<?xml version='1.0' encoding='UTF-8'?><?xml-stylesheet href="http://www.blogger.com/styles/atom.css" type="text/css"?><feed xmlns='http://www.w3.org/2005/Atom' xmlns:openSearch='http://a9.com/-/spec/opensearchrss/1.0/' xmlns:blogger='http://schemas.google.com/blogger/2008' xmlns:georss='http://www.georss.org/georss' xmlns:gd="http://schemas.google.com/g/2005" xmlns:thr='http://purl.org/syndication/thread/1.0'><id>tag:blogger.com,1999:blog-1921807992956805860</id><updated>2020-09-20T00:49:52.826-07:00</updated><category term="Method Statement"/><category term="Plan"/><category term="Procedure"/><category term="JSA"/><category term="Checklist"/><category term="Risk Assessment"/><title type='text'>HSE TECHS</title><subtitle type='html'>In this blog, we are sharing some of these HSE &amp;amp; Construction management practices to ensure effective management of Health, Safety and Environment at work places. Management practices includes Job Safety Analysis, Risk Assessments, Environmental Impact Assessments, Health Risk Assessment, Training Program Tools etc.</subtitle><link rel='http://schemas.google.com/g/2005#feed' type='application/atom+xml' href='https://www.hsetechs.info/feeds/posts/default'/><link rel='self' type='application/atom+xml' href='https://www.blogger.com/feeds/1921807992956805860/posts/default?max-results=3&amp;redirect=false'/><link rel='alternate' type='text/html' href='https://www.hsetechs.info/'/><link rel='hub' href='http://pubsubhubbub.appspot.com/'/><link rel='next' type='application/atom+xml' href='https://www.blogger.com/feeds/1921807992956805860/posts/default?start-index=4&amp;max-results=3&amp;redirect=false'/><author><name>HSE TECHS</name><uri>http://www.blogger.com/profile/06847513261058594841</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><generator version='7.00' uri='http://www.blogger.com'>Blogger</generator><openSearch:totalResults>25</openSearch:totalResults><openSearch:startIndex>1</openSearch:startIndex><openSearch:itemsPerPage>3</openSearch:itemsPerPage><entry><id>tag:blogger.com,1999:blog-1921807992956805860.post-1645968343746261980</id><published>2020-08-26T08:06:00.000-07:00</published><updated>2020-08-26T08:06:01.112-07:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="Procedure"/><title type='text'></title><content type='html'>&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;&lt;b&gt;&amp;nbsp;1.&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;INTRODUCTION&lt;/b&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;The Cost Management Plan clearly defines how the costs on a project will be managed throughout the project’s life cycle.&amp;nbsp; It sets the format and standards by which the project costs are measured, reported and controlled.&amp;nbsp; The Cost Management Plan&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Identifies who is responsible for managing costs&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Identifies who has the authority to approve changes to the project or its budget&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;How cost performance is quantitatively measured and reported upon&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Report formats, frequency and to whom they are presented&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;The Project Manager will be responsible for managing and reporting on the project’s cost throughout the duration of the project.&amp;nbsp; During the monthly project status meeting, the Project Manager will meet with management to present and review the project’s cost performance for the preceding month.&amp;nbsp; Performance will be measured using earned value.&amp;nbsp; The Project Manager is responsible for accounting for cost deviations and presenting the Project Sponsor with options for getting the project back on budget.&amp;nbsp; The Project Sponsor has the authority to make changes to the project to bring it back within budget.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;2.&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;COST MANAGEMENT APPROACH&amp;nbsp;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;We chose to create Cost Accounts at the fourth level of the WBS as an example since many project management offices don’t have a Project Management Information System.&amp;nbsp; If you are using a Project Management Information System then you can, and should, manage costs down to the work package level.&amp;nbsp; For those who don’t have a Project Management Information System you’ll want to determine which level of the WBS you can most effectively manage the project’s costs from.&amp;nbsp; The further down in the WBS you go, the more detailed your cost management is.&amp;nbsp; However, you should balance the granularity at which you want to manage costs against the amount of effort it takes to manage at that level.