<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" media="screen" href="/~d/styles/rss2full.xsl"?><?xml-stylesheet type="text/css" media="screen" href="http://feeds.feedburner.com/~d/styles/itemcontent.css"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:feedburner="http://rssnamespace.org/feedburner/ext/1.0" version="2.0" xml:base="http://keller-geotechnique.co.uk">
<channel>
 <title>Keller Geotechnique</title>
 <link>http://keller-geotechnique.co.uk</link>
 <description />
 <language>en</language>
<atom10:link xmlns:atom10="http://www.w3.org/2005/Atom" rel="self" type="application/rss+xml" href="http://feeds.feedburner.com/kellergeotechnique" /><feedburner:info uri="kellergeotechnique" /><atom10:link xmlns:atom10="http://www.w3.org/2005/Atom" rel="hub" href="http://pubsubhubbub.appspot.com/" /><item>
 <title>Crossrail Team Move from Alton to London</title>
 <link>http://feedproxy.google.com/~r/kellergeotechnique/~3/DnCIKzAUitE/crossrail-team-move-alton-london</link>
 <description>&lt;p&gt;Following awards of both grouting and instrumentation contracts from BAM Ferrovial Kier (BFK) Kellers staff in Alton office have now set up site offices in London to look after these important projects. Phil Ball, Managing Director of Keller Geotechnique, said "some of our guys from Alton were the obvious choice and so we are now handling other enquiries from our Wetherby and St Helens offices. There is always somebody around London so the service in the South should remain unchanged.&lt;/p&gt;
&lt;div class="field field-type-filefield field-field-image"&gt;
      &lt;div class="field-label"&gt;Images:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="275" height="183" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/news/images%5B6%5D.jpg?1317248812" /&gt;        &lt;/div&gt;
              &lt;div class="field-item even"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="274" height="184" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/news/imagesCAT1ZCAE.jpg?1317248972" /&gt;        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;&lt;a href="http://keller-geotechnique.co.uk/news/crossrail-team-move-alton-london" target="_blank"&gt;read more&lt;/a&gt;&lt;/p&gt;&lt;img src="http://feeds.feedburner.com/~r/kellergeotechnique/~4/DnCIKzAUitE" height="1" width="1"/&gt;</description>
 <pubDate>Wed, 28 Sep 2011 22:36:05 +0000</pubDate>
 <dc:creator>Derek Taylor</dc:creator>
 <guid isPermaLink="false">244 at http://keller-geotechnique.co.uk</guid>
<feedburner:origLink>http://keller-geotechnique.co.uk/news/crossrail-team-move-alton-london</feedburner:origLink></item>
<item>
 <title>Heathrow Terminal 2B Ground Anchorage Team Congratulated </title>
 <link>http://feedproxy.google.com/~r/kellergeotechnique/~3/51WbEl07_yA/heathrow-terminal-2b-ground-anchorage-team-congratulated</link>
 <description>&lt;p&gt;At the new Terminal 2 at Heathrow the supply chain have achieved over a million man hours without a RIDDOR accident. At this site Keller Geotechnique are installing a number of single bore multiple anchors, (SBMA, )to retain deep bored pile wall excavations.Keller have a "Think Safe" programme similar to Balfour Beatty's Zero Harm policy and we are pleased to make a positive contribution on a project where safety is so high on the agenda.&lt;/p&gt;
&lt;div class="field field-type-filefield field-field-image"&gt;
      &lt;div class="field-label"&gt;Images:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="1024" height="681" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/news/LHR%20T2B%20%28Custom%29.jpg?1312758143" /&gt;        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;&lt;a href="http://keller-geotechnique.co.uk/news/heathrow-terminal-2b-ground-anchorage-team-congratulated" target="_blank"&gt;read more&lt;/a&gt;&lt;/p&gt;&lt;img src="http://feeds.feedburner.com/~r/kellergeotechnique/~4/51WbEl07_yA" height="1" width="1"/&gt;</description>
 <category domain="http://keller-geotechnique.co.uk/tags/bored-pile-walls">bored pile walls</category>
 <category domain="http://keller-geotechnique.co.uk/tags/ground-anchors">ground anchors</category>
 <category domain="http://keller-geotechnique.co.uk/taxonomy/term/31">retaining wall</category>
 <pubDate>Sun, 07 Aug 2011 23:02:34 +0000</pubDate>
 <dc:creator>Derek Taylor</dc:creator>
 <guid isPermaLink="false">243 at http://keller-geotechnique.co.uk</guid>
<feedburner:origLink>http://keller-geotechnique.co.uk/news/heathrow-terminal-2b-ground-anchorage-team-congratulated</feedburner:origLink></item>
<item>
 <title>Latest Contract Award</title>
 <link>http://feedproxy.google.com/~r/kellergeotechnique/~3/Pyv5SIdexFE/latest-contract-award</link>
 <description>&lt;p&gt;&amp;nbsp;&amp;nbsp;Keller UK is pleased to announce that it has signed a &amp;pound;37M contract with Principal Contractor, VINCI BAM Nuttall for the grouting works that form part of the &amp;pound;700M Victoria Underground Station upgrade.&lt;/p&gt;
