modular-buildings-gallery/">commercial modular buildings</a> and was acquired by Williams Mobile in 1971, until it was purchased by Mr. Dragan in 1993.</p>
<p>When he arrived in the country in 1972, he was hired as a draftsman by a Baltimore, Maryland firm engaged in the modular industry.  He was later hired by Williams Mobile (now <a href="http://www.willscot.com">Williams-Scotsman</a>), where his career grew and led to the opportunity to purchase the Whitley Manufacturing flagship factory.  Mr. Dragan singled out Barry Gossett, former CEO of Williams-Scotsman, as a key mentor and his reason for embracing the industry he has been honored by.</p>
<p>Whitley Manufacturing now includes three factories with the acquisition of Evergreen Mobile (Marysville, WA) in 1999 and a second Midwest factory location (Rochester, IN).  Whitley and its associated businesses typically employ over 250 including tradesmen, factory workers, design and engineering staff, and management team.  Mr. Dragan elaborated on the contribution of his employees, &#8220;I have succeeded because of my employees, many who have been with me for over 20 years.  I thank them for their hard work and dedication to our industry.&#8221;  The firm (headquartered in South Whitley, IN) has produced countless projects in over 40 states and overseas.  Whitley has won over 50 &#8220;Awards of Distinction&#8221; from the MBI for their excellence in the modular construction marketplace.</p>
<p>Please join us in congratulating Mr. Dragan on the well-deserved honor!</p>
<p><strong>Learn more about the <a href="http://modular.org/HtmlPage.aspx?name=about_mbi">Modular Building Institute</a>.</strong></p>
<p><strong>Learn more about <a href="http://www.whitleyman.com/about.html">Whitley Manufacturing</a>.</strong></p>
<p><a class="a2a_dd a2a_target addtoany_share_save" href="http://www.addtoany.com/share_save#url=http%3A%2F%2Fwww.whitleyman.com%2Fblog%2Fmodular-reference-information%2Fwm-president-inducted-into-modular-building-hall-of-fame%2F&amp;title=WM%20President%20Inducted%20into%20Modular%20Building%20Hall-of-Fame" id="wpa2a_20"><img src="http://www.whitleyman.com/blog/wp-content/plugins/add-to-any/share_save_171_16.png" width="171" height="16" alt="WM President Inducted into Modular Building Hall of Fame"  title="WM President Inducted into Modular Building Hall of Fame Photo" /></a></p>]]></content:encoded>
			<wfw:commentRss>http://www.whitleyman.com/blog/modular-reference-information/wm-president-inducted-into-modular-building-hall-of-fame/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