&amp;nbsp; The more granular your cost management, the more work is necessary to manage it.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Costs for this project will be managed at the fourth level of the Work Breakdown Structure (WBS).&amp;nbsp; Control Accounts (CA) will be created at this level to track costs.&amp;nbsp; Earned Value calculations for the CA’s will measure and manage the financial performance of the project.&amp;nbsp; Although activity cost estimates are detailed in the work packages, the level of accuracy for cost management is at the fourth level of the WBS.&amp;nbsp; Credit for work will be assigned at the work package level.&amp;nbsp; Work started on work packages will grant that work package with 50% credit; whereas, the remaining 50% is credited upon completion of all work defined in that work package.&amp;nbsp; Costs may be rounded to the nearest dollar and work hours rounded to the nearest whole hour.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Cost variances of +/- 0.1 in the cost and schedule performance indexes will change the status of the cost to cautionary; as such, those values will be changed to yellow in the project status reports.&amp;nbsp; Cost variances of +/- 0.2 in the cost and schedule performance indexes will change the status of the cost to an alert stage; as such, those values will be changed to red in the project status reports.&amp;nbsp; This will require corrective action from the Project Manager in order to bring the cost and/or schedule performance indexes below the alert level.&amp;nbsp; Corrective actions will require a project change request and be must approved by the Project Sponsor before it can become within the scope of the project.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;3.&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;MEASURING PROJECT COSTS&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;The PMBOK focuses on Earned Value Management for measuring and controlling a project’s costs.&amp;nbsp; Earned Value Management is a broad and powerful tool; as such, we recommend that all project managers take some formal courses in Earned Value Management.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;In this section you should detail how you will measure the project costs.&amp;nbsp; What Earned Value measurements will be captured and reported upon.&amp;nbsp; Will you use any tools, such as project management software, to assist in capturing Earned Value metrics?&amp;nbsp; How will you forecast future project costs?&amp;nbsp; Will you review cost performance over time, across work packages or schedule activities?&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Our example in this section measures four Earned Value measurements; Schedule Variance (SV), Cost Variance (CV), Schedule Performance Index (SPI) and Cost Performance Index (CPI).&amp;nbsp; For most typical projects these four measurements can provide enough insight for effective management without overburdening the Project Manager with Earned Value calculations and measurements.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Schedule Variance (SV) is a measurement of the schedule performance for a project.&amp;nbsp; It’s calculated by taking the Earned Value (EV) and subtracting the Planned Value (PV).&amp;nbsp; Since EV is the actual value earned in the project and the PV is the value our project plan says we should have earned at this point, when we subtract what we planned from the actual we have a good measurement which tells us if we are ahead or behind the baseline schedule according to our project plan.&amp;nbsp; If SV is zero, then the project is perfectly on schedule.&amp;nbsp; If SV is greater than zero, the project is earning more value than planned thus it’s ahead of schedule.&amp;nbsp; If SV is less than zero, the project is earning less value than planned thus it’s behind schedule.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Cost Variance (CV) is a measurement of the budget performance for a project.&amp;nbsp; CV is calculated by subtracting Actual Costs (AC) from Earned Value (EV).&amp;nbsp; As we already know, EV is the actual value earned in the project.&amp;nbsp; AC is the actual costs incurred to date, thus when we subtract what our actual costs from the EV we have a good measurement which tells us if we are above or below budget.&amp;nbsp; If CV is zero, then the project is perfectly on budget.&amp;nbsp; If CV is greater than zero, the project is earning more value than planned thus it’s under budget.&amp;nbsp; If CV is less than zero, the project is earning less value than planned thus it’s over budget.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;&lt;br /&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Schedule Performance Index (SPI) measures the progress achieved against that which was planned.&amp;nbsp; SPI is calculated as EV/PV.