&lt;div class="field field-type-filefield field-field-image"&gt;
      &lt;div class="field-label"&gt;Images:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="169" height="169" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/news/vsu-new-cardinal-place.jpg?1309426248" /&gt;        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;&lt;a href="http://keller-geotechnique.co.uk/news/latest-contract-award" target="_blank"&gt;read more&lt;/a&gt;&lt;/p&gt;&lt;img src="http://feeds.feedburner.com/~r/kellergeotechnique/~4/Pyv5SIdexFE" height="1" width="1"/&gt;</description>
 <category domain="http://keller-geotechnique.co.uk/tags/bridge">bridge</category>
 <category domain="http://keller-geotechnique.co.uk/taxonomy/term/92">grouting</category>
 <category domain="http://keller-geotechnique.co.uk/taxonomy/term/73">jet grouting</category>
 <category domain="http://keller-geotechnique.co.uk/taxonomy/term/94">soilcrete</category>
 <category domain="http://keller-geotechnique.co.uk/taxonomy/term/95">underpinning</category>
 <pubDate>Thu, 30 Jun 2011 09:43:01 +0000</pubDate>
 <dc:creator>Derek Taylor</dc:creator>
 <guid isPermaLink="false">242 at http://keller-geotechnique.co.uk</guid>
<feedburner:origLink>http://keller-geotechnique.co.uk/news/latest-contract-award</feedburner:origLink></item>
<item>
 <title>Press Release</title>
 <link>http://feedproxy.google.com/~r/kellergeotechnique/~3/tEi1Ga77iOA/press-release</link>
 <description>&lt;p&gt;&lt;strong&gt;Press Release 14.12.09&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;Two of the UK&amp;rsquo;s leading geotechnical contractors, Keller Geotechnical and Systems Geotechnique &amp;nbsp;are to merge&amp;nbsp; in the New Year to form Keller Geotechnique.&lt;/p&gt;
&lt;p&gt;Keller Geotechnique&amp;rsquo;s Managing Director Bob Thompson stated that;&lt;/p&gt;
&lt;p&gt;&amp;ldquo;The merger is the next step in Keller&amp;rsquo;s &amp;ldquo;All Together Now&amp;rdquo; strategy. Together we are able to offer greater choice in the range of geotechnical solutions offered to our customers throughout the UK via our network of local offices.&lt;/p&gt;
&lt;div class="field field-type-filefield field-field-image"&gt;
      &lt;div class="field-label"&gt;Images:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="3420" height="1951" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/news/Keller_geotechnique%20Y.jpg?1272624392" /&gt;        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;&lt;a href="http://keller-geotechnique.co.uk/news/press-release" target="_blank"&gt;read more&lt;/a&gt;&lt;/p&gt;&lt;img src="http://feeds.feedburner.com/~r/kellergeotechnique/~4/tEi1Ga77iOA" height="1" width="1"/&gt;</description>
 <pubDate>Tue, 16 Mar 2010 14:59:50 +0000</pubDate>
 <dc:creator />
 <guid isPermaLink="false">190 at http://keller-geotechnique.co.uk</guid>
<feedburner:origLink>http://keller-geotechnique.co.uk/news/press-release</feedburner:origLink></item>
<item>
 <title>Energy</title>
 <link>http://feedproxy.google.com/~r/kellergeotechnique/~3/NonUOyL2SaU/energy</link>
 <description>&lt;div class="field field-type-text field-field-summary"&gt;
      &lt;div class="field-label"&gt;Summary:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    In the power generation and energy distribution fields, Keller Geotechnique consistently demonstrates a &amp;#039;can do&amp;#039; approach         &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;In the power generation and energy distribution fields, Keller Geotechnique consistently demonstrates a 'can do' approach&amp;nbsp;displaying unrivalled expertise in restricted access piling works inside existing facilities through to employing innvovative ground engineering techniques at both conventional Power Stations and Wind Farms.&lt;/p&gt;
&lt;div class="field field-type-filefield field-field-image"&gt;
      &lt;div class="field-label"&gt;Images:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="2509" height="1789" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/sector/wind%20cov.jpg?1267608622" /&gt;        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;&lt;a href="http://keller-geotechnique.co.uk/market-sector/energy" target="_blank"&gt;read more&lt;/a&gt;&lt;/p&gt;&lt;img src="http://feeds.feedburner.com/~r/kellergeotechnique/~4/NonUOyL2SaU" height="1" width="1"/&gt;</description>
 <pubDate>Wed, 16 Dec 2009 17:23:33 +0000</pubDate>
 <dc:creator>tigerfish</dc:creator>
 <guid isPermaLink="false">179 at http://keller-geotechnique.co.uk</guid>
<feedburner:origLink>http://keller-geotechnique.co.uk/market-sector/energy</feedburner:origLink></item>
<item>
 <title>Infrastructure</title>
 <link>http://feedproxy.google.com/~r/kellergeotechnique/~3/TGRx0T3W1FQ/infrastructure</link>
 <description>&lt;div class="field field-type-text field-field-summary"&gt;
      &lt;div class="field-label"&gt;Summary:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    Accross the infrastructure spectrum there are challenges that have been resolved by Keller Geotechnique in a cost effective and timely manner.         &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;&lt;span style="font-size: small;"&gt;Planning road, rail, airports and sea ports Keller Geotechnique has designed and constructed retaining structures, prevented water ingress to underpasses, built soil nailed slip roads, retaining walls, stabilised under highway mine workings and installed ground anchors through railway bridge embankments.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&lt;span style="font-size: small;"&gt;Flood alleviation projects have also formed part of our portfolio controlling ground water with slurry wall techniques has combined to the success of several river capacity improvements.&lt;/span&gt;&lt;/p&gt;
&lt;div class="field field-type-filefield field-field-image"&gt;
      &lt;div class="field-label"&gt;Images:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="958" height="583" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/sector/Transport..jpg?1269089905" /&gt;        &lt;/div&gt;
              &lt;div class="field-item even"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="1634" height="1136" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/sector/Transport.jpg?1269089894" /&gt;        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;&lt;img src="http://feeds.feedburner.com/~r/kellergeotechnique/~4/TGRx0T3W1FQ" height="1" width="1"/&gt;</description>
 <pubDate>Wed, 16 Dec 2009 17:22:57 +0000</pubDate>
 <dc:creator>tigerfish</dc:creator>
 <guid isPermaLink="false">178 at http://keller-geotechnique.co.uk</guid>
<feedburner:origLink>http://keller-geotechnique.co.uk/market-sector/infrastructure</feedburner:origLink></item>
<item>
 <title>Residential</title>
 <link>http://feedproxy.google.com/~r/kellergeotechnique/~3/wER8iMjiIPs/residential</link>
 <description>&lt;div class="field field-type-text field-field-summary"&gt;
      &lt;div class="field-label"&gt;Summary:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    Keller Geotechnique are sought after by the residential market because of the savings and cost certainty they bring to any project from 4 to 450 units.        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;Keller Geotechnique can offer residential developers innovative solutions that help to maximise developable site areas and bring cost savings to a variety of projects, from a handful of new homes to large, phased construction programmes delivering hundred plus unit schemes.&amp;nbsp;&lt;/p&gt;
&lt;p&gt;In dealing with contaminated land, Brownfield sites can be used cost effectively to build much needed housing either in the private or social housing sectors.&amp;nbsp;&lt;/p&gt;
&lt;div class="field field-type-filefield field-field-image"&gt;
      &lt;div class="field-label"&gt;Images:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="4752" height="3168" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/sector/Corinthia%20Hotel%20010.jpg?1272467433" /&gt;        &lt;/div&gt;
              &lt;div class="field-item even"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="2560" height="1294" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/sector/Residential.JPG?1269089829" /&gt;        &lt;/div&gt;
              &lt;div class="field-item odd"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="3168" height="4752" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/sector/Corinthia%20Hotel%20003.jpg?1272467351" /&gt;        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;&lt;a href="http://keller-geotechnique.co.uk/market-sector/residential" target="_blank"&gt;read more&lt;/a&gt;&lt;/p&gt;&lt;img src="http://feeds.feedburner.com/~r/kellergeotechnique/~4/wER8iMjiIPs" height="1" width="1"/&gt;</description>
 <pubDate>Wed, 16 Dec 2009 17:22:20 +0000</pubDate>
 <dc:creator>tigerfish</dc:creator>
 <guid isPermaLink="false">177 at http://keller-geotechnique.co.uk</guid>
<feedburner:origLink>http://keller-geotechnique.co.uk/market-sector/residential</feedburner:origLink></item>
<item>
 <title>Leisure</title>
 <link>http://feedproxy.google.com/~r/kellergeotechnique/~3/1ghsLIiWSIg/leisure</link>
 <description>&lt;div class="field field-type-text field-field-summary"&gt;
      &lt;div class="field-label"&gt;Summary:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    Leisure projects across the UK have featured predominantly in Keller Geotechniques portfolio        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;&lt;span style="font-family: Verdana; color: black;"&gt;&lt;span style="font-size: small;"&gt;Leisure projects across the UK have featured predominantly in Keller Geotechniques portfolio. Ground Anchorages, Slurry Walls, Soil Mixing, Jet Grouting and Dry Soil Mixing have all been employed to assist in solving our clients ground improvement challenges. &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
&lt;div class="field field-type-filefield field-field-image"&gt;
      &lt;div class="field-label"&gt;Images:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="4752" height="2368" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/sector/Leisure.jpg?1269089753" /&gt;        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;&lt;a href="http://keller-geotechnique.co.uk/market-sector/leisure" target="_blank"&gt;read more&lt;/a&gt;&lt;/p&gt;&lt;img src="http://feeds.feedburner.com/~r/kellergeotechnique/~4/1ghsLIiWSIg" height="1" width="1"/&gt;</description>
 <pubDate>Wed, 16 Dec 2009 17:21:12 +0000</pubDate>
 <dc:creator>tigerfish</dc:creator>
 <guid isPermaLink="false">176 at http://keller-geotechnique.co.uk</guid>
<feedburner:origLink>http://keller-geotechnique.co.uk/market-sector/leisure</feedburner:origLink></item>
<item>
 <title>Public</title>
 <link>http://feedproxy.google.com/~r/kellergeotechnique/~3/8s3QJyBP_6k/public</link>
 <description>&lt;div class="field field-type-text field-field-summary"&gt;
      &lt;div class="field-label"&gt;Summary:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    As cost pressures on public projects increase the innovative and sustainable solutions to these schemes become more important.         &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;As cost pressures on public projects increase the innovative and sustainable solutions to these schemes become more important.&lt;/p&gt;
&lt;div class="field field-type-filefield field-field-image"&gt;
      &lt;div class="field-label"&gt;Images:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="4752" height="3168" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/sector/Thrandeston1.jpg?1267608290" /&gt;        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;&lt;img src="http://feeds.feedburner.com/~r/kellergeotechnique/~4/8s3QJyBP_6k" height="1" width="1"/&gt;</description>
 <pubDate>Wed, 16 Dec 2009 17:03:20 +0000</pubDate>
 <dc:creator>tigerfish</dc:creator>
 <guid isPermaLink="false">175 at http://keller-geotechnique.co.uk</guid>
<feedburner:origLink>http://keller-geotechnique.co.uk/market-sector/public</feedburner:origLink></item>
<item>
 <title>Industrial</title>
 <link>http://feedproxy.google.com/~r/kellergeotechnique/~3/69es7W8r_uw/industrial</link>
 <description>&lt;div class="field field-type-text field-field-summary"&gt;
      &lt;div class="field-label"&gt;Summary:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    In both new build and redevelopment of industrial premises Keller Geotechnique can demonstrate a substantial track record.        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;In both new build and redevelopment of existing premises Keller Geotechnique can demonstrate a substantial track record of successfully designing and constructing the right engineered solution.&amp;nbsp;&lt;/p&gt;
&lt;p&gt;Heavy duty machinery or storage racking upgraded to meet new production demands can impose loads over the original design loadings for floor slabs causing failures. Such failures create delays in production or prevent facility enhancers such as Mezzanine floor installation.&amp;nbsp;&lt;/p&gt;
&lt;div class="field field-type-filefield field-field-image"&gt;
      &lt;div class="field-label"&gt;Images:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    &lt;img  class="imagefield imagefield-field_image" width="4752" height="3168" alt="" src="http://keller-geotechnique.co.uk/files/keller-geotechnique/sector/industrial%20geo.jpg?1271173782" /&gt;        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;div class="field field-type-nodereference field-field-technique"&gt;
      &lt;div class="field-label"&gt;Techniques:&amp;nbsp;&lt;/div&gt;
    &lt;div class="field-items"&gt;
            &lt;div class="field-item odd"&gt;
                    &lt;a href="/technique/permeable-reactive-barriers"&gt;Permeable Reactive Barriers&lt;/a&gt;        &lt;/div&gt;
        &lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;&lt;a href="http://keller-geotechnique.co.uk/market-sector/industrial" target="_blank"&gt;read more&lt;/a&gt;&lt;/p&gt;&lt;img src="http://feeds.feedburner.com/~r/kellergeotechnique/~4/69es7W8r_uw" height="1" width="1"/&gt;</description>
 <pubDate>Wed, 16 Dec 2009 16:56:49 +0000</pubDate>
 <dc:creator>tigerfish</dc:creator>
 <guid isPermaLink="false">174 at http://keller-geotechnique.co.uk</guid>
<feedburner:origLink>http://keller-geotechnique.co.uk/market-sector/industrial</feedburner:origLink></item>
</channel>
</rss>