&amp;nbsp; If EV is equal to PV the value of the SPI is 1.&amp;nbsp; If EV is less than the PV then the value is less than 1, which means the project is behind schedule.&amp;nbsp; If EV is greater than the PV the value of the SPI is greater than one, which means the project is ahead of schedule.&amp;nbsp; A well performing project should have its SPI as close to 1 as possible, or maybe even a little under 1.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Cost Performance Index (CPI) measures the value of the work completed compared to the actual cost of the work completed.&amp;nbsp; CPI is calculated as EV/AC.&amp;nbsp; If CPI is equal to 1 the project is perfectly on budget.&amp;nbsp; If the CPI is greater than 1 the project is under budget, if it’s less than 1 the project is over budget.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Performance of the project will be measured using Earned Value Management.&amp;nbsp; The following four Earned Value metrics will be used to measure to projects cost performance:&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Schedule Variance (SV)&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Cost Variance (CV)&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Schedule Performance Index (SPI)&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Cost Performance Index (CPI)&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;If the Schedule Performance Index or Cost Performance Index has a variance of between 0.1 and 0.2 the Project Manager must report the reason for the exception.&amp;nbsp; If the SPI or CPI has a variance of greater than 0.2 the Project Manager must report the reason for the exception and provide management a detailed corrective plan to bring the projects performance back to acceptable levels.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;4.&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;REPORTING FORMAT&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Reporting for cost management will be included in the monthly project status report.&amp;nbsp; The Monthly Project Status Report will include a section labeled, “Cost Management”.&amp;nbsp; This section will contain the Earned Value Metrics identified in the previous section.&amp;nbsp; All cost variances outside of the thresholds identified in this Cost Management Plan will be reported on including any corrective actions which are planned.&amp;nbsp; Change Requests which are triggered based upon project cost overruns will be identified and tracked in this report.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;5.&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;COST VARIANCE RESPONSE PROCESS&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;This section of the Cost Management Plan defines the control thresholds for the project and what actions will be taken if the project triggers a control threshold.&amp;nbsp; As a part of the response process the Project Manager typically presents options for corrective action to the Project Sponsor who will then approve an appropriate action in order to bring the project back on budget.&amp;nbsp; The Project Manager may propose to increase the budget for the project, reduce scope or quality, or some other corrective action.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;The Control Thresholds for this project is a CPI or SPI of less than 0.8 or greater than 1.2.&amp;nbsp; If the project reaches one of these Control Thresholds a Cost Variance Corrective Action Plan is required.&amp;nbsp; The Project Manager will present the Project Sponsor with options for corrective actions within five business days from when the cost variance is first reported.&amp;nbsp; Within three business days from when the Project Sponsor selects a corrective action option, the Project Manager will present the Project Sponsor with a formal Cost Variance Corrective Action Plan.&amp;nbsp; The Cost Variance Corrective Action Plan will detail the actions necessary to bring the project back within budget and the means by which the effectiveness of the actions in the plan will be measured.&amp;nbsp; Upon acceptance of the Cost Variance Corrective Action Plan it will become a part of the project plan and the project will be updated to reflect the corrective actions.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;6.&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;COST CHANGE CONTROL PROCESS&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Typically, the change control process follows the project change control process.&amp;nbsp; If there are special requirements for the cost change control process, they should be detailed in this section.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;The cost change control process will follow the established project change request process.&amp;nbsp; Approvals for project budget/cost changes must be approved by the project sponsor.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;7.&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;PROJECT BUDGET&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;The budget for this project is detailed below.&amp;nbsp; Costs for this project are presented in various categories...&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Fixed Costs:&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; $xxx,xxx.xx&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Material Costs&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; $xxx,xxx.xx&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Contractor Costs&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; $xxx,xxx.xx&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Total Project Cost&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; $xxx,xxx.xx&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Management Reserve&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt; $x,xxx.xx&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;8.&lt;span style=&quot;white-space: pre;&quot;&gt;	&lt;/span&gt;SPONSOR ACCEPTANCE&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Approved by the Project Sponsor:&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;br /&gt;&lt;/p&gt;</content><link rel='replies' type='application/atom+xml' href='https://www.hsetechs.info/feeds/1645968343746261980/comments/default' title='Post Comments'/><link rel='replies' type='text/html' href='https://www.hsetechs.info/2020/08/introduction-cost-management-plan.html#comment-form' title='0 Comments'/><link rel='edit' type='application/atom+xml' href='https://www.blogger.com/feeds/1921807992956805860/posts/default/1645968343746261980'/><link rel='self' type='application/atom+xml' href='https://www.blogger.com/feeds/1921807992956805860/posts/default/1645968343746261980'/><link rel='alternate' type='text/html' href='https://www.hsetechs.info/2020/08/introduction-cost-management-plan.html' title=''/><author><name>HSE TECHS</name><uri>http://www.blogger.com/profile/06847513261058594841</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-1921807992956805860.post-7189952634372503059</id><published>2020-08-20T07:40:00.004-07:00</published><updated>2020-08-22T05:49:56.934-07:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="JSA"/><title type='text'>JSA 02 FOR MECHANICAL EXCAVATION </title><content type='html'>&lt;div dir=&quot;ltr&quot; style=&quot;text-align: left;&quot; trbidi=&quot;on&quot;&gt;&lt;div style=&quot;text-align: left;&quot;&gt;&lt;div class=&quot;separator&quot; style=&quot;clear: both; text-align: center;&quot;&gt;&lt;a href=&quot;https://1.bp.blogspot.com/-ilNkwDJpDhs/Xz6KHp6s4XI/AAAAAAAAJy0/WDm6qHUij0A4QDaGLBBaWyo7NWbV-pWXwCLcBGAsYHQ/s770/Mechanical%2BExcavation.png&quot; style=&quot;margin-left: 1em; margin-right: 1em;&quot;&gt;&lt;img border=&quot;0&quot; data-original-height=&quot;479&quot; data-original-width=&quot;770&quot; height=&quot;318&quot; src=&quot;https://1.bp.blogspot.com/-ilNkwDJpDhs/Xz6KHp6s4XI/AAAAAAAAJy0/WDm6qHUij0A4QDaGLBBaWyo7NWbV-pWXwCLcBGAsYHQ/w512-h318/Mechanical%2BExcavation.png&quot; width=&quot;512&quot; /&gt;&lt;/a&gt;&lt;/div&gt;&lt;ul style=&quot;text-align: left;&quot;&gt;&lt;li&gt;&lt;span style=&quot;font-family: &amp;quot;arial&amp;quot;;&quot;&gt;Ensure the area to be excavated is declared EOD cleared.&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: &amp;quot;arial&amp;quot;;&quot;&gt;Locate underground / aboveground services referring to the site map / drawing.&amp;nbsp;&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: &amp;quot;arial&amp;quot;;&quot;&gt;Endorsements in Excavation Notification from the concerned Teams for the services in the area to be excavated.&amp;nbsp;&amp;nbsp;&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: &amp;quot;arial&amp;quot;;&quot;&gt;Hold pre-job safety meeting&amp;nbsp;&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: &amp;quot;arial&amp;quot;;&quot;&gt;Get authorization for Hot Work Permit&amp;nbsp;&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: &amp;quot;arial&amp;quot;;&quot;&gt;Conduct Toolbox Talk&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/div&gt;&lt;iframe height=&quot;480&quot; src=&quot;https://drive.google.com/file/d/1huDEvJaMD7GB38bpHJnJex3clmgc5Ad5/preview&quot; width=&quot;640&quot;&gt;&lt;/iframe&gt; &lt;br /&gt;&lt;div style=&quot;background: yellow; border: 1px solid rgb(153, 0, 0);&quot;&gt;&lt;h3&gt;&lt;a href=&quot;https://drive.google.com/uc?export=download&amp;amp;id=1huDEvJaMD7GB38bpHJnJex3clmgc5Ad5&quot; style=&quot;color: #990000; text-align: center;&quot;&gt;Click Here for Download&lt;/a&gt; &lt;/h3&gt;&lt;/div&gt;&lt;br /&gt;&lt;br /&gt;&lt;a href=&quot;https://feedburner.google.com/fb/a/mailverify?uri=hsetechs2&amp;amp;loc=en_US&quot;&gt;Subscribe to HSE TECHS by Email&lt;/a&gt;&lt;/div&gt;</content><link rel='replies' type='application/atom+xml' href='https://www.hsetechs.info/feeds/7189952634372503059/comments/default' title='Post Comments'/><link rel='replies' type='text/html' href='https://www.hsetechs.info/2020/08/jsa-02-for-mechanical-excavation.html#comment-form' title='0 Comments'/><link rel='edit' type='application/atom+xml' href='https://www.blogger.com/feeds/1921807992956805860/posts/default/7189952634372503059'/><link rel='self' type='application/atom+xml' href='https://www.blogger.com/feeds/1921807992956805860/posts/default/7189952634372503059'/><link rel='alternate' type='text/html' href='https://www.hsetechs.info/2020/08/jsa-02-for-mechanical-excavation.html' title='JSA 02 FOR MECHANICAL EXCAVATION '/><author><name>HSE TECHS</name><uri>http://www.blogger.com/profile/06847513261058594841</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry><entry><id>tag:blogger.com,1999:blog-1921807992956805860.post-4436481217403474166</id><published>2020-08-20T06:51:00.014-07:00</published><updated>2020-08-20T07:27:18.824-07:00</updated><category scheme="http://www.blogger.com/atom/ns#" term="JSA"/><title type='text'>JSA-01 MANUAL EXCAVATION </title><content type='html'>     &lt;div class=&quot;separator&quot; style=&quot;clear: both; text-align: center;&quot;&gt;&lt;a href=&quot;https://1.bp.blogspot.com/-rsDj0dbREQg/Xz6D-ZK1WRI/AAAAAAAAJyk/4-PgXeKeHkoH0baj7_0ujhf_cNN0W63rgCLcBGAsYHQ/s988/JSA%2BManual%2BExcavation2.png&quot; style=&quot;margin-left: 1em; margin-right: 1em;&quot;&gt;&lt;img border=&quot;0&quot; data-original-height=&quot;397&quot; data-original-width=&quot;988&quot; height=&quot;206&quot; src=&quot;https://1.bp.blogspot.com/-rsDj0dbREQg/Xz6D-ZK1WRI/AAAAAAAAJyk/4-PgXeKeHkoH0baj7_0ujhf_cNN0W63rgCLcBGAsYHQ/w512-h206/JSA%2BManual%2BExcavation2.png&quot; width=&quot;512&quot; /&gt;&lt;/a&gt;&lt;/div&gt;&lt;div class=&quot;separator&quot; style=&quot;clear: both; text-align: left;&quot;&gt;&lt;div class=&quot;separator&quot; style=&quot;clear: both;&quot;&gt;&lt;div class=&quot;separator&quot; style=&quot;clear: both;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;&lt;br /&gt;&lt;/span&gt;&lt;/div&gt;&lt;div class=&quot;separator&quot; style=&quot;clear: both;&quot;&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;&lt;b&gt;Pre - work&amp;nbsp;&lt;/b&gt;&lt;/span&gt;&lt;/div&gt;&lt;div class=&quot;separator&quot; style=&quot;clear: both;&quot;&gt;&lt;ul style=&quot;text-align: left;&quot;&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Ensure the area to be excavated is&amp;nbsp; cleared.&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Locate underground / aboveground services referring to the site map / drawing.&amp;nbsp;&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Endorsements in Excavation Notification from the concerned Teams for the services in the area to be excavated.&amp;nbsp;&amp;nbsp;&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Hold pre-job safety meeting&amp;nbsp;&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-family: arial;&quot;&gt;Get authorization for Cold Work Permit&amp;nbsp;&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/div&gt;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;separator&quot; style=&quot;clear: both; text-align: center;&quot;&gt;&lt;iframe height=&quot;480&quot; src=&quot;https://drive.google.com/file/d/1Xkz5Ca3JeD47E32LY2qA6gCRXBa40kyI/preview&quot; width=&quot;640&quot;&gt;&lt;/iframe&gt;&lt;/div&gt; &lt;br /&gt;&lt;br /&gt; &lt;div style=&quot;background: yellow; border: 1px solid rgb(153, 0, 0);&quot;&gt;&lt;h3&gt;&lt;a href=&quot;https://drive.google.com/uc?export=download&amp;amp;id=1Xkz5Ca3JeD47E32LY2qA6gCRXBa40kyI&quot; style=&quot;color: #990000; text-align: center;&quot;&gt;Click Here for Download&lt;/a&gt; &lt;/h3&gt;&lt;/div&gt;     </content><link rel='replies' type='application/atom+xml' href='https://www.hsetechs.info/feeds/4436481217403474166/comments/default' title='Post Comments'/><link rel='replies' type='text/html' href='https://www.hsetechs.info/2020/08/jsa-01-manual-excavation.html#comment-form' title='0 Comments'/><link rel='edit' type='application/atom+xml' href='https://www.blogger.com/feeds/1921807992956805860/posts/default/4436481217403474166'/><link rel='self' type='application/atom+xml' href='https://www.blogger.com/feeds/1921807992956805860/posts/default/4436481217403474166'/><link rel='alternate' type='text/html' href='https://www.hsetechs.info/2020/08/jsa-01-manual-excavation.html' title='JSA-01 MANUAL EXCAVATION '/><author><name>HSE TECHS</name><uri>http://www.blogger.com/profile/06847513261058594841</uri><email>noreply@blogger.com</email><gd:image rel='http://schemas.google.com/g/2005#thumbnail' width='16' height='16' src='https://img1.blogblog.com/img/b16-rounded.gif'/></author><thr:total>0</thr:total></entry></feed